TOPIC 31/3616 MINNOT STARTED

One corporate payment, start to statement: the MT (message type)-era lifecycle

One company payment walked from the MT101 request to the MT940 statement, taught honestly as the older and fallback lifecycle, not the current default.

L1–L4 are part of the Pro pass

L0 Explain simply

Follow one payment from the first request to the bank statement that proves it, and ask three plain questions at every step. Who tells whom? What do they say? What proof is left behind? That walk is this topic. The messages are in (message type), short for message type, the older message style of Swift, the network banks use to talk to each other. (SYNTHETIC / TRAINING ONLY: Asha Traders, Bank Alfa, Meridian Bank, Nordbank and Northstar Components are invented.)

Be honest about what this is. It is the . It is the older way, and it is also the back-up way. The newer style, , written MX (the ISO 20022 message format), now carries bank-to-bank payment instructions. For a while both styles ran side by side, and that overlap was called coexistence. For those instructions it has ended, and the dated facts on this page give the exact dates. This restriction concerns the in-scope cross-border FI (financial institution) payment instructions. Agreed MT reporting and corporate FIN (Swift's store-and-forward message service) services, and eligible uses outside that scope, are not automatically contingency or retired.

Now the walk. Asha Traders asks Bank Alfa to pay Northstar Components. The ask is a , an MT101. Bank Alfa checks the request and takes the money from Asha's account. It may tell Asha about the debit with an MT900. Then Bank Alfa sends the payment itself, an MT103, towards Nordbank, the supplier's bank. Both banks hold an account at Meridian Bank, so Meridian Bank is the middle step.

Meridian Bank moves the money by changing two numbers in its own books: less for Bank Alfa, more for Nordbank. It may tell Nordbank with an MT910, which says an account was credited. Meridian Bank passes the MT103 on, and Nordbank pays Northstar Components. The message is the instruction. The change in the books is the money. Keep those two apart.

After that come the proofs. , a tracking service, lets the banks and Asha follow the payment under one shared reference. Bank Alfa sends Asha account reports: an MT942 during the day and an MT940 (customer statement) at day end. Bank Alfa's own account at Meridian Bank gets an MT950 (bank statement) from Meridian Bank. A report is evidence after the fact. It does not move money.

Some parts still run on MT. Account reports are one. Their move to the newer camt style, the ISO 20022 account-report messages, is planned for a later date than the payment instructions, and the dated fact on this page gives it. A company's own MT101 to its bank is a separate question. Some bank guidance says corporates can still send it, but each bank sets its own timetable, so check yours. A failure at any step is the control working, not the system breaking.

Simple picture: real payments often use more banks, and every bank may add its own checks. This page walks one clean route.

Scope: this is a synthetic MT-era instruction journey. CBPR stands for Cross-Border Payments and Reporting. Since 22 November 2025, in-scope cross-border payment instructions use ISO 20022 or the specified temporary contingency treatment. This did not retire corporate FIN reporting or every domestic/internal MT use. Check the service and message type before applying the cutover.

PLAIN WORDS · 1 in this section
cutover
the switch from an old system to a new one

PICTURE IT

A book borrowed through a library network

You want a book held by a library in another town. You fill in a loan request at your own library. They mark your card and send a request slip to the other town's library. A regional store moves the book between the two libraries' deposit shelves. The other library tells its reader the book is ready. At month end you get a loan statement. The slip, the shelf move and the statement are three different things.

THE REAL JOB The (message type) era lifecycle shows, message by message, who asked, who paid, who was credited and who can prove it.

  1. Request: the MT101 to the bank
  2. Debit: the MT900 advice
  3. Instruction: the MT103 sent on
  4. Settlement: two balances change at the middle bank
  5. Credit advice: the MT910 to the receiving bank
  6. Supplier credited by its own bank
  7. Reports: an MT942 interim report, an MT940 statement and a bank-to-bank statement, the MT950
The walk in order, from the request to the statement

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The loan request you fill in at your own libraryThe MT101 request from Asha Traders to its bank
The mark on your card saying one book is outThe MT900 debit advice for one booked debit
The request slip sent to the other town's libraryThe MT103 customer payment instruction towards Nordbank
The regional store moving the book between two deposit shelvesMeridian Bank changing two balances in its own books
The note to the other library that its shelf now holds the bookThe MT910 credit advice to Nordbank
The loan statement you get at month endThe MT940 statement, evidence after the fact

WHERE THIS PICTURE STOPS

  • A book is a physical thing that moves. Money in this lifecycle moves only as entries in the books of banks, so there is nothing to carry.
  • A library network is the normal way to borrow across towns. The MT (message type) era lifecycle is the older and fallback way for bank-to-bank payment instructions. The picture must not suggest it is the default.
  • The picture has one regional store. Real routes can have more middle banks, and each can screen, hold or take a fee.

HOOK

The slip is not the book; the entry is the money.

TELL A FRIEND

The (message type) era lifecycle is the older, fallback way a company payment runs on Swift: request, debit, instruction, settlement, credit advice, then reports. Each message proves one thing, and only the supplier's own bank credit proves the supplier was paid.

OFTEN MIXED UP WITH The Cross-Border Payments and Reporting Plus (CBPR+) corporate payment, start to finish. The newer corporate lifecycle tells the same payment story in ISO 20022 messages and is the current style for bank-to-bank instructions. This topic is the older and fallback (message type) version, and some MT steps, such as a debit advice, have no tidy twin there.

Sources & standards — 2 sources
  1. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

    CBPR+ roadmap beyond November 2025 ↗ — Swift · Post-coexistence NAK and contingency-conversion treatment; message-specific roadmap beyond November 2025

    Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

    Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

    Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

    Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

    The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

    Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

    The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  2. Official requirement

    ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence for in-scope FI-to-FI payment instructions

    Describes current CBPR+ adoption, the 22 November 2025 end of coexistence for in-scope FI-to-FI payment instructions, later migration work and the structured-address milestone. That milestone was previously due in November 2026 and has since been deferred (see swift-sr2026-controlled-extension-2026). · Checked 2026-07-18

    Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.

CURRENT AS CHECKED

4 FIGURES
  • Swift CBPR+ FI-to-FI payment instructions

    Swift coexistence for in-scope -to-FI payment instructions ended on 22 November 2025; that deadline did not retire every MT reporting, initiation, investigation or correspondence message.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 2 sources
    1. Official requirement

      ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence — 22 November 2025

      Describes current CBPR+ adoption, the 22 November 2025 end of coexistence for in-scope FI-to-FI payment instructions, later migration work and the structured-address milestone. That milestone was previously due in November 2026 and has since been deferred (see swift-sr2026-controlled-extension-2026). · Checked 2026-07-18

      Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.

    2. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Message-specific roadmap beyond November 2025

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  • Swift post-November-2025 contingency processing

    After coexistence, treatment differs by : some instructions are NAKed and selected messages can enter temporary , chargeable since 1 January 2026. This is not continued normal MT-MX coexistence.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 1 source
    1. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Post-coexistence NAK and contingency-conversion treatment

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  • Swift CBPR+ account reporting messages

    The published (Cross-Border Payments and Reporting Plus) update from ING (a large Dutch bank) gives a plan for payment reporting. The end of (message type) and camt coexistence for reporting (MT940 (customer statement) and MT950 with camt.053) is planned for November 2028.

    Swift's roadmap labels this step SR 2028. Its exact month was not confirmed from Swift's own page. Receiving is planned to become mandatory from November 2027. Swift's March 2026 roadmap shows these dates as planned, not final. Until then the MT reports keep running on (Swift's messaging network).

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 1 source
    1. Scheme-specific ruleJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Statement and reporting messages, planned end of coexistence in SR 2028 (Swift roadmap); November 2028 month from The published CBPR+ update; evidence is a search excerpt, page not opened

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  • Swift FIN interbank MT101 relay

    Swift's roadmap was due to discontinue the interbank (request for transfer) relay over (Swift's messaging network) by 14 November 2026. A CBPR+ (Cross-Border Payments and Reporting Plus) pain.001 relay was to replace it.

    On 27 August 2026 Swift deferred that migration, alongside the rest of that year's payments changes, with no replacement date set. Swift has said an update is to follow; a bank page gives December 2026. Once coexistence ends, a single MT101 goes through chargeable and a multiple MT101 is NAKed.

    The company-to-bank MT101 is a separate question. Corporates on (Swift's service for corporates) or a were never in that FIN deadline.

    CHECKED 2026-08-27RECHECK BY 2027-01-05

    Sources & standards — 2 sources
    1. Official requirement

      Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Deferral of SR2026 payments changes, including the interbank MT101 relay retirement, and the promised update by December 2026

      Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

      Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

      Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

    2. Official requirement

      Swift Standards MT (annual standards releases) ↗ — Swift · The original requirement now under deferral: interbank MT101 relay retirement date

      Defines the MT message standards (including MT101, MT103, MT202/202 COV, and the MT9xx statement messages) exchanged over the Swift FIN network, maintained through annual standards releases. · Checked 2026-11-12

      Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.

      Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.

      Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.

SEE THE PAYMENT MOVE

PICTURE THE JOURNEY

A frame shop, a glass factory and a ledger hall with one card per officeOpen to read the picture, how it matches the payment and where it stops.

PICTURE IT

A frame shop, a glass factory and a ledger hall with one card per office

Picture a frame-shop owner who must pay a glass factory in another country for a load of glass. She keeps her money at her local cashier office. The glass factory keeps its money at a different cashier office abroad. The two offices have no direct dealings. Each keeps a balance card at a ledger hall, and a relay office carries notes between them.

She signs an order slip and hands it to her cashier office. The slip is only a request. The cashier checks that she may order and that her money is there. It also checks the and that no name is on a banned list. If the slip cannot be carried out, she hears in whatever way she and the office agreed. Otherwise the office takes the amount from her account and gives her a small slip that says one amount has left.

The office then writes the payment letter and hands it to the relay office. The relay office checks that the letter follows the printed form, keeps it safe until the next stop is ready and passes it on. It never touches a balance card. The ledger hall reads the letter and checks the names again for itself. Then it lowers her office's card and raises the glass factory's office's card. That entry is the moment the amount changes hands. The hall sends the glass factory's office a credit slip, and the payment letter follows through the relay office.

The glass factory's office checks the letter, matches it to the credit slip and adds the amount to the glass factory's account. Through the day the frame-shop owner receives a balance sheet and a list of entries, and at close a day statement. The ledger hall also sends each cashier office a copy of its own card, and the office compares that copy with its own book.

Several other turns are possible. If the ledger hall keeps a small handling fee, less glass money arrives. If the hall refuses the letter before it makes any entry, her office puts the amount back in her account. If the glass factory's office finds the account closed, it sends the amount back as a new payment the other way. If an office needs more detail, it posts a query note and waits for the reply. If the two copies of a card disagree, a clerk checks whether an entry is merely late or truly missing. If she asks for the amount back after the glass factory is paid, that is only a request, and the glass factory's office can refuse. (SYNTHETIC / TRAINING ONLY: the frame-shop owner and the glass factory are invented.)

THE REAL JOB A company pays a supplier abroad through its bank in the older Swift message format, with confirmations, reports, queries and returns.

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The frame-shop owner signs an order slip for her cashier officeAsha Traders asks Bank Alfa to pay with the request message MT101Who: Asha Traders
The cashier checks her right to order, her money, the cut-off and the namesBank Alfa validates the authority, funds, cut-off, routing and screeningWho: Bank Alfa
The office takes the amount and gives her a small slipBank Alfa debits Asha Traders; where agreed, MT900 confirms that one debitWho: Bank Alfa
The relay office checks the printed form, keeps the letter safe, passes it onSwift FIN, the message network, checks the format and forwards messages; it holds no account
The payment letter that her office posts to the ledger hallThe customer payment message MT103 is the instruction, not the money
The ledger hall reads the letter and checks the names for itselfMeridian Bank validates and screens the payment for itselfWho: Meridian Bank
The hall lowers one office's card and raises the other'sBook transfer: Meridian Bank debits Bank Alfa's account and credits Nordbank's accountWho: Meridian Bank
A credit slip goes to the glass factory's officeMT910 tells Nordbank that its account at Meridian Bank was credited
The glass factory's office matches the letter to the slip, then creditsNordbank validates, screens and matches the payment before it pays its customerWho: Nordbank
The glass factory's account goes upNorthstar Components, the supplier, is credited by NordbankWho: Northstar Components
A balance sheet and a list of entries by day, a statement at closeMT941 gives balances, MT942 lists daytime entries and MT940 is the day statement
The owner ticks each statement line against her own order slipAsha Traders matches the MT940 entry to its own request, MT101
The hall sends each office a copy of its own cardMT950 reports the entries on Bank Alfa's account at Meridian BankWho: Meridian Bank
A clerk lays two cards side by side and finds an entry on only oneMaya Chen compares Bank Alfa's books with the MT950; a lone entry is a breakWho: Maya Chen
An entry written today on one card and tomorrow on the otherA timing difference clears itself; an unmatched entry gets a query, MT199
The cashier cannot carry out the slip and tells her in the agreed wayA rejected request: no MT103 is sent and funds stay with Asha Traders
The hall keeps a small handling fee as the letter passesShared charges: Meridian Bank takes off a fee, so the supplier receives lessWho: Meridian Bank
The hall refuses the letter before it makes any entryREJT: no value is booked, so Bank Alfa restores the customer balance
The glass factory's office finds the account closed and sends the amount backRETN: Nordbank returns settled funds as a second payment the other wayWho: Nordbank
An office posts a query note, and the reply comes backMT195 asks, MT196 answers; MT199 is the free-text version
The owner asks her office to get the paid amount backBank Alfa sends MT192, a cancellation request; it asks and reverses nothingWho: Bank Alfa
The glass factory's office agrees to hand it back, or refusesMT196 answers: CNCL accepted, with a return to follow, or RJCR refused

WHERE THIS PICTURE STOPS

  • In the picture the owner could ask her office to get the amount back. In the journey that is a cancellation request, MT192. It only asks. The beneficiary's bank can refuse it, and the first settlement stands.
  • The slips and sheets in the picture look like proof that the glass factory was paid. They are not. MT900 confirms one debit, and MT940 lists entries on Asha Traders' own account. Only the credit at Nordbank shows the supplier was paid.
  • The ledger hall in the picture is one keeper with a card for each office. This journey settles on one correspondent's books. Other routes use more banks or a shared payment system, and the picture cannot show which.
  • The picture does not say how current this route is. This journey is the older Swift message format, and a new build does the same job in ISO 20022.
  • The handling fee in the picture is small and illustrative. In the journey the charge option, such as SHA for shared, decides who bears each bank's fee. The message trail is the only record of what was taken.
  • The cashier in the picture tells the owner of a failed slip in an agreed way. A real corporate service is agreed bank by bank, so how a failure reaches the customer varies. Swift's rules have the bank send a rejection advice, normally an MT195 (a query), though an MT199 (a free-format message) is allowed. The ISO 20022 journey uses the structured pain.002 status report.

HOOK

Messages ask, report and query. One ledger entry settles.

REMEMBER IT THIS WAY

A chunk: a long list grouped so it is easier to hold.

Group the account reports by what they hold: MT941 balances, MT942 daytime entries and MT940 the day statement.

What each part of the trick stands for
In the trickWhat it stands for
MT941gives balances
MT942lists daytime entries
MT940is the day statement

TELL A FRIEND

In the older Swift message format, one payment brings a request, the payment message, confirmations, reports and queries. The between banks is what settles it.

OFTEN MIXED UP WITH What the network says back (ACK, NAK). That topic teaches the network's accepted-or-refused answer to one message. This journey shows the bank answers, such as debit, credit, reject, return and statement, which arrive as other messages.

MESSAGES INVOLVED

PRACTISE AND KEEP

IMPLEMENTATION RESOURCES

40 RESOURCES

EVIDENCE AT ARM'S REACH

Apply the base message definition first, then the scheme or infrastructure profile that governs this topic.

An XSD checks XML structure. A usage guideline adds profile rules, conditional fields, code restrictions, and business controls. XSD-valid does not mean scheme-compliant.

Usage guidelineCBPR+

PMPG correspondent-payment and reporting market practice

OPEN OFFICIAL SOURCE
Teaching sampleIllustrative; no scheme profile checked

MT103 customer credit transfer — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT101 request for transfer — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT202 COV cover payment — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT900 debit confirmation — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT910 credit confirmation — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT940 customer statement — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT941 balance report — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT942 interim transaction report — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT950 statement message — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT103 rejection convention — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT103 return convention — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT199 free-format payment message — raw FIN

PRO PASS
Lifecycle packIllustrative; no scheme profile checked

MT legacy and migration lifecycle — ZIP pack

PRO PASS
MappingCBPR+

MT103 → pacs.008 implementation mapping

PRO PASS
MappingCBPR+

MT202 COV → pacs.009 COV implementation mapping

PRO PASS
MappingCBPR+

MT101 → pain.001 implementation mapping

PRO PASS
MappingCBPR+

MT103 /REJT/ convention → pacs.002 implementation mapping

PRO PASS
MappingCBPR+

MT103 /RETN/ convention → pacs.004 implementation mapping

PRO PASS
MappingCBPR+

MT199 query → camt.110 implementation mapping

PRO PASS
MappingCBPR+

MT199 answer → camt.111 implementation mapping

PRO PASS
MappingCBPR+

MT900 → camt.054 implementation mapping

PRO PASS
MappingCBPR+

MT910 → camt.054 implementation mapping

PRO PASS
MappingCBPR+

MT941 → camt.052 implementation mapping

PRO PASS
MappingCBPR+

MT942 → camt.052 implementation mapping

PRO PASS
MappingCBPR+

MT940 → camt.053 implementation mapping

PRO PASS
MappingCBPR+

MT950 → camt.053 implementation mapping

PRO PASS
Field matrixSwift MT

MT101 field matrix

PRO PASS
Field matrixSwift MT

MT103 field matrix

PRO PASS
Field matrixSwift MT

MT199 field matrix

PRO PASS
Field matrixSwift MT

MT202 COV field matrix

PRO PASS
Field matrixSwift MT

MT910 field matrix

PRO PASS
Field matrixSwift MT

MT940 field matrix

PRO PASS
Field matrixSwift MT

MT900 field matrix

PRO PASS
Field matrixSwift MT

MT941 field matrix

PRO PASS
Field matrixSwift MT

MT942 field matrix

PRO PASS
Field matrixSwift MT

MT950 field matrix

PRO PASS
Test packIllustrative; no scheme profile checked

Payment lifecycle test cases

PRO PASS
Migration notesCBPR+

MT to MX migration notes

PRO PASS
Sources for this topic — 6 sources
  1. Scheme-specific rule

    Swift Standards MT (annual standards releases) ↗ — Swift · Categories 1 and 9 — MT101, MT103, MT900, MT910, MT940, MT942, MT950 usage; archival/message-record evidence, current authenticated handbook not opened.

    Defines the MT message standards (including MT101, MT103, MT202/202 COV, and the MT9xx statement messages) exchanged over the Swift FIN network, maintained through annual standards releases. · Checked 2026-11-12

    Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.

    Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.

    Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.

  2. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

    CBPR+ roadmap beyond November 2025 ↗ — Swift · Post-coexistence NAK and contingency-conversion treatment; planned end of MT and camt coexistence for reporting messages

    Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

    Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

    Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

    Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

    The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

    Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

    The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  3. Official requirement

    ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence for in-scope FI-to-FI payment instructions

    Describes current CBPR+ adoption, the 22 November 2025 end of coexistence for in-scope FI-to-FI payment instructions, later migration work and the structured-address milestone. That milestone was previously due in November 2026 and has since been deferred (see swift-sr2026-controlled-extension-2026). · Checked 2026-07-18

    Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.

  4. Official requirement

    Swift gpi (global payments innovation) ↗ — Swift · gpi tracking by UETR

    Describes Swift gpi, the cross-border payments service layer over the Swift network, including the end-to-end tracking it defines for member banks through the UETR (unique end-to-end transaction reference) and the Tracker. · Checked 2026-07-13

    Only public short overviews are used here; the full service definition and rulebook sit behind a swift.com account.

  5. Market practice

    ISO 20022 Migration: Guidance, Messaging & More ↗ — J.P. Morgan · One bank's client guidance on MT101 for SCORE and member-administered closed user group corporates; customer-to-bank end date not stated here; single bank source

    A correspondent bank's public ISO 20022 migration page, read on 2026-08-25. It restates Swift CBPR+ dates for its own clients rather than publishing those dates as Swift.

    Cited here for four client-facing statements on that page. From 14 November 2026, MT101 over Swift CBPR+ for financial institutions ends coexistence on FIN and those initiation messages migrate to pain.001v9 on FINplus. Corporate Swift members using SCORE or a closed user group are not impacted by that FIN deadline and may continue MT101, while still having to meet hybrid address requirements.

    Swift offers a charged contingency that translates a single eligible MT101 received after November 2026 into pain.001; multiple MT101 messages will not be accepted, and unstructured addresses will not be translated. Senders of pain.001 must have exchanged RMA for pain.001 before sending.

    The same page says not to use NOTPROVIDED or similar inputs for Town Name and Country. Use hybrid or structured addresses for future-value-dated payments with a value date of 14 November 2026 or later. If that is not possible before the November go-live, include Town and Country in the unstructured address lines at a minimum. · Checked 2026-08-25

    Fetched and read from the publisher URL on 2026-08-25. One bank's client guidance, not a Swift rulebook. Recheck the live page and Swift's own roadmap before using a date in a delivery plan. A failed fetch is not a finding about this page.

    This page was read two days before Swift deferred its Standards Release 2026 (SR2026) payments changes (swift-sr2026-controlled-extension-2026). The 14 November 2026 dates cited from this page are the page's own, as read on 2026-08-25. Swift has set no replacement date. The current facts swift-cbpr-unstructured-address-removal and swift-mt101-interbank-relay-retirement carry the position.

  6. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: The walk uses fictional banks, one middle bank, clean screening and no fee taken in transit; real routes have more banks and more ways to fail. The nine exception places are named, not taught, here; each has its own sibling topic.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.