Your bank account is a record kept by the bank that holds it. To know where it stands in the middle of the day, you have to ask that bank, or wait for it to tell you.

Banks do this with three small messages: the , the and the MT920 (request for a report). MT stands for message type. It is the older message format of the bank messaging network (Swift), the network banks use to message each other.

An MT941 is a balance report. It gives one thing: how much is in the account at a stated moment. It lists no individual entries.

An MT942 is an interim report. Interim means in between. It lists the entries that went through the account since the last report, so a treasurer can see what moved before the day ends.

An is the request. Normally the bank sends reports on a timetable that both sides agreed. The MT920 says: send me one now. It moves no money. It is only a question, and the answer is another message.

Why three messages? Because the question changes. "What can we spend this afternoon?" needs a balance. "Which payments have arrived?" needs a list. "I cannot wait for the timetable" needs a request.

A late or missing report is a gap in what you can see. It does not prove a missing payment or an unchanged balance. Check the actual account record separately.

Keep one habit from this page. When a report and your own records disagree, check the report's account and time before you doubt the money.

PICTURE IT

The front desk of a shared office building

Picture a shared office building with a front desk. You rent a room there. The building keeps one book of who is inside, and only the desk holds it. You cannot see the book from your own room.

The desk can do three things for you. It can tell you the head count at one moment: a single number, with no names. It can read out the sign-in lines written since its last look, leaving out the very small visitors you said you did not care about. And you can phone the desk and ask for either of these now, instead of waiting for its usual round.

Whatever the desk says comes from its own book. Asking changes nothing about who is inside.

THE REAL JOB These three messages show what an account at another bank holds: the balance report (MT941), the interim report (MT942) and the request (MT920).

  1. Owner needs to see its position
  2. MT920 asks for a report now
  3. Servicer picks MT941 or MT942
  4. Report is cut at a stated time
  5. Report quotes the request's reference
  6. Owner matches it to its own records
From a question about the account to a report that answers it.

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The building's book of who is insideThe account servicer's own books, where the account lives
The head count at one moment, with no namesMT941 balance report: a balance and no entries
The sign-in lines written since the last lookMT942 interim report: the entries since the last report
The time the desk writes beside the head countThe date and time in field :13D:
Small visitors you asked not to hear aboutEntries under the floor limit in field :34F:
The desk's usual roundThe reporting timetable the two sides agreed
Phoning the desk to ask for one nowMT920 request message
The desk quoting your call number backThe answer quoting the request's reference in field :21:

WHERE THIS PICTURE STOPS

  • In the picture the head count is exact. A balance report (MT941) is true only for the moment in field :13D:. That field is optional, so a report can arrive without saying when it was taken.
  • Asking the desk costs nothing and always gets an answer. A request can name a report the servicer does not produce for that account. Then nothing useful comes back, and no refusal says why.
  • A visitor the desk skipped is simply missing from the sheet. On a real account, an entry under the floor limit still happened and is on the final statement. A short list is not a short account.
  • Which reports a bank sends, for which accounts and at which times, is agreed between the two sides. The picture cannot show that agreement.

HOOK

MT941 the number, MT942 the list, MT920 the ask.

REMEMBER IT THIS WAY

A rule of thumb: if you see this, think that.

If a report carries a in :34F:, read it as a filtered list. A missing small entry is then a question for the final statement first.

What each part of the trick stands for
In the trickWhat it stands for
A floor limit in :34F:entries under that amount are left out on request
A missing small entryfirst check whether it falls under the floor limit
The final statement (MT940)the closed record where the whole day can be checked

A floor limit only explains entries under the threshold, so a missing entry above it is still a question for the servicer.

TELL A FRIEND

A balance report (MT941) gives the balance at one moment. An interim report (MT942) lists the entries so far today; A request (MT920) asks for either one now; none of them moves money.

OFTEN MIXED UP WITH MT9xx: confirmations and statements. The neighbour covers the one-item confirmation and the end-of-period statement (MT940). This topic covers the reports in between and the request for them. They are the number (MT941), the list so far (MT942) and the ask (MT920).

