MT195 and MT295: queries
The MT195 (query) and MT295 are the older Swift way to ask a bank about an earlier message — a question, not a payment, with its own timetable.
L1–L4 are part of the Pro pass
L0 Explain simply
Sometimes a bank sends a payment message and then needs to ask a question about it. Where is it? Which payment is this line about? Can you tell me more? A query message is the formal way to ask. Think of a numbered slip pinned to a copy of the earlier message, with one question written on it.
The older Swift message family has two of these. Swift is the network banks use to send each other messages. The MT195 asks about an earlier message in the customer payments group. The MT295 asks about an earlier message in the group where banks move money between themselves. The first digit names the group. The last two digits, 95, mean it is a query.
Here is a small story. Asha Traders paid its supplier, Northstar Components, through Bank Alfa. The payment passed through Meridian Bank and ended at Nordbank. Northstar Components says nothing has arrived. Maya Chen, a payments operations analyst at Bank Alfa, does not guess. She asks. (SYNTHETIC / TRAINING ONLY — every person and firm named here is fictional.)
Bank Alfa sends an MT195 to Meridian Bank. It quotes the reference of the payment message and asks where the payment is. That is all it does. It does not move money, stop the payment or prove anything. It only asks. The other bank is expected to answer, usually with a separate message.
The answer comes back as a separate message. For an MT195 the usual answer is an MT196. For an MT295 it is an MT296. Until it arrives, the question is open. A slow answer is often the other bank taking time to look, not a sign that something broke.
One more thing to know early. These are older-format messages. Cross-border bank payments now use messages, and investigations are moving to newer messages: the camt.110 investigation request and the camt.111 investigation response. So read this topic as the way queries worked in the older family. It is not the default for new work, and the last level says what is known about the dates.
PICTURE IT
A question slip pinned to a copy of an earlier form
Picture two offices that pass forms to each other. One office filled in a form and sent it. Later it has a question about that form. It does not send a new form. It writes the question on a numbered slip. It pins the slip to a copy of the form, or to a note that says which form it means.
The other office finds the form, reads the slip and writes an answer on a second slip. The slip changes nothing about the form. It only asks, and the answer is a separate piece of paper that comes back when the other office is ready.
THE REAL JOB A query message lets one bank ask another a structured question about an earlier message, so it can be matched and answered.
- The earlier message goes out, such as an
MT103 - Something is unclear or late
- The query goes out:
:20:is new,:21:points back,:75:asks - The receiver finds the earlier message and looks into it
- The answer message, an
MT196orMT296, comes back
HOW THE PICTURE MAPS
| In the picture | In the payment |
|---|---|
| The numbered slip pinned to the form | A query message: MT195 for customer payments, MT295 for bank-to-bank transfersWho: Bank Alfa |
| The number on the slip, new for each question | Field :20:, the query's own reference |
| The note saying which form the question is about | Field :21:, the reference of the earlier message |
| The question written on the slip | Field :75:, the coded question |
| Either a pinned copy or a written description, never both | Describe in :79: or copy the original's mandatory fields; rule C1 allows one |
| The second slip that comes back | The answer, an MT196 or an MT296, quoting the query's referenceWho: Meridian Bank |
WHERE THIS PICTURE STOPS
- A person reading a pinned copy would notice a wrong digit. The network does not. It checks a copied field for format only. It never compares the copy with the real original, so a copy with one wrong digit passes and still cannot be matched.
- A slip has no clock. A query can go unanswered, and the query has no field that says still working on it. A query being looked into and one being ignored look the same from outside.
- The picture has one kind of slip. The real family has more. The
MT192andMT292are cancellation requests. TheMT199is a free-text message, and so is theMT299. The describe-or-copy rule for queries is the opposite of the cancellation rule. - Paper slips stay in use as long as an office likes. These messages follow Swift's own timetable, which has dates and has been revised before. The dated facts on the topic page hold the dates, and Swift's current timeline decides.
HOOK
A query asks. It never moves money or stops anything.
REMEMBER IT THIS WAY
A contrast: two neighbours told apart by one test.
Query: describe it or copy it, never both. Cancellation request: both are allowed.
| In the trick | What it stands for |
|---|---|
| Describe it | a description of the earlier message in words |
| Copy it | a copy of the original's mandatory fields |
| Never both | rule C1 for the query messages |
| Both are allowed | the rule for the MT192 and MT292 |
The rule is read from a handbook edition and one copy of it, so check the current handbook before building.
TELL A FRIEND
A query message, the MT195, or the MT295 for bank-to-bank transfers, is how one bank asks another about a message it sent earlier. It only asks, and the answer comes back separately.
OFTEN MIXED UP WITH When a payment needs investigating. The newer pair replaces these queries: the camt.110 investigation request and the camt.111 investigation response. They carry a coded and a coded reason, while the older pair carries codewords inside text. Check which family a route uses before you assume an answer a system can read.
