SOURCING REGISTER / THE NEGATIVE RESULTS

What we looked for, and could not find.

Specifications that were searched for and never obtained: 227 entries, 1617 queries, the date each ran, and what would change the answer.

Nothing here is a claim about the world. Each entry is a claim about a search.

WHAT EACH VERDICT MEANS

PUBLISHED TO MEMBERS ONLY
The publisher put this behind a login, a membership or a purchase. That is a fact about the document, and it does not change until the publisher changes it.
PUBLISHED, BUT WE COULD NOT RETRIEVE IT
The document is published openly and the machine that builds this site could not fetch it. That is a fact about us, not about the publisher, and it is the kind that can be fixed.
SEARCHED, NO VERDICT YET
The search ran and stopped short of a verdict. It is recorded so the next pass starts from where this one left off rather than from nothing.

PUBLISHED TO MEMBERS ONLY — 56

PUBLISHED, BUT WE COULD NOT RETRIEVE IT — 69

SEARCHED, NO VERDICT YET — 102

Searches recorded
227
Queries run
1617
PUBLISHED TO MEMBERS ONLY
56
PUBLISHED, BUT WE COULD NOT RETRIEVE IT
69
SEARCHED, NO VERDICT YET
102
Claims checked and not confirmed
8
Last swept
2026-11-14

TWO KINDS OF WALL, AND WHY WE KEEP THEM APART

A specification you cannot read is not always somebody else’s fault. Sometimes the publisher put it behind a membership. Sometimes the document is open and this site could not fetch it. That is a fact about us, and it can be fixed.

Keeping the two apart matters. When this register was re-swept on 2026-11-14, thirteen entries changed verdict. Nearly all in the same direction: the publisher had not been hiding anything. A register that recorded only “not available” would have left those publishers wrongly accused.

CLAIMS THAT GO AROUND, AND FAILED A CHECK

These are not missing documents. Each is a statement about how a payment system works that was checked and did not stand up. “Not confirmed” is not the same as “false”. The reason beside each one says which we are entitled to.

  • That the Swiss-franc LSV+/BDD direct-debit procedures run until 30 September 2028, and that SIX's euroSIC discontinuation page cannot be fetched

    CHECKED 2026-08-23 3 QUERIES

    This was written on the site and had to be taken back off it. Two glossary terms carried 30 September 2028 as the end of the Swiss-franc LSV+/BDD procedures, and the registry note for six-eurosic-discontinuation carried the same date as source metadata — which is worse, because it is the field an author checks before writing.

    The page contains no occurrence of 2028 at all. Not in the rendered text and not in the raw HTML, checked on 165,406 bytes fetched at HTTP 200. It says nothing whatever about an end date for the Swiss-franc procedures. Its only mention of Swiss francs is that QR-bill Implementation Guidelines version 2.4 require no technical change for CHF invoicing.

    The second half of the old note was wrong in the same way and is what let the first half survive: it said a full-page fetch was unavailable, so nobody re-checked the date against the page. A caveat that says a document could not be opened is not a neutral disclosure — it retires the claim beside it from scrutiny. Treat every one of them as a task rather than as a fact.

    What the page does carry: 31 December 2027 as euroSIC's discontinuation date and last clearing day, 30 August 2027 as the last date for submission and approval of LSV+/BDD requests in EUR, and 31 August 2027 as the last requested processing date. It gives no date for the board decision either, so do not attribute one.

  • That the NEFT field tag :5561: carries the sender's name

    CHECKED 2026-08-04 3 QUERIES

    Three queries named 5561 explicitly and none returned a NEFT field for it, while the neighbouring tags probed in the same queries all resolved with names and several with format specifications. So the searches were reaching the field tables and simply did not find this tag in them. One summariser stated the negative outright. That is a genuine negative about what was searched rather than proof no such tag exists, and it is exactly strong enough to keep the tag off any page until somebody reads the publisher's own table.

  • That NEFT adopted ISO 20022 in December 2024

    CHECKED 2026-08-04 2 QUERIES

    The one specific date encountered traces to an automatically generated encyclopedia page, which is not a publisher. Worse, search on this subject is contaminated by a cross-border coexistence deadline that several summarisers offered as though it governed India's domestic retail rail. It does not, and repeating that conflation would be a factual error with a plausible-looking citation behind it. The mapping from the NEFT message set to ISO 20022 is well attested in shipping vendor documentation and can be written; the date and the mandate status cannot.

  • That the Banco Central do Brasil's STR messages — STR0004 and its siblings in the Catálogo de Serviços do SFN — are ISO 20022 messages

    CHECKED 2026-08-05 4 QUERIES

    The claim is false and it is easy to arrive at honestly, which is why it needs recording rather than merely avoiding. Three true facts sit next to each other and invite the wrong conclusion: Brazil's instant-payments infrastructure really does run ISO 20022; the Banco Central really did run an ISO 20022 subgroup for funds transfers and publish its final document with annexes on flows and field-filling options; and search summarisers offered both of those in answer to questions about the STR.

    But the catalogue's own Volume I describes XML validated against the Banco Central's own XSDs inside a BCMSG and SISMSG envelope, its messages are named STR0004 rather than pacs.008, and its fields are Portuguese abbreviations such as NumCtrlIF, ISPBIF and VlrLanc.

