TOPIC 02/1315 MINNOT STARTED

Two components, one service: liquidity and settlement (T2, CLM, RTGS)

T2 splits a bank's dealings with its central bank from its payments to other banks, gives each its own account, and makes moving money between them an explicit instruction.

L1–L4 are part of the Pro pass

L0 Explain simply

Most people keep money in more than one place on purpose. A current account pays the bills. A savings account holds what is not needed today. Moving money from one to the other is a deliberate act, and that is the point of the arrangement rather than a nuisance in it.

Ask why anyone bothers. The bank would happily hold one balance. The reason to split it is that a single number cannot answer two questions at once: what am I keeping, and what can I spend this afternoon? Two pots answer both at a glance.

A bank does something similar at its . One account holds its dealings with the central bank itself, such as borrowing for the day. Another account holds the money set aside for paying other banks.

Keeping them apart means a bank can see, without doing arithmetic, how much is genuinely available to settle payments right now. It also means money in the wrong pot settles nothing at all, which is the part that surprises people.

ECB diagram shows one party at a central bank with a main cash account and distinct dedicated cash accounts for T2S, RTGS and TIPS.
Read the diagram as text
  1. Identify the central bank relationship: Party A is shown under CB 1, the central bank. The main cash account sits below the party.
  2. Find the main cash account: The labels beside the main cash account show intraday credit, marginal lending or overnight deposits, and open market operations.
  3. Find the RTGS account: The centre dedicated cash account supports real-time interbank and customer payments and ancillary-system transactions in this model.
  4. Find the other settlement accounts: T2S has a dedicated account for the cash leg of securities settlement. TIPS has a separate dedicated account for instant-payment settlement.
Read the original at full size here

Use touch, a trackpad, or the arrow keys in the image area.

ECB diagram shows one party at a central bank with a main cash account and distinct dedicated cash accounts for T2S, RTGS and TIPS.
This ECB account drawing shows one party’s main cash account alongside cash accounts dedicated to different kinds of settlement.

Maya Chen, who works in payments operations at Bank Alfa, opens both balances on one screen every morning. The number that decides how her day will go is not the larger of the two. It is the one on the account the payments will actually be drawn from. (SYNTHETIC / TRAINING ONLY — every person and firm named in this topic is invented.)

That is a strange thing to have to say about money at a central bank, and it is the whole reason this topic exists. A bank can be comfortably funded and still unable to pay anybody, because being funded and being funded in the right place are not the same condition.

This topic is about that split: what sits in each half, what moves money between them, and what a payment does while the money it needs has not arrived yet.

ECB cumulative percentage chart for T2 real-time gross settlement on 30 June 2025, with processing time in seconds along the horizontal scale.
Read the diagram as text
  1. Find the share settled within 25 seconds: The ECB reports that 51.2% of payments were settled within 25 seconds that day. Read 25 seconds across the bottom and the cumulative share on the vertical scale.
  2. Move along the same curve to 36 seconds: By 36 seconds, the cumulative share was 91.1%. This includes transactions already counted at 25 seconds.
Read the original at full size here

Use touch, a trackpad, or the arrow keys in the image area.

ECB cumulative percentage chart for T2 real-time gross settlement on 30 June 2025, with processing time in seconds along the horizontal scale.
This curve shows how RTGS performed on its busiest settlement day of 2025. It gives a dated example to read alongside the lesson’s explanation of liquidity and queues.

PICTURE IT

A cellar tank, a roof tank and a pump

Picture an apartment building with two water tanks. The cellar tank holds the building's main supply, and no tap draws from it. The roof tank feeds the taps on every floor, and nothing else does.

One morning the cellar tank is full and the roof tank is empty. The building has plenty of water, but no tap can run. Each tap is open and waiting. Nothing is wrong with the taps, and replacing them changes nothing.

The fix is to run the pump that lifts water from the cellar to the roof. That is a deliberate act, and the pump log records whether the pump ran. As soon as the water arrives, the waiting taps run. The caretaker learns to look at the roof tank first, not at the cellar.

The building may also have a timer that runs the pump each morning. It may have a level switch that starts the pump when the roof tank runs low. Both work only if someone fitted and set them first.

THE REAL JOB T2 keeps a bank's dealings with its apart from its payments to other banks, so available money is easy to see.

  1. Bank Alfa sends a payment to the real-time gross settlement (RTGS) part of T2
  2. The dedicated cash account (DCA) is short, so the payment queues
  3. Bank Alfa sends a liquidity transfer from its main cash account to its dedicated cash account
  4. The transfer receives an answer
  5. The dedicated cash account is funded and the queued payment settles
How a queued payment is released in T2, the European central bank payment service. The money moves between the bank's own accounts first.