CURRENT AS CHECKED

4 FIGURES
  • Swift CBPR+ FI-to-FI payment instructions

    Swift coexistence for in-scope -to-FI payment instructions ended on 22 November 2025; that deadline did not retire every MT reporting, initiation, investigation or correspondence message.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 2 sources
    1. Official requirement

      ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence — 22 November 2025

      Describes current CBPR+ adoption, the 22 November 2025 end of coexistence for in-scope FI-to-FI payment instructions, later migration work and the structured-address milestone. That milestone was previously due in November 2026 and has since been deferred (see swift-sr2026-controlled-extension-2026). · Checked 2026-07-18

      Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.

    2. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Message-specific roadmap beyond November 2025

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  • Swift post-November-2025 contingency processing

    After coexistence, treatment differs by : some instructions are NAKed and selected messages can enter temporary , chargeable since 1 January 2026. This is not continued normal MT-MX coexistence.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 1 source
    1. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Post-coexistence NAK and contingency-conversion treatment

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  • Swift FIN interbank MT101 relay

    Swift's roadmap was due to discontinue the interbank (request for transfer) relay over (Swift's messaging network) by 14 November 2026. A CBPR+ (Cross-Border Payments and Reporting Plus) pain.001 relay was to replace it.

    On 27 August 2026 Swift deferred that migration, alongside the rest of that year's payments changes, with no replacement date set. Swift has said an update is to follow; a bank page gives December 2026. Once coexistence ends, a single MT101 goes through chargeable and a multiple MT101 is NAKed.

    The company-to-bank MT101 is a separate question. Corporates on (Swift's service for corporates) or a were never in that FIN deadline.

    CHECKED 2026-08-27RECHECK BY 2027-01-05

    Sources & standards — 2 sources
    1. Official requirement

      Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Deferral of SR2026 payments changes, including the interbank MT101 relay retirement, and the promised update by December 2026

      Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

      Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

      Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

    2. Official requirement

      Swift Standards MT (annual standards releases) ↗ — Swift · The original requirement now under deferral: interbank MT101 relay retirement date

      Defines the MT message standards (including MT101, MT103, MT202/202 COV, and the MT9xx statement messages) exchanged over the Swift FIN network, maintained through annual standards releases. · Checked 2026-11-12

      Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.

      Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.

      Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.

  • Swift CBPR+ (Cross-Border Payments and Reporting Plus) reporting messages: MT940, MT941, MT942, MT950 and the MT920 request

    Swift's (Cross-Border Payments and Reporting Plus) roadmap treats (message type) reporting messages on a separate timeline from payment instructions. Search excerpts say receiving camt statements is expected from November 2027. Banks are strongly encouraged to be able to send camt messages by then.

    The end of coexistence for statements and reporting messages is planned for November 2028. Swift adds that its ability to enforce the end of coexistence will depend on community adoption.

    One bank, J.P. Morgan, gives November 2028 for the same milestone in its own FAQ, citing current Swift communication. Read that as one bank repeating the roadmap, not as a second source.

    CHECKED 2026-10-11RECHECK BY 2027-04-11

    Sources & standards — 1 source
    1. Scheme-specific ruleJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Reporting messages: the November 2027 and November 2028 milestones and the note that enforcement depends on community adoption. Seen in web-search excerpts of swift.com roadmap files on the access date; the page was not opened. No scheduled event anchors the review date, so it is a plain six-month check.

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

SEE THE PAYMENT MOVE

PICTURE THE JOURNEY

A frame shop, a glass factory and a ledger hall with one card per officeOpen to read the picture, how it matches the payment and where it stops.

PICTURE IT

A frame shop, a glass factory and a ledger hall with one card per office

Picture a frame-shop owner who must pay a glass factory in another country for a load of glass. She keeps her money at her local cashier office. The glass factory keeps its money at a different cashier office abroad. The two offices have no direct dealings. Each keeps a balance card at a ledger hall, and a relay office carries notes between them.

She signs an order slip and hands it to her cashier office. The slip is only a request. The cashier checks that she may order and that her money is there. It also checks the and that no name is on a banned list. If the slip cannot be carried out, she hears in whatever way she and the office agreed. Otherwise the office takes the amount from her account and gives her a small slip that says one amount has left.

The office then writes the payment letter and hands it to the relay office. The relay office checks that the letter follows the printed form, keeps it safe until the next stop is ready and passes it on. It never touches a balance card. The ledger hall reads the letter and checks the names again for itself. Then it lowers her office's card and raises the glass factory's office's card. That entry is the moment the amount changes hands. The hall sends the glass factory's office a credit slip, and the payment letter follows through the relay office.

The glass factory's office checks the letter, matches it to the credit slip and adds the amount to the glass factory's account. Through the day the frame-shop owner receives a balance sheet and a list of entries, and at close a day statement. The ledger hall also sends each cashier office a copy of its own card, and the office compares that copy with its own book.

Several other turns are possible. If the ledger hall keeps a small handling fee, less glass money arrives. If the hall refuses the letter before it makes any entry, her office puts the amount back in her account. If the glass factory's office finds the account closed, it sends the amount back as a new payment the other way. If an office needs more detail, it posts a query note and waits for the reply. If the two copies of a card disagree, a clerk checks whether an entry is merely late or truly missing. If she asks for the amount back after the glass factory is paid, that is only a request, and the glass factory's office can refuse. (SYNTHETIC / TRAINING ONLY: the frame-shop owner and the glass factory are invented.)

THE REAL JOB A company pays a supplier abroad through its bank in the older Swift message format, with confirmations, reports, queries and returns.

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The frame-shop owner signs an order slip for her cashier officeAsha Traders asks Bank Alfa to pay with the request message MT101Who: Asha Traders
The cashier checks her right to order, her money, the cut-off and the namesBank Alfa validates the authority, funds, cut-off, routing and screeningWho: Bank Alfa
The office takes the amount and gives her a small slipBank Alfa debits Asha Traders; where agreed, MT900 confirms that one debitWho: Bank Alfa
The relay office checks the printed form, keeps the letter safe, passes it onSwift FIN, the message network, checks the format and forwards messages; it holds no account
The payment letter that her office posts to the ledger hallThe customer payment message MT103 is the instruction, not the money
The ledger hall reads the letter and checks the names for itselfMeridian Bank validates and screens the payment for itselfWho: Meridian Bank
The hall lowers one office's card and raises the other'sBook transfer: Meridian Bank debits Bank Alfa's account and credits Nordbank's accountWho: Meridian Bank
A credit slip goes to the glass factory's officeMT910 tells Nordbank that its account at Meridian Bank was credited
The glass factory's office matches the letter to the slip, then creditsNordbank validates, screens and matches the payment before it pays its customerWho: Nordbank
The glass factory's account goes upNorthstar Components, the supplier, is credited by NordbankWho: Northstar Components
A balance sheet and a list of entries by day, a statement at closeMT941 gives balances, MT942 lists daytime entries and MT940 is the day statement
The owner ticks each statement line against her own order slipAsha Traders matches the MT940 entry to its own request, MT101
The hall sends each office a copy of its own cardMT950 reports the entries on Bank Alfa's account at Meridian BankWho: Meridian Bank
A clerk lays two cards side by side and finds an entry on only oneMaya Chen compares Bank Alfa's books with the MT950; a lone entry is a breakWho: Maya Chen
An entry written today on one card and tomorrow on the otherA timing difference clears itself; an unmatched entry gets a query, MT199
The cashier cannot carry out the slip and tells her in the agreed wayA rejected request: no MT103 is sent and funds stay with Asha Traders
The hall keeps a small handling fee as the letter passesShared charges: Meridian Bank takes off a fee, so the supplier receives lessWho: Meridian Bank
The hall refuses the letter before it makes any entryREJT: no value is booked, so Bank Alfa restores the customer balance
The glass factory's office finds the account closed and sends the amount backRETN: Nordbank returns settled funds as a second payment the other wayWho: Nordbank
An office posts a query note, and the reply comes backMT195 asks, MT196 answers; MT199 is the free-text version
The owner asks her office to get the paid amount backBank Alfa sends MT192, a cancellation request; it asks and reverses nothingWho: Bank Alfa
The glass factory's office agrees to hand it back, or refusesMT196 answers: CNCL accepted, with a return to follow, or RJCR refused

WHERE THIS PICTURE STOPS

  • In the picture the owner could ask her office to get the amount back. In the journey that is a cancellation request, MT192. It only asks. The beneficiary's bank can refuse it, and the first settlement stands.
  • The slips and sheets in the picture look like proof that the glass factory was paid. They are not. MT900 confirms one debit, and MT940 lists entries on Asha Traders' own account. Only the credit at Nordbank shows the supplier was paid.
  • The ledger hall in the picture is one keeper with a card for each office. This journey settles on one correspondent's books. Other routes use more banks or a shared payment system, and the picture cannot show which.
  • The picture does not say how current this route is. This journey is the older Swift message format, and a new build does the same job in ISO 20022.
  • The handling fee in the picture is small and illustrative. In the journey the charge option, such as SHA for shared, decides who bears each bank's fee. The message trail is the only record of what was taken.
  • The cashier in the picture tells the owner of a failed slip in an agreed way. A real corporate service is agreed bank by bank, so how a failure reaches the customer varies. Swift's rules have the bank send a rejection advice, normally an MT195 (a query), though an MT199 (a free-format message) is allowed. The ISO 20022 journey uses the structured pain.002 status report.

HOOK

Messages ask, report and query. One ledger entry settles.

REMEMBER IT THIS WAY

A chunk: a long list grouped so it is easier to hold.

Group the account reports by what they hold: MT941 balances, MT942 daytime entries and MT940 the day statement.

What each part of the trick stands for
In the trickWhat it stands for
MT941gives balances
MT942lists daytime entries
MT940is the day statement

TELL A FRIEND

In the older Swift message format, one payment brings a request, the payment message, confirmations, reports and queries. The between banks is what settles it.

OFTEN MIXED UP WITH What the network says back (ACK, NAK). That topic teaches the network's accepted-or-refused answer to one message. This journey shows the bank answers, such as debit, credit, reject, return and statement, which arrive as other messages.

MESSAGES INVOLVED

PRACTISE AND KEEP

IMPLEMENTATION RESOURCES

35 RESOURCES

EVIDENCE AT ARM'S REACH

Apply the base message definition first, then the scheme or infrastructure profile that governs this topic.

An XSD checks XML structure. A usage guideline adds profile rules, conditional fields, code restrictions, and business controls. XSD-valid does not mean scheme-compliant.

XSD + definitionBase ISO 20022

ISO 20022 message definitions and XSDs

OPEN OFFICIAL SOURCE
Usage guidelineCBPR+

CBPR+ usage guidelines

OPEN OFFICIAL SOURCE
Usage guidelineCBPR+

PMPG correspondent-payment and reporting market practice

OPEN OFFICIAL SOURCE
Usage guidelineT2

T2 functional specifications, validation rules, and binding XSDs

OPEN OFFICIAL SOURCE
Teaching sampleIllustrative; no scheme profile checked

camt.060 account reporting request — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.052 intraday account report — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT940 customer statement — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT941 balance report — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT942 interim transaction report — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT920 request message — raw FIN

PRO PASS
Lifecycle packIllustrative; no scheme profile checked

Corporate MX positive lifecycle — ZIP pack

PRO PASS
Lifecycle packIllustrative; no scheme profile checked

MT legacy and migration lifecycle — ZIP pack

PRO PASS
MappingCBPR+

MT941 → camt.052 implementation mapping

PRO PASS
MappingCBPR+

MT942 → camt.052 implementation mapping

PRO PASS
MappingCBPR+

MT940 → camt.053 implementation mapping

PRO PASS
MappingCBPR+

MT920 → camt.060 implementation mapping

PRO PASS
Field matrixSwift MT

MT940 field matrix

PRO PASS
Field matrixSwift MT

MT941 field matrix

PRO PASS
Field matrixSwift MT

MT942 field matrix

PRO PASS
Field matrixSwift MT

MT920 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.052 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.060 field matrix

PRO PASS
Test packIllustrative; no scheme profile checked

Payment lifecycle test cases

PRO PASS
Field matrixT2

T2 RTGS implementation pack field and process matrix

PRO PASS
Test packT2

T2 RTGS implementation pack test cases

PRO PASS
BA checklistT2

T2 RTGS implementation pack BA checklist

PRO PASS
Acceptance criteriaT2

T2 RTGS implementation pack acceptance criteria

PRO PASS
Migration notesT2

T2 RTGS implementation pack migration notes

PRO PASS
Coverage gapsT2

T2 RTGS implementation pack restricted and release-specific gaps

PRO PASS
Profile packCBPR+

CBPR+ implementation pack

PRO PASS
Profile packSEPA SCT

SEPA credit-transfer implementation pack

PRO PASS
Profile packSEPA SDD Core

SEPA direct-debit implementation pack

PRO PASS
Profile packHVPS+

High-value payments implementation pack

PRO PASS
Profile packT2

T2 RTGS implementation pack

PRO PASS
Sources for this topic — 9 sources
  1. Scheme-specific rule

    Swift Standards MT (annual standards releases) ↗ — Swift · Category 9 — MT920 purpose, field 12 values and field 34F rules, seen in search excerpts of the Category 9 Message Reference Guide, page not opened. The MT941 and MT942 field lists were not found in Swift text.; archival/message-record evidence, current authenticated handbook not opened.

    Defines the MT message standards (including MT101, MT103, MT202/202 COV, and the MT9xx statement messages) exchanged over the Swift FIN network, maintained through annual standards releases. · Checked 2026-11-12

    Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.

    Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.

    Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.

  2. Market practice

    prowide/prowide-core — a reader, writer and validator for SWIFT MT messages ↗ — Prowide (open source, Apache 2.0) · MT941.java, MT942.java and MT920.java at SRU 2025 for the field lists and their order

    An open implementation of the SWIFT MT message set. Its generated classes carry, per message type, the ordered field list with each field's letter options and whether it is mandatory or optional, stamped with the standards release it was generated from. A companion labels file carries the business name of each field, including the per-message overrides that give a tag its meaning in context, and the generated field classes carry the validation pattern.

    Used here for the Category 7 documentary-credit messages and the Category 4 collections messages, where it is the readable statement of a structure whose own handbook sits behind a swift.com login. And as the corroborating read behind every other Message Type record on this site — the customer, institution and cash-management categories — where each citation names the generated class and the release it was read from.

    Also cited, on 2026-10-17, for the Swift header blocks 1 to 3, the block 5 trailers and the X, Y and Z character sets. It is also cited for the names of the common group messages n90 to n99 in categories 1, 2 and 9, and for the names of message types 105 and 935. · Checked 2026-10-17

    An implementation, not the standard. Swift's own standards releases are the authority and where the handbook and a library disagree, the handbook wins — the same relationship this registry already records for the Nacha, Fedwire and Australian batch-file implementations.

    What it does not carry, and what is therefore not published from it: code values — what may legitimately appear in a form-of-credit, confirmation-instruction, partial-shipment or purpose field — and the network-validated rules that bind one field to another. Those live in the handbook, and their absence is the boundary that the login still enforces.

    Cross-checked rather than taken alone: an independent bank-published standards-release guide states the same field count and the same count of mandatory fields for the issue-of-a-documentary-credit message, and names the same two fields as that release's additions.

    Read again on 2026-10-17 by direct fetch of the raw source files: the header block classes, the trailer field list, the character set helper, the generated field classes 103 to 121 and the generated message classes. Block 1 gives application identifiers F, A and L, service identifiers 01 and 21, a four-character session number and a six-character sequence number. Input block 2 gives priority S, U or N, delivery monitoring 1, 2 or 3, and time limit 003 for urgent and 020 for normal.

    Field 103 is named the FINCopy service code. The X, Y and Z lists are the implementation's reading of the User Handbook. These are comments in an implementation, not Swift's handbook. The library notes that, per Swift documentation, the time limit a sender types is ignored by the system. Where the handbook and the library differ, the handbook wins.

    On 2026-10-25 the field classes Field22D, Field23S and Field44J were opened and read at raw.githubusercontent.com. So were the message classes MT300 (the foreign exchange confirmation), MT707 (the documentary credit amendment) and MT760 (the guarantee message). They gave these validation patterns: 22D 4!c, 23S 6!a, and for 44J a country code with optional subdivision of 35 and narrative of 65. They also gave the sequence structure of the MT300 (A to F with B1, B2, D1, E1, E1a, E1a1) and of the MT760 (A, B, C). They carry no code lists.

  3. Market practice

    Exporting Account Statements — SWIFT MT942 Format User Guide ↗ — Bank Handlowy w Warszawie S.A. (Citi Handlowy) · MT942 record structure and the two floor limit occurrences, sections 4.5 and 4.6

    A bank's own description of the MT942 interim transaction report it exports, dated 13 November 2021. Its record-structure table gives every tag a status: field 20 required, field 21 optional, field 25 required, field 28C required, a required first field 34F and an optional second. Field 61 and field 86 are optional and repeating, and fields 90D and 90C are optional.

    Used here to confirm the presence of the four fields the MT942 reference was missing. And for what the second floor limit is for — where a report carries both credits and debits the first occurrence carries the debit threshold and the second the credit one. And where it carries only one direction a single occurrence is sent with no debit-or-credit mark at all.

    Also cited on the MT942 mapping table for two things a base definition cannot tell you: what one real bank puts in field 21, and that a statement line can mark an entry as expected rather than booked. · Checked 2026-08-23

    Downloaded and read in full on the access date: HTTP 200, 1,161,831 bytes, 66 pages, converted with pdftotext -layout. A per-tag data map with a worked example for every field, so it is used to confirm what a real MT942 contains rather than to assert what the standard requires.

    Two of its statements are about this bank rather than about MT942, and the mapping table says so where it uses them. Its field 21 carries the moment Citi's book-keeping system generated the report, written as a fourteen-digit timestamp, where the standard describes the field as quoting the reference of a requesting MT920. So a translator that files field 21 as the original business query on this output records a timestamp as the identity of a request nobody made. And its tag 13 is written without the D option letter that the standard and every other guide read here give as field 13D.

    Its statement-line table lists a credit/debit identifier value for an expected credit or debit alongside the plain debit and credit. That is corroborated independently, and it is the difference that makes the mandatory entry status in a camt.052 a decision rather than a constant.

  4. Official requirement

    ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence for in-scope payment instructions; the deadline did not retire every MT message

    Describes current CBPR+ adoption, the 22 November 2025 end of coexistence for in-scope FI-to-FI payment instructions, later migration work and the structured-address milestone. That milestone was previously due in November 2026 and has since been deferred (see swift-sr2026-controlled-extension-2026). · Checked 2026-07-18

    Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.

  5. Scheme-specific ruleJune 2026 edition read in full; September 2026 edition seen as search excerpts only

    CBPR+ roadmap beyond November 2025 ↗ — Swift · Reporting messages: camt send-ability encouraged for November 2027, end of coexistence for statements and reporting messages planned for November 2028, enforcement dependent on community adoption, and the MT-to-camt pairings (search excerpts of swift.com roadmap files, page not opened)

    Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

    Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

    Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

    Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

    The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

    Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

    The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  6. Market practice

    Migration to ISO 20022 — useful information, hints and tips ↗ — J.P. Morgan · High-level MT-to-MX table placing MT920 against camt.060, MT941 and MT942 against camt.052

    A correspondent bank's public MT-to-MX guide, in three parts: a party-and-agent glossary giving each ISO role its FIN field equivalent, a data-elements table per message pair. And five side-by-side worked translations of a FIN message into the ISO document it becomes.

    Cited on the MT210 to camt.057 table, which is one of those five and the only public field-level statement of that translation this site has found. The example settles where each MT210 field lands. The notice reference on the group header's message identification, the account line under the account's other-identification branch, and the related reference as the item's identification. The currency and amount as the item's amount, the value date as the item's expected value date, and the ordering customer and intermediary at notification level.

    It also shows the two facts the MT carries only in its envelope — the FIN Sender becoming the account owner's agent, the FIN Receiver the account servicer. And the one mandatory element the MT cannot supply, the notification identification, which the translation generates.

    Its party table is cited on the MT204 to pacs.010 table for role equivalences that hold across the pacs family. Field 20 as the instruction identification, field 21 as the end-to-end identification, field 58 as the creditor and field 57 as the creditor agent. · Checked 2026-08-23

    Downloaded and read in full from the publisher's own domain on the access date: HTTP 200, 3,860,743 bytes, converted with pdftotext -layout, so nothing cited from it rests on a search excerpt. The document dates itself "Updated in March 2025".

    It says of itself that it is not an exhaustive mapping but a high-level guide, and that the relevant schema should be referred to for detail. That is exactly how it is used here: it is cited for where a value lands and for what a role is called, never for whether an element is mandatory. Every element address and every presence flag on the tables it supports is read from the published XSD instead.

    Its camt.057 example is written against camt.057.001.06, the version CBPR+ deployed in March 2023. This site states presence against camt.057.001.09, the newest version a public mirror serves. And the difference is not cosmetic in one place: the account identification element is mandatory in the CashAccount type used by the earlier version and optional in the later one, where an account may be identified by a proxy instead. Read the example for placement and the schema for presence.

    One value in the example is the translation's own invention rather than a mapping: the notification identification is populated with a reference that appears nowhere in the MT210 beside it. That is the point of the row it supports, not a defect in the guide.

  7. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: Fictional Asha Traders, Bank Alfa, Meridian Bank and Maya Chen throughout. Reporting agreements, floor limits and delivery times are bilateral and vary by bank, so one timetable is shown as an example, not as a rule.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

  8. Scheme-specific rule

    Swift Category 9 Message Reference Guide, SR2019, version 2.0 ↗ — Swift · Official Knowledge Centre search excerpts, page not opened: Category 9 SR2019; MT900 21 causative transaction p15; MT920 latest information and 942 floor rule p35; MT940 page balances p55; MT950 format p90 without 21/65/86.

    Official search excerpts: MT900 related reference p15; MT920 latest information and 942 floor condition p35; MT940 page balances p55; MT950 format p90. Archival edition, not a current all-release implementation specification. · Checked 2026-11-06

    Search excerpt, page not opened. The cited publisher/version was identified through normal web search; handbook access restrictions are preserved. Do not infer unshown fields or newer-release rules.

  9. Market practiceVersion2, December2024

    Interbank Statement Creation Market Practice Paper (December 2024) ↗ — Swift / Payments Market Practice Group · Opened December2024 version2 PDF: section13.1 printedp39 MT940fields65/86 versusMT950; section13.2p40 pagination; section13.3p40 shared entry information and agreed detail coverage. PMPG market practice, not current FIN validation specification.

    Interbank statement market practice: printedp39section13.1 MT940fields65/86 absent fromMT950; p40sections13.2–13.3 pagination and shared entry information across reports, subject to actual agreement. · Checked 2026-11-06

    Opened public53page PDF; inspected printedp7/PDF8 Diagram1. Actual disclaimer printedp1 permits reproduction, redistribution and transmission with source acknowledgement. This is PMPG market practice, not an authenticated current FIN validation specification.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.