    The subgroup's final document is the deciding point and reads the other way from how it is usually quoted: it analysed 256 standard SPB messages for equivalence to 13 ISO 20022 messages, which is a comparison between two standards rather than a statement that they are one. Anyone writing an STR record must treat the catalogue as a proprietary XML dialect and must not reach for the iso20022 standard on this site to hold it.

  • That the EPC QR code's unstructured remittance line holds 70 characters, its beneficiary-to-originator line 95, and its purpose code 35 alphanumeric characters

    CHECKED 2026-08-05 2 QUERIES

    A search summarisation over the publisher's own documents returned those three figures together, and all three are contradicted by the code that actually builds these payloads. Six open implementations in six languages independently enforce 140 characters for the unstructured line, 70 for the beneficiary-to-originator line and 4 for the purpose code, and they agree with each other to the character; a seventh slices at 141 and 71, which is an off-by-one against the same numbers rather than a different reading.

    The summarisation also reuses 70 for a line where 70 is the neighbouring element's maximum and 35 for a line where 35 is the structured reference's, which is the shape of a machine conflating adjacent rows of a table it did not quote.

    Do not restate these figures from a summariser. They are only settleable by opening EPC069-12, which was not reachable.

  • That Mexico's Comprobante Electrónico de Pago is specified, published or issued by the Servicio de Administración Tributaria, the tax authority

    CHECKED 2026-08-05 3 QUERIES

    This one was written down on this site and had to be taken back off it, which is why it belongs here rather than in a commit message. The registry entry for the tax authority's schema said the CEP's XML structure is published by the tax authority, and the topic that cited it repeated the claim to readers. It is the wrong institution: Banco de México issues the receipt, seals it and serves it from its own portal, and what the tax authority publishes is a complement schema for carrying a receipt's fields into an electronic invoice — a different document, for a different purpose.

    The proof is mechanical rather than rhetorical. A CEP as the central bank serves it is not an instance of that schema at all: its root element is not the schema's root, it declares no namespace, and it carries a claveRastreo attribute the schema does not permit, all three confirmed with a validator.

    The mistake is easy and will be made again, because the digital-seal machinery in the receipt resembles the machinery Mexican tax documents use and because the only published description of the fields really does sit on the tax authority's site. Cite that schema for the fields; never for the artefact.

  • That India's prepaid payment instruments are licensed as closed, semi-closed and open — that the three-way split is the classification in force

    CHECKED 2026-08-23 4 QUERIES

    This is the claim an Indian prepaid-instrument page would most naturally be built on, and the regulator's own document retires it in a footnote.

    Footnote 1 of the Master Directions on Prepaid Payment Instruments opens "Earlier, PPIs were classified under three types viz. (i) Closed System PPIs, (ii) Semi-closed System PPIs and (iii) Open System PPIs", describes each of the three in that past tense, and closes "This classification has since been modified." That closing sentence occurs exactly once in the document, and nothing else in the text restores the split.

    What is in force is in paragraph 2.8: "PPIs that require RBI approval / authorisation prior to issuance are classified under two types viz. (i) Small PPIs, and (ii) Full-KYC PPIs." A Small PPI is opened on minimum details and may be used only to purchase goods and services, with funds transfer and cash withdrawal not permitted. A Full-KYC PPI is opened after Know Your Customer completion and may also be used for funds transfer and cash withdrawal.

    One piece of the old vocabulary survives, and it is the piece worth keeping. Paragraph 2.1 still defines a Closed System PPI and says its issuance or operation "is not classified as a payment system requiring approval / authorisation by RBI and are, therefore, not regulated or supervised by RBI." So closed names a perimeter rather than a licence class, and semi-closed and open name neither.

    The mistake is easy to make honestly, which is why it is recorded here rather than only avoided. Every summary written before the change says three; the words are still in everyday market use; and the document's own consolidation table lists a 2019 circular introducing a new type of semi-closed PPI, so a search inside the publisher's own page returns the replaced vocabulary. Read paragraph 2.8 before writing the licensing distinction, and treat any three-way version as dated.

  • That the Agile Test Leadership at Scale syllabus or its body of knowledge gives a step-by-step facilitation checklist, with agenda and timebox guidance

    CHECKED 2026-10-25 10 QUERIES

    A search excerpt of the hands-on exercise guidance said a facilitation checklist was mentioned. The first eight searches could not open the syllabus to check. The syllabus text was then read in full from a mirror copy. Section 1.2 defines facilitation only in general terms. It means encouraging people to use their own knowledge and skills to reach a desired outcome. It also builds shared responsibility for quality. It has no checklist, agenda guidance or timebox guidance.

    The French translation of the body of knowledge was also read in full. Its section 1.2.3 describes facilitation as helping people reach an outcome or decision and gives a value stream mapping workshop as the worked example. It has no checklist either. The hands-on exercise guidance itself was not read. So the claim is shown to be wrong for the syllabus and the body of knowledge, and left open for that guidance. The lesson on quality coaching therefore teaches its own five-part pattern and says the syllabus gives none.

THE REST OF THE EVIDENCE

  • The source registryWhat this site is checked against. Every rulebook, standard and regulatory publication behind the content, with the version verified and the date last checked.
  • CoverageWhich topics are written to which depth, what passed the dated editorial audit, and what is deliberately out of scope.