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The cellar tank: the main supply, which no tap draws fromMain cash account (MCA) in central liquidity management (CLM): dealings with the central bank
The roof tank, which alone feeds the tapsDedicated cash account (DCA) in real-time gross settlement (RTGS): where payments are drawn from
Taps left open, waiting for waterThe bank's payments to other banks, queued because their account is short
Both tanks belong to one buildingBoth accounts belong to one bank and hold central bank money
The pump that lifts water from cellar to roofA liquidity transfer, the instruction camt.050, between the bank's own accounts
The pump log, saying whether the pump ranThe answer to the transfer: a receipt, camt.025
A timer that runs the pump each morningA standing order: a set amount moved at the start of each day
A level switch that starts the pump when the roof tank runs lowA top-up rule: money added when a balance falls below a set floor

WHERE THIS PICTURE STOPS

  • In the picture a timer or level switch is easy to take for granted. In T2 a standing order or top-up rule works only if somebody set it up first. A rule nobody has set up is not a safety net.
  • The picture cannot say how long a payment may wait or what becomes of one queued at day end. The platform applies written rules for that, and the sending bank does not decide them. So do not assume the payment is simply sent the next day.
  • The pump log is a record, not water. The receipt can report that the transfer was rejected, for example when the main cash account is short too. In the flow taught here, a transfer that has been carried out is final the instant it happens.
  • A cellar tank only stores water. The main cash account is where central bank operations happen, including intraday credit. Intraday credit is credit given during the business day. The picture has no central bank. In T2 both accounts hold the bank's own money at the same central bank. So a transfer changes where the money can be used, not how much the bank holds.
  • The picture is one building with one set of taps. It cannot show that in T2 the sender addresses a payment to the system. The system settles it, then sends its own message to the receiver. A later level of this topic covers that.

HOOK

Full cellar, empty roof tank: the taps wait.

TELL A FRIEND

A bank in T2 keeps one account for its dealings with the and another for paying other banks. If the second is short, payments wait until money is moved there.

OFTEN MIXED UP WITH TARGET Services: a family, not a machine. is the whole group of settlement services. T2 is one of those services, and it has two components, each with its own account. This topic is about those two accounts. The other topic is about which service you are standing on, and each service holds its own accounts.

SEE THE PAYMENT MOVE

PICTURE THE JOURNEY

A village store with a back shed, a front rack and one keeperOpen to read the picture, how it matches the payment and where it stops.

PICTURE IT

A village store with a back shed, a front rack and one keeper

Picture a village where households settle debts in fuel logs. The council keeps a shared store. Each household has a back shed and a front rack there. Moving logs between these places is a separate action. The back shed also serves other village needs.

One household owes another a load. It gives the keeper a note. The note asks for a transfer; it does not move logs. The keeper checks the note, available stock and other controls. Some stock may be reserved. Some notes have higher priority or limits.

An eligible transfer moves the full load between racks. Several notes can also pass together if their combined movements meet the controls. Each debt is still settled in full. This differs from replacing several debts with one net debt.

A note that passes validation may wait when settlement conditions fail. More stock can help, but its arrival does not guarantee release. The keeper may fetch back-shed stock only under the agreed arrangements. Some eligible notes can trigger a set-up transfer; others cannot.

A household can ask to withdraw a waiting note where the rules allow. It checks the answer before sending a replacement. Removing an undebited note does not create new logs. A note still waiting at its applicable closing point is returned unsettled in this example. The household investigates the confirmed result before deciding what comes next. (SYNTHETIC / TRAINING ONLY: the village and households are invented.)

THE REAL JOB The Eurosystem's T2 real-time gross settlement service settles eligible euro payment obligations in full, using central-bank money and applicable settlement controls.

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
A household that owes a large load and has a place in the storeBank Alfa, the sending bank, has a large euro payment to make to NordbankWho: Bank Alfa
The household that is owed the load, with its own front rackNordbank, the receiving bank, whose settlement account is creditedWho: Nordbank
The note given to the keeper at the hatch; no log has movedThe pacs.009 payment message: an instruction only, nothing has moved yet
The keeper checks the note, stock and other controlsT2 checks the instruction and settlement conditions, including available liquidity
The council runs the store and keeps the household recordsEurosystem central banks hold the settlement accounts; T2 provides the service
The front rack, including stock subject to controlsThe RTGS dedicated cash account, with liquidity affected by reservations and limits
The back shed also serves other village needsThe main cash account in Central Liquidity Management, separate from the RTGS account
Moving logs forward under agreed arrangementsA permitted liquidity transfer from the main cash account to the RTGS account
The keeper checks usable stock and other controlsThe settlement check: available liquidity, priorities, reservations, limits and applicable windows
The full debt is discharged, including within an eligible combined movementGross obligations settle in full; eligible offsetting can reduce the extra funding needed
Logs once set down belong to the other household for goodSettlement is final the instant it happens
The receiving household confirms its own records separatelyNordbank reconciles the settled interbank transfer; no customer credit is established hereWho: Nordbank
A validated note waits when settlement conditions failThis selected QUEUED instruction is unsettled; liquidity is not the only possible queue condition
Eligible notes move together under the controlsThe selected GRIDLOCK recovery uses eligible offsetting while preserving full payment obligations
The household asks to remove a waiting note and checks the answerA permitted pre-settlement withdrawal needs confirmed status before a replacement is considered
A note reaches its applicable closing point still unsettledThe selected CUTOFF instruction is rejected unsettled; no automatic next-day resend follows
The keeper refuses a note that fails validationAn invalid receiver is one rejection example; it is not the only validation failure

WHERE THIS PICTURE STOPS

  • Logs are physical objects. Real settlement changes central-bank account balances. Final settlement of this interbank leg does not erase every underlying claim or prove a customer credit.
  • The Eurosystem operates the service and its central banks hold the accounts. The picture separates these functions to explain them, not to invent an independent settlement agency.
  • The main cash account serves wider liquidity needs. Its visible balance is not automatically available in the RTGS dedicated cash account. Transfers have their own conditions.
  • The production R2026.JUN rules include transfers triggered by certain eligible urgent, ancillary-system or high-priority queues. This is not an automatic unlimited transfer for every normal payment.
  • An eligible offsetting set can settle full payment obligations with less extra funding. The picture does not establish that every queued set is eligible or that gross means no offsetting.
  • Queue handling also depends on reservations, limits, priority and time. Funding alone does not guarantee release. A validation failure can cause rejection before settlement.
  • This selected closing branch rejects the unsettled instruction. The exact applicable window and confirmed outcome must be checked before any replacement. An unanswered request is not proof of cancellation.
  • Withdrawal is conditional and pre-settlement. Removing an instruction does not release cash that was never debited or guarantee that another payment will settle.
  • The chosen pacs.009 is an interbank transfer message example. Local branch words are teaching labels, not certified ISO reason codes. The complete current message profile is not reproduced.
  • An unknown or suspended receiver needs investigation under the actual access rules. Do not bypass a suspension by trying another route.

HOOK

Check conditions, distinguish queued from final, and confirm the outcome before replacing.

REMEMBER IT THIS WAY

A sequence: the real steps, in order.

Separate the request, the release conditions and the final account movement.

What each part of the trick stands for
In the trickWhat it stands for
CheckValidate the instruction and test usable liquidity plus other settlement controls
SettleDischarge the full gross obligation, possibly within an eligible offsetting set
DeliverReconcile the confirmed interbank outcome without inferring customer credit

TELL A FRIEND

T2 settles full payment obligations in central-bank money when the controls permit. A queue may involve liquidity or other conditions; eligible offsetting can help.

OFTEN MIXED UP WITH Two components, one service: liquidity and settlement (T2, CLM, RTGS). The and account serve different roles; transferring liquidity between them is separate from settling this payment.

MESSAGES INVOLVED

PRACTISE AND KEEP

IMPLEMENTATION RESOURCES

51 RESOURCES

EVIDENCE AT ARM'S REACH

Apply the base message definition first, then the scheme or infrastructure profile that governs this topic.

An XSD checks XML structure. A usage guideline adds profile rules, conditional fields, code restrictions, and business controls. XSD-valid does not mean scheme-compliant.

XSD + definitionBase ISO 20022

ISO 20022 message definitions and XSDs

OPEN OFFICIAL SOURCE
Usage guidelineCBPR+

CBPR+ usage guidelines

OPEN OFFICIAL SOURCE
Usage guidelineHVPS+

HVPS+ usage guidelines

OPEN OFFICIAL SOURCE
Usage guidelineCBPR+

PMPG correspondent-payment and reporting market practice

OPEN OFFICIAL SOURCE
Usage guidelineT2

T2 functional specifications, validation rules, and binding XSDs

OPEN OFFICIAL SOURCE
Usage guidelineCHAPS

CHAPS and RTGS ISO 20022 handbook and schema access

OPEN OFFICIAL SOURCE
Usage guidelineFedwire

Fedwire Funds Service ISO 20022 implementation and technical documents

OPEN OFFICIAL SOURCE
Usage guidelineCHIPS

CHIPS ISO 20022 usage-guideline resources and rules

OPEN OFFICIAL SOURCE
Teaching sampleIllustrative; no scheme profile checked

pacs.009 COV financial institution transfer — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.050 liquidity credit transfer — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.025 receipt — liquidity transfer refused — raw XML