CURRENT AS CHECKED
5 FIGURES
Swift CBPR+ FI-to-FI payment instructions
Swift coexistence for in-scope -to-FI payment instructions ended on 22 November 2025; that deadline did not retire every MT reporting, initiation, investigation or correspondence message.
CHECKED 2026-10-11RECHECK BY 2027-01-05
Sources & standards — 2 sources
- Official requirement
ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence — 22 November 2025
Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.
- Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only
CBPR+ roadmap beyond November 2025 ↗ — Swift · Message-specific roadmap beyond November 2025
Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.
The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.
Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.
The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.
Swift post-November-2025 contingency processing
After coexistence, treatment differs by : some instructions are NAKed and selected messages can enter temporary , chargeable since 1 January 2026. This is not continued normal MT-MX coexistence.
CHECKED 2026-10-11RECHECK BY 2027-01-05
Sources & standards — 1 source
- Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only
CBPR+ roadmap beyond November 2025 ↗ — Swift · Post-coexistence NAK and contingency-conversion treatment
Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.
The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.
Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.
The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.
Swift FIN interbank MT101 relay
Swift's roadmap was due to discontinue the interbank (request for transfer) relay over (Swift's messaging network) by 14 November 2026. A CBPR+ (Cross-Border Payments and Reporting Plus) pain.001 relay was to replace it.
On 27 August 2026 Swift deferred that migration, alongside the rest of that year's payments changes, with no replacement date set. Swift has said an update is to follow; a bank page gives December 2026. Once coexistence ends, a single MT101 goes through chargeable and a multiple MT101 is NAKed.
The company-to-bank MT101 is a separate question. Corporates on (Swift's service for corporates) or a were never in that FIN deadline.
CHECKED 2026-08-27RECHECK BY 2027-01-05
Sources & standards — 2 sources
- Official requirement
Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Deferral of SR2026 payments changes, including the interbank MT101 relay retirement, and the promised update by December 2026
Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.
Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.
- Official requirement
Swift Standards MT (annual standards releases) ↗ — Swift · The original requirement now under deferral: interbank MT101 relay retirement date
Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.
Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.
Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.
Swift Standards Release 2026 payments changes
Swift announced in August 2026 that it was deferring the payments changes planned for November 2026 in 2026, and updated that announcement on 21 September 2026. Swift said it would set a new timeline for the payments changes, including postal addresses, by December 2026 at the latest.
CHECKED 2026-10-10RECHECK BY 2027-01-05
Sources & standards — 1 source
- Official requirement
Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Controlled extension of Standards Release 2026: deferral of the November 2026 payments changes
Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.
Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.
Swift exceptions-and-investigations migration: MT (message type) n95/n96 to camt.110 (investigation request)/camt.111
Swift's exceptions-and-investigations plan names (investigation request) and as the replacements for the formatted MT (message type) n95 queries and MT n96 answers. They are exchanged only through Swift Case Management.
From November 2027, sending and receiving them through is mandatory. The formatted n95 and n96 are removed, and unstructured MT n99 is retired for investigations. In-flow translation ends.
Swift has revised parts of its timeline in 2026. Reports of an earlier step (receiving a camt.110 that carries an (free-format message)) disagreed on its date, so that step is not dated here. Check Swift's current timeline before relying on any date.
CHECKED 2026-10-11RECHECK BY 2027-01-05
Sources & standards — 2 sources
- Scheme-specific rule
ISO 20022: Exceptions and Investigations — frequently asked questions ↗ — Swift · The replacement pairs, the Case Orchestrator requirement, and the removal of formatted MT messages for E&I at the November 2027 milestone (search excerpt, page not opened)
swift.com does not respond — requests to it time out rather than returning a status. So the page was read through the Internet Archive's copy of the publisher's own URL, snapshot 20260822215634, HTTP 200, 163,796 bytes, and the text extracted from that HTML. The words are the publisher's; only the route to them is the archive's.
It is a service FAQ, not a message definition. Its scope is the cross-border payment categories, so it names the Category 1 and Category 2 members — MT 195/198/295/298 and MT 199/299 — and does not mention the Category 9 members at all. The Category 9 pairings are sourced from Swift's CBPR+ coexistence deck instead. It does not mention admi.024.
Every presence flag and element address on the tables it supports is read from the published schema rather than from here.
Undated as a page. Its milestones are dated and will move; recheck the live page before using one in delivery planning.
- Scheme-specific rule
CBPR+ (Cross-Border Payments and Reporting Plus) phase 2 roadmap, detailed (version 4) ↗ — Swift · Exceptions-and-investigations rows: camt.110/111 mandatory and the end of in-flow translation at the later milestone, with the roadmap's caveat about revised timing (search excerpt, page not opened)
Known from web-search excerpts only; the page was not opened. The roadmap carries a caveat that its dates may no longer be accurate because of the revised SR2026 timing, and newer roadmap versions exist (June and September 2026). Check the current Swift timeline before relying on a date. Not an independent confirmation of the Swift FAQ: same publisher.
SEE THE PAYMENT MOVE
PICTURE THE JOURNEY
A frame shop, a glass factory and a ledger hall with one card per officeOpen to read the picture, how it matches the payment and where it stops.
PICTURE IT
A frame shop, a glass factory and a ledger hall with one card per office
Picture a frame-shop owner who must pay a glass factory in another country for a load of glass. She keeps her money at her local cashier office. The glass factory keeps its money at a different cashier office abroad. The two offices have no direct dealings. Each keeps a balance card at a ledger hall, and a relay office carries notes between them.
She signs an order slip and hands it to her cashier office. The slip is only a request. The cashier checks that she may order and that her money is there. It also checks the and that no name is on a banned list. If the slip cannot be carried out, she hears in whatever way she and the office agreed. Otherwise the office takes the amount from her account and gives her a small slip that says one amount has left.
The office then writes the payment letter and hands it to the relay office. The relay office checks that the letter follows the printed form, keeps it safe until the next stop is ready and passes it on. It never touches a balance card. The ledger hall reads the letter and checks the names again for itself. Then it lowers her office's card and raises the glass factory's office's card. That entry is the moment the amount changes hands. The hall sends the glass factory's office a credit slip, and the payment letter follows through the relay office.
The glass factory's office checks the letter, matches it to the credit slip and adds the amount to the glass factory's account. Through the day the frame-shop owner receives a balance sheet and a list of entries, and at close a day statement. The ledger hall also sends each cashier office a copy of its own card, and the office compares that copy with its own book.
Several other turns are possible. If the ledger hall keeps a small handling fee, less glass money arrives. If the hall refuses the letter before it makes any entry, her office puts the amount back in her account. If the glass factory's office finds the account closed, it sends the amount back as a new payment the other way. If an office needs more detail, it posts a query note and waits for the reply. If the two copies of a card disagree, a clerk checks whether an entry is merely late or truly missing. If she asks for the amount back after the glass factory is paid, that is only a request, and the glass factory's office can refuse. (SYNTHETIC / TRAINING ONLY: the frame-shop owner and the glass factory are invented.)
THE REAL JOB A company pays a supplier abroad through its bank in the older Swift message format, with confirmations, reports, queries and returns.
HOW THE PICTURE MAPS
| In the picture | In the payment |
|---|---|
| The frame-shop owner signs an order slip for her cashier office | Asha Traders asks Bank Alfa to pay with the request message MT101Who: Asha Traders |
| The cashier checks her right to order, her money, the cut-off and the names | Bank Alfa validates the authority, funds, cut-off, routing and screeningWho: Bank Alfa |
| The office takes the amount and gives her a small slip | Bank Alfa debits Asha Traders; where agreed, MT900 confirms that one debitWho: Bank Alfa |
| The relay office checks the printed form, keeps the letter safe, passes it on | Swift FIN, the message network, checks the format and forwards messages; it holds no account |
| The payment letter that her office posts to the ledger hall | The customer payment message MT103 is the instruction, not the money |
| The ledger hall reads the letter and checks the names for itself | Meridian Bank validates and screens the payment for itselfWho: Meridian Bank |
| The hall lowers one office's card and raises the other's | Book transfer: Meridian Bank debits Bank Alfa's account and credits Nordbank's accountWho: Meridian Bank |
| A credit slip goes to the glass factory's office | MT910 tells Nordbank that its account at Meridian Bank was credited |
| The glass factory's office matches the letter to the slip, then credits | Nordbank validates, screens and matches the payment before it pays its customerWho: Nordbank |
| The glass factory's account goes up | Northstar Components, the supplier, is credited by NordbankWho: Northstar Components |
| A balance sheet and a list of entries by day, a statement at close | MT941 gives balances, MT942 lists daytime entries and MT940 is the day statement |
| The owner ticks each statement line against her own order slip | Asha Traders matches the MT940 entry to its own request, MT101 |
| The hall sends each office a copy of its own card | MT950 reports the entries on Bank Alfa's account at Meridian BankWho: Meridian Bank |
| A clerk lays two cards side by side and finds an entry on only one | Maya Chen compares Bank Alfa's books with the MT950; a lone entry is a breakWho: Maya Chen |
| An entry written today on one card and tomorrow on the other | A timing difference clears itself; an unmatched entry gets a query, MT199 |
| The cashier cannot carry out the slip and tells her in the agreed way | A rejected request: no MT103 is sent and funds stay with Asha Traders |
| The hall keeps a small handling fee as the letter passes | Shared charges: Meridian Bank takes off a fee, so the supplier receives lessWho: Meridian Bank |
| The hall refuses the letter before it makes any entry | REJT: no value is booked, so Bank Alfa restores the customer balance |
| The glass factory's office finds the account closed and sends the amount back | RETN: Nordbank returns settled funds as a second payment the other wayWho: Nordbank |
| An office posts a query note, and the reply comes back | MT195 asks, MT196 answers; MT199 is the free-text version |
| The owner asks her office to get the paid amount back | Bank Alfa sends MT192, a cancellation request; it asks and reverses nothingWho: Bank Alfