TOPIC 18/3612 MINNOT STARTED

MT205 and MT205 COV: the domestic leg

The legacy message a bank used to carry a cover payment one more hop inside the destination country, and the customer names that must ride along.

L1–L4 are part of the Pro pass

L0 Explain simply

A payment that crosses a border often needs one more short leg once it arrives. The leg stays inside the destination country, from one bank to another bank in the same country.

The is a message, and is short for cover. It is the note a bank writes for that leg when the money pays for a customer's payment. MT stands for message type, the older Swift message format. Swift is the network banks use to send each other messages. The number 205 names the message.

Think of a parcel that reaches a city depot. A local courier takes it the last stretch to the right street. The courier's slip must still say who first sent the parcel and who will receive it. The MT205 COV is that slip. It names the customer on each side, and not only the banks.

Why carry the customer names on such a short leg? Every bank that touches the money must check the names on it against its own lists. A bank that sees only bank names cannot do that check. The plain is a message with no place for customer names. The cover version adds one on purpose.

Nobody is paid twice. The customer is paid once. The MT205 COV only instructs funding between institutions so that the customer's payment can settle at the far end.

Today you will meet this message mostly as the older way of doing the job. Banks now move this kind of payment in , the newer international standard for payment messages. The old message lives on in archives, in translation tools and in a contingency service. The dated facts on this page say what has changed.

If the customer names are missing or do not match, a bank may hold the payment and ask. That is a control working as designed. It is not the system breaking.

PLAIN WORDS · 1 in this section
instructs
formally tells someone to do something

PICTURE IT

A parcel and its local courier

A parcel reaches a city depot. A local courier takes it the last stretch to the right street. The courier's slip says who first sent the parcel. It also repeats the names written on the parcel. The staff at the next depot read those names before the parcel goes on.

THE REAL JOB The MT205 COV carries a one more hop inside the destination country and keeps the customer names with it.

  1. The cover arrives with sequence B
  2. The bank asks what arrived
  3. Field :52a: names the bank that began it
  4. Sequence B is passed through unchanged
  5. The MT205 COV goes to the next bank in the same country
One domestic onward leg, in order

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The depot that receives the parcelThe bank that received the cover transferWho: Meridian Bank
The courier's slipThe MT205 COV, the onward domestic message
The short ride on the same city's streetsThe hop between two banks in the same country
The name of whoever first sent the parcelField :52a:, the ordering institution, as in the plain MT205 (financial institution transfer execution)
The names copied from the parcel onto the slipSequence B with the ordering customer :50a: and the beneficiary customer :59a:
Staff reading the names before the parcel movesScreening of the customers in sequence BWho: Kabir
A slip with no names on itA plain MT205 (the onward message without customer names) used where a cover was needed

WHERE THIS PICTURE STOPS

  • A parcel is a thing. Nothing travels here. The MT205 COV is only a message, and the money moves as a credit between bank accounts.
  • The slip is not a second parcel. Only one customer is paid. Reading the cover as another payment counts one payment twice.
  • A courier writes a slip freely. Here the sequence B must be copied from the message that arrived, and a one-word difference is serious until explained.
  • A slip with no names is not always a fault. A plain MT205 is correct for a bank's own onward business. It fails only when a customer payment needs cover.
  • The picture shows one short hop. Real chains can be longer, and this is a legacy and contingency-network message. Banks now move this payment in ISO 20022, and the dated facts say what changed. The same-country limit rests on one reference site, because Swift's own guide could not be opened.
  • The synthetic waiting policy is not universal. PMPG permits early creditor credit under approved risk arrangements. COV is a funding instruction; the creditor may instead receive advice of its account credit.

HOOK

Same country, same names: the customers ride along.

REMEMBER IT THIS WAY

A rule of thumb: if you see this, think that.

Ask what arrived before choosing what to send. Customer names in, MT205 COV (the cover version of the onward message) out.

What each part of the trick stands for
In the trickWhat it stands for
What arrivedthe transfer being continued
Customer names insequence B with the ordering customer and the beneficiary customer
MT205 COV outthe onward domestic leg with sequence B passed through

It covers the domestic onward leg only, so where sender and receiver are in different countries the record points to the general transfer.

TELL A FRIEND

An MT205 COV is the old bank message that carries a one more hop inside a country. It copies the customers' names so the next bank can check them.

OFTEN MIXED UP WITH MT202 and MT202 COV. The MT202 COV (cover transfer) starts the cover leg. The MT205 COV (onward cover message) continues a leg somebody else began, inside one country. Both carry a that repeats the customers.

CURRENT AS CHECKED

4 FIGURES
  • Swift CBPR+ FI-to-FI payment instructions

    Swift coexistence for in-scope -to-FI payment instructions ended on 22 November 2025; that deadline did not retire every MT reporting, initiation, investigation or correspondence message.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 2 sources
    1. Official requirement

      ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence — 22 November 2025

      Describes current CBPR+ adoption, the 22 November 2025 end of coexistence for in-scope FI-to-FI payment instructions, later migration work and the structured-address milestone. That milestone was previously due in November 2026 and has since been deferred (see swift-sr2026-controlled-extension-2026). · Checked 2026-07-18

      Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.

    2. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Message-specific roadmap beyond November 2025

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  • Swift post-November-2025 contingency processing

    After coexistence, treatment differs by : some instructions are NAKed and selected messages can enter temporary , chargeable since 1 January 2026. This is not continued normal MT-MX coexistence.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 1 source
    1. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Post-coexistence NAK and contingency-conversion treatment

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  • Swift FIN interbank MT101 relay

    Swift's roadmap was due to discontinue the interbank (request for transfer) relay over (Swift's messaging network) by 14 November 2026. A CBPR+ (Cross-Border Payments and Reporting Plus) pain.001 relay was to replace it.

    On 27 August 2026 Swift deferred that migration, alongside the rest of that year's payments changes, with no replacement date set. Swift has said an update is to follow; a bank page gives December 2026. Once coexistence ends, a single MT101 goes through chargeable and a multiple MT101 is NAKed.

    The company-to-bank MT101 is a separate question. Corporates on (Swift's service for corporates) or a were never in that FIN deadline.

    CHECKED 2026-08-27RECHECK BY 2027-01-05

    Sources & standards — 2 sources
    1. Official requirement

      Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Deferral of SR2026 payments changes, including the interbank MT101 relay retirement, and the promised update by December 2026

      Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

      Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

      Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

    2. Official requirement

      Swift Standards MT (annual standards releases) ↗ — Swift · The original requirement now under deferral: interbank MT101 relay retirement date

      Defines the MT message standards (including MT101, MT103, MT202/202 COV, and the MT9xx statement messages) exchanged over the Swift FIN network, maintained through annual standards releases. · Checked 2026-11-12

      Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.

      Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.

      Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.

  • Swift Standards Release 2026 payments changes

    Swift announced in August 2026 that it was deferring the payments changes planned for November 2026 in 2026, and updated that announcement on 21 September 2026. Swift said it would set a new timeline for the payments changes, including postal addresses, by December 2026 at the latest.

    CHECKED 2026-10-10RECHECK BY 2027-01-05

    Sources & standards — 1 source
    1. Official requirement

      Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Controlled extension of Standards Release 2026: deferral of the November 2026 payments changes

      Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

      Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

      Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

SEE THE PAYMENT MOVE

PICTURE THE JOURNEY

A frame shop, a glass factory and a ledger hall with one card per officeOpen to read the picture, how it matches the payment and where it stops.

PICTURE IT

A frame shop, a glass factory and a ledger hall with one card per office

Picture a frame-shop owner who must pay a glass factory in another country for a load of glass. She keeps her money at her local cashier office. The glass factory keeps its money at a different cashier office abroad. The two offices have no direct dealings. Each keeps a balance card at a ledger hall, and a relay office carries notes between them.

She signs an order slip and hands it to her cashier office. The slip is only a request. The cashier checks that she may order and that her money is there. It also checks the and that no name is on a banned list. If the slip cannot be carried out, she hears in whatever way she and the office agreed. Otherwise the office takes the amount from her account and gives her a small slip that says one amount has left.

The office then writes the payment letter and hands it to the relay office. The relay office checks that the letter follows the printed form, keeps it safe until the next stop is ready and passes it on. It never touches a balance card. The ledger hall reads the letter and checks the names again for itself. Then it lowers her office's card and raises the glass factory's office's card. That entry is the moment the amount changes hands. The hall sends the glass factory's office a credit slip, and the payment letter follows through the relay office.

The glass factory's office checks the letter, matches it to the credit slip and adds the amount to the glass factory's account. Through the day the frame-shop owner receives a balance sheet and a list of entries, and at close a day statement. The ledger hall also sends each cashier office a copy of its own card, and the office compares that copy with its own book.

Several other turns are possible. If the ledger hall keeps a small handling fee, less glass money arrives. If the hall refuses the letter before it makes any entry, her office puts the amount back in her account. If the glass factory's office finds the account closed, it sends the amount back as a new payment the other way. If an office needs more detail, it posts a query note and waits for the reply. If the two copies of a card disagree, a clerk checks whether an entry is merely late or truly missing. If she asks for the amount back after the glass factory is paid, that is only a request, and the glass factory's office can refuse. (SYNTHETIC / TRAINING ONLY: the frame-shop owner and the glass factory are invented.)

THE REAL JOB A company pays a supplier abroad through its bank in the older Swift message format, with confirmations, reports, queries and returns.

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The frame-shop owner signs an order slip for her cashier officeAsha Traders asks Bank Alfa to pay with the request message MT101Who: Asha Traders
The cashier checks her right to order, her money, the cut-off and the namesBank Alfa validates the authority, funds, cut-off, routing and screeningWho: Bank Alfa
The office takes the amount and gives her a small slipBank Alfa debits Asha Traders; where agreed, MT900 confirms that one debitWho: Bank Alfa
The relay office checks the printed form, keeps the letter safe, passes it onSwift FIN, the message network, checks the format and forwards messages; it holds no account
The payment letter that her office posts to the ledger hallThe customer payment message MT103 is the instruction, not the money
The ledger hall reads the letter and checks the names for itselfMeridian Bank validates and screens the payment for itselfWho: Meridian Bank
The hall lowers one office's card and raises the other'sBook transfer: Meridian Bank debits Bank Alfa's account and credits Nordbank's accountWho: Meridian Bank
A credit slip goes to the glass factory's officeMT910 tells Nordbank that its account at Meridian Bank was credited
The glass factory's office matches the letter to the slip, then creditsNordbank validates, screens and matches the payment before it pays its customerWho: Nordbank
The glass factory's account goes upNorthstar Components, the supplier, is credited by NordbankWho: Northstar Components
A balance sheet and a list of entries by day, a statement at closeMT941 gives balances, MT942 lists daytime entries and MT940 is the day statement
The owner ticks each statement line against her own order slipAsha Traders matches the MT940 entry to its own request, MT101
The hall sends each office a copy of its own cardMT950 reports the entries on Bank Alfa's account at Meridian BankWho: Meridian Bank
A clerk lays two cards side by side and finds an entry on only oneMaya Chen compares Bank Alfa's books with the MT950; a lone entry is a breakWho: Maya Chen
An entry written today on one card and tomorrow on the otherA timing difference clears itself; an unmatched entry gets a query, MT199
The cashier cannot carry out the slip and tells her in the agreed wayA rejected request: no MT103 is sent and funds stay with Asha Traders
The hall keeps a small handling fee as the letter passesShared charges: Meridian Bank takes off a fee, so the supplier receives lessWho: Meridian Bank
The hall refuses the letter before it makes any entryREJT: no value is booked, so Bank Alfa restores the customer balance
The glass factory's office finds the account closed and sends the amount backRETN: Nordbank returns settled funds as a second payment the other wayWho: Nordbank
An office posts a query note, and the reply comes backMT195 asks, MT196 answers; MT199 is the free-text version
The owner asks her office to get the paid amount backBank Alfa sends MT192, a cancellation request; it asks and reverses nothingWho: Bank Alfa
The glass factory's office agrees to hand it back, or refusesMT196 answers: CNCL accepted, with a return to follow, or RJCR refused

WHERE THIS PICTURE STOPS

  • In the picture the owner could ask her office to get the amount back. In the journey that is a cancellation request, MT192. It only asks. The beneficiary's bank can refuse it, and the first settlement stands.
  • The slips and sheets in the picture look like proof that the glass factory was paid. They are not. MT900 confirms one debit, and MT940 lists entries on Asha Traders' own account. Only the credit at Nordbank shows the supplier was paid.
  • The ledger hall in the picture is one keeper with a card for each office. This journey settles on one correspondent's books. Other routes use more banks or a shared payment system, and the picture cannot show which.
  • The picture does not say how current this route is. This journey is the older Swift message format, and a new build does the same job in ISO 20022.
  • The handling fee in the picture is small and illustrative. In the journey the charge option, such as SHA for shared, decides who bears each bank's fee. The message trail is the only record of what was taken.
  • The cashier in the picture tells the owner of a failed slip in an agreed way. A real corporate service is agreed bank by bank, so how a failure reaches the customer varies. Swift's rules have the bank send a rejection advice, normally an MT195 (a query), though an MT199 (a free-format message) is allowed. The ISO 20022 journey uses the structured pain.002 status report.

HOOK

Messages ask, report and query. One ledger entry settles.

REMEMBER IT THIS WAY

A chunk: a long list grouped so it is easier to hold.

Group the account reports by what they hold: MT941 balances, MT942 daytime entries and MT940 the day statement.

What each part of the trick stands for
In the trickWhat it stands for
MT941gives balances
MT942lists daytime entries
MT940is the day statement

TELL A FRIEND

In the older Swift message format, one payment brings a request, the payment message, confirmations, reports and queries. The between banks is what settles it.

OFTEN MIXED UP WITH What the network says back (ACK, NAK). That topic teaches the network's accepted-or-refused answer to one message. This journey shows the bank answers, such as debit, credit, reject, return and statement, which arrive as other messages.

MESSAGES INVOLVED

PRACTISE AND KEEP

IMPLEMENTATION RESOURCES

18 RESOURCES

EVIDENCE AT ARM'S REACH

Apply the base message definition first, then the scheme or infrastructure profile that governs this topic.

An XSD checks XML structure. A usage guideline adds profile rules, conditional fields, code restrictions, and business controls. XSD-valid does not mean scheme-compliant.

Usage guidelineCBPR+

PMPG correspondent-payment and reporting market practice

OPEN OFFICIAL SOURCE
Teaching sampleIllustrative; no scheme profile checked

MT202 COV cover payment — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT205 financial institution transfer execution — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT910 credit confirmation — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT299 Category 2 free-format message — raw FIN

PRO PASS
Lifecycle packIllustrative; no scheme profile checked

MT legacy and migration lifecycle — ZIP pack

PRO PASS
MappingCBPR+

MT202 COV → pacs.009 COV implementation mapping

PRO PASS
MappingCBPR+

MT205 → pacs.009 implementation mapping

PRO PASS
MappingCBPR+

MT299 query → camt.110 implementation mapping

PRO PASS
MappingCBPR+

MT299 answer → camt.111 implementation mapping

PRO PASS
MappingCBPR+

MT910 → camt.054 implementation mapping

PRO PASS
Field matrixSwift MT

MT202 COV field matrix

PRO PASS
Field matrixSwift MT

MT910 field matrix

PRO PASS
Field matrixSwift MT

MT299 field matrix

PRO PASS
Field matrixSwift MT

MT205 field matrix

PRO PASS
Field matrixSwift MT

MT205 COV field matrix

PRO PASS
Migration notesCBPR+

MT to MX migration notes

PRO PASS
Sources for this topic — 7 sources
  1. Market practice

    Standard SWIFT (the bank messaging network) ISO15022 — message type MT205 COV (cover) ↗ — iotafinance · MT205 COV scope, parties and field 119 code COV; plain MT205 field list (search excerpts, page not opened; third-party site)

    A financial-reference site's description of the MT205 COV (cover). Cited for its scope: it passes on a domestic transfer instruction tied to an underlying customer credit transfer sent by the cover method. Sender and receiver are in the same country. It is sent by the receiver of an MT202 COV (bank-to-bank cover payment) or MT205 COV, or an ISO 20022 equivalent, to the beneficiary's financial institution. And it has a mandatory sequence for the underlying customer credit transfer. Also cited, as a single-source point, for the code COV in field 119 of the user header.

    Also cited for the plain MT205 (financial institution transfer execution) field list with presence (second excerpt, same site). · Checked 2026-10-11

    Known from a web-search excerpt only; the page was not opened. A third-party site, so every claim from it is single-source until Swift's Category 2 guide is read (see the sourcing negative swift-category-2-mt200-mt205-field-specifications). The search summary said itself that the details come from this site and not from Swift's documentation. That no field-level specification for sequence B of the MT205 COV (cover) was surfaced. Label market-practice at most.

  2. Scheme-specific rule

    Swift message standards, Category 2 reference guide (institution transfers) ↗ — Swift · Swift Standards MT November 2023, Category 2, MT205 COV pp. 152–155: Block 3 fields 119/121, format tables for sequences A/B, rules C1/C2 and onward references; read through the issuer PDF.

    Swift's reference guide for the bank-to-bank transfer messages, including the own-account and general transfers, the cheque truncation message, the notice to receive and the cheque non-payment advice. · Checked 2026-10-11

    The guide sits in Swift's knowledge centre, which is member-only. Only search excerpts were read. Known only from a web-search excerpt; the page was not opened.

  3. Scheme-specific rule

    MT to ISO 20022 conversion FAQ ↗ — Swift · MT 200, 202, 202 COV, 205 and 205 COV in contingency processing; MT 201 and MT 203 refused at once

    The operator's own account of what happens to MT payment traffic after the coexistence period ended. That period, for cross-border institution-to-institution payment instructions, ended on 22 November 2025.

    The page separates two groups of message. MT 102, MT 102 STP, MT 103 REMIT, MT 201 and MT 203, sent institution to institution, are removed from the network, negatively acknowledged at once and never delivered. MT 103, MT 103 STP, MT 200, MT 202, MT 202 COV, MT 205 and MT 205 COV are instead put through contingency processing, which validates them and converts them so the receiver gets ISO 20022.

    It also separates four things that are easy to confuse: contingency processing for senders, the in-flow translation service on FINplus, the locally deployable Swift Translator, and Transaction Manager.

    Both contingency processing and in-flow translation are chargeable from 1 January 2026, on converted volume, and are outside the fixed fee.

    The operator states these are short-term measures rather than an alternative to adopting the standard, and promised a roadmap during the second quarter of 2026. · Checked 2026-08-23

    Read on the access date through the Internet Archive's copy of the publisher's own URL, snapshot of 15 February 2026, at HTTP 200 and 25,816 bytes. That is stated because it matters: swift.com itself still could not be reached outright, returning HTTP 000 with no response at all, so the archive is the only route and the text is as it stood in February.

    The previous note said a full-page fetch was unavailable. That half is still true of the live site and is now recorded with the evidence.

    Every claim the entry already made survives the archived text, including the list of negatively acknowledged message types, which matches word for word. The set that is converted rather than rejected is added, because the entry named only the rejected half and a reader could reasonably have inferred the rest were unaffected.

    One label is dropped. The entry called this the end of CBPR+ coexistence; the page never uses that term, and describes the scope as cross-border institution-to-institution payment instructions. The page's own words are used above.

  4. Scheme-specific rule

    Cover Payments Market Practice Guidelines — version 4.0, February 2024 ↗ — Swift / Payments Market Practice Group · Sequence B unchanged along the chain (search excerpt of version 4.0, page not opened); Swift's MT 202 COV market practice guidelines read MT 202 COV as MT 202 COV and/or MT 205 (search excerpt, page not opened)

    Cover-payment guidance for the MT (message type) era. Cited for the rule that sequence B of an MT202 COV is a copy of selected fields of the underlying MT103 (customer payment) and should remain unchanged as the message passes along the chain. It is cited too for the intermediary duty to pass on sequence B unaltered. For the stated purpose of transparency and screening, including checks under FATF (Financial Action Task Force) Recommendation 16. Swift's separate MT 202 COV guidance document says wording about the MT 202 COV should be read as covering the MT 205 COV (domestic cover transfer) too, which is the basis for the read-across. · Checked 2026-10-11

    Known from a web-search excerpt only; the PDF was not opened. The excerpt names the MT202 COV (cover). The read-across to the MT205 COV rests on Swift's statement that MT (message type) 202 COV guidance is read as MT 202 COV and/or MT 205 COV. Version 4.1.1 of April 2026 is registered separately as pmpg-cover-payments-2026. Label scheme-specific-rule at most. A newer edition, version 4.1.1 of April 2026, is registered as pmpg-cover-payments-2026; the sequence B wording was seen only in the 4.0 excerpt.

  5. Market practice

    Wolfsberg Group Payment Transparency Standards ↗ — The Wolfsberg Group

    Industry standards on preserving complete and accurate party information through payment chains, expressed in ISO 20022 terminology. · Checked 2026-07-12

    The 2023 standards replace the 2017 version and are supplemented by separate Wolfsberg guidance on roles and responsibilities in payment chains.

  6. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

    CBPR+ roadmap beyond November 2025 ↗ — Swift · Message-specific roadmap beyond the end of coexistence

    Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

    Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

    Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

    Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

    The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

    Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

    The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  7. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: Fictional banks and one domestic hop; real chains can have more hops. The inventory describes the public November 2023 FIN release, not all rules in the current contingency profile.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.