PRO PASS
MappingCBPR+

MT202 → pacs.009 implementation mapping

PRO PASS
MappingCBPR+

MT202 COV → pacs.009 COV implementation mapping

PRO PASS
MappingCBPR+

MT200 → pacs.009 implementation mapping

PRO PASS
MappingCBPR+

MT205 → pacs.009 implementation mapping

PRO PASS
MappingCBPR+

MT201 → N × pacs.009 (batch decomposition) implementation mapping

PRO PASS
MappingCBPR+

MT203 → N × pacs.009 (batch decomposition) implementation mapping

PRO PASS
Field matrixBase ISO 20022

pacs.009 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.050 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.025 field matrix

PRO PASS
Migration notesCBPR+

MT to MX migration notes

PRO PASS
Field matrixT2

T2 RTGS implementation pack field and process matrix

PRO PASS
Test packT2

T2 RTGS implementation pack test cases

PRO PASS
BA checklistT2

T2 RTGS implementation pack BA checklist

PRO PASS
Acceptance criteriaT2

T2 RTGS implementation pack acceptance criteria

PRO PASS
Migration notesT2

T2 RTGS implementation pack migration notes

PRO PASS
Coverage gapsT2

T2 RTGS implementation pack restricted and release-specific gaps

PRO PASS
Field matrixCHAPS

CHAPS RTGS implementation pack field and process matrix

PRO PASS
Test packCHAPS

CHAPS RTGS implementation pack test cases

PRO PASS
BA checklistCHAPS

CHAPS RTGS implementation pack BA checklist

PRO PASS
Acceptance criteriaCHAPS

CHAPS RTGS implementation pack acceptance criteria

PRO PASS
Migration notesCHAPS

CHAPS RTGS implementation pack migration notes

PRO PASS
Coverage gapsCHAPS

CHAPS RTGS implementation pack restricted and release-specific gaps

PRO PASS
Field matrixFedwire

Fedwire Funds Service implementation pack field and process matrix

PRO PASS
Test packFedwire

Fedwire Funds Service implementation pack test cases

PRO PASS
BA checklistFedwire

Fedwire Funds Service implementation pack BA checklist

PRO PASS
Acceptance criteriaFedwire

Fedwire Funds Service implementation pack acceptance criteria

PRO PASS
Migration notesFedwire

Fedwire Funds Service implementation pack migration notes

PRO PASS
Coverage gapsFedwire

Fedwire Funds Service implementation pack restricted and release-specific gaps

PRO PASS
Field matrixCHIPS

CHIPS implementation pack field and process matrix

PRO PASS
Test packCHIPS

CHIPS implementation pack test cases

PRO PASS
BA checklistCHIPS

CHIPS implementation pack BA checklist

PRO PASS
Acceptance criteriaCHIPS

CHIPS implementation pack acceptance criteria

PRO PASS
Migration notesCHIPS

CHIPS implementation pack migration notes

PRO PASS
Coverage gapsCHIPS

CHIPS implementation pack restricted and release-specific gaps

PRO PASS
Profile packCBPR+

CBPR+ implementation pack

PRO PASS
Profile packHVPS+

High-value payments implementation pack

PRO PASS
Profile packT2

T2 RTGS implementation pack

PRO PASS
Profile packCHAPS

CHAPS RTGS implementation pack

PRO PASS
Profile packFedwire

Fedwire Funds Service implementation pack

PRO PASS
Profile packCHIPS

CHIPS implementation pack

PRO PASS
Sources for this topic — 6 sources
  1. Official requirementR2026.JUN

    T2 professional-use documents, binding XSDs and validation rules ↗ — European Central Bank · T2 UDFS — CLM and RTGS components

    Provides current T2 user detailed functional specifications, RTGS and CLM documentation, business validation rules, MyStandards guidance and binding XSD packages. · Checked 2026-07-19

    The ECB publishes multiple release lines on the same page; implementations must select the release effective for their test and go-live window.

  2. Scheme-specific rule

    TARGET Services ↗ — European Central Bank · T2 service description — central liquidity management and RTGS

    The Eurosystem's own page for TARGET Services, the family of settlement services it runs in central bank money.

    Cited here for the membership of that family, which is four rather than three. T2 settles payments, T2S settles securities, TIPS settles instant payments, and the Eurosystem Collateral Management System manages the assets banks pledge in Eurosystem credit operations. ECMS is the one most often left out of the list, and it is the one that decides how much intraday credit a participant can raise.

    Cited too for the shape underneath them. T2 itself has two components, central liquidity management and RTGS, and the central liquidity management function serves the other services rather than T2 alone. That is what makes the family one liquidity position reached through several settlement services, rather than four separate systems that happen to share a name. · Checked 2026-08-24

    T2 replaced TARGET2 on 20 March 2023. Detailed user functional specifications are published separately in the ECB's professional-use documents section.

    Widened on the access date, because the previous applicability named only T2 and central liquidity management and an interview question was written from it that enumerated all four. The enumeration is corroborated from independent web-search excerpts including the Eurosystem's own T2 page and its TARGET Services annual report; the publisher's index page timed out on the day, so nothing is quoted from it directly.

    The fourth service went live during the life of this registry rather than existing all along, which is why an older three-service description is a stale fact rather than a wrong one. Cite the live page before relying on the membership of the family.

    The index page still does not publish the ECMS go-live date. That date is on ecb-ecms-launch-press-2025.

  3. Market practice

    Swift Inform Copy ↗ — Swift · Y-copy holds the original at Swift, copies it in full to the authorising party and delivers only if approved; T-copy delivers as usual with an information-only copy; the service was called FIN Copy and is now Inform Copy. search excerpt, page not opened

    Provider description of observe-versus-authorise copy modes. Full/partial payload depends on configuration; do not infer it from the T/Y mode alone or project historical TARGET2 settings onto current T2. · Checked 2026-11-06

    Current Swift product page opened 6 November 2026: Inform/Copy distinguishes T-copy real-time duplication from Y-copy controlled delivery. This is a provider product description, not a scheme rulebook. Copy payload is separately configurable: official current Swift glossary search text describes full or partial copies, but the glossary PDF redirected to login and was not read in full. Historical TARGET2 UDFS Book1 v12.01 (26 October 2018) documents its full-copy Y configuration; that is not a universal definition of Y-copy or current T2 routing.

  4. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: The current-account and savings-account analogy is a teaching device: a main cash account is not a savings product and carries obligations an ordinary account does not. Ancillary system settlement procedures are named but not described. No amounts, limits, cut-off times or release identifiers are quoted, because those are release-specific and would date.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

  5. Scheme-specific ruleR2026.JUN clean 22 January 2026

    T2 RTGS User Detailed Functional Specifications, release R2026.JUN ↗ — European Central Bank · R2026.JUN: liquidity transfer functionality, standing and rule-based transfers; current production reference checked 6 November 2026

    Full primary PDF opened; selected sections read 6 November 2026: account/participation/queue and AS rules, receipt/liquidity-transfer usage, §12.4.3.3 p774 permits only 1 transaction in pacs.008.001.08. This is the clean R2026.JUN edition, not the older revised endpoint. Other releases remain separate. · Checked 2026-11-12

    Full primary PDF opened; selected sections read 6 November 2026: account/participation/queue and AS rules, receipt/liquidity-transfer usage, §12.4.3.3 p774 permits only 1 transaction in pacs.008.001.08. This is the clean R2026.JUN edition, not the older revised endpoint. Other releases remain separate.

    Re-checked 12 November 2026: production teaching still uses R2026.JUN; Bundesbank T2 R2026.NOV pack schedules production deployment 28 November 2026.

  6. Scheme-specific ruleR2026.JUN clean 22 January 2026

    T2 RTGS User Detailed Functional Specifications, release R2026.JUN ↗ — European Central Bank · R2026.JUN clean 22 January 2026: selected full RTGS specification sections read 6 November 2026; account/queue rules, liquidity-transfer outcomes and §12.4.3.3 p774 single-transaction pacs.008.001.08

    Full primary PDF opened; selected sections read 6 November 2026: account/participation/queue and AS rules, receipt/liquidity-transfer usage, §12.4.3.3 p774 permits only 1 transaction in pacs.008.001.08. This is the clean R2026.JUN edition, not the older revised endpoint. Other releases remain separate. · Checked 2026-11-12

    Full primary PDF opened; selected sections read 6 November 2026: account/participation/queue and AS rules, receipt/liquidity-transfer usage, §12.4.3.3 p774 permits only 1 transaction in pacs.008.001.08. This is the clean R2026.JUN edition, not the older revised endpoint. Other releases remain separate.

    Re-checked 12 November 2026: production teaching still uses R2026.JUN; Bundesbank T2 R2026.NOV pack schedules production deployment 28 November 2026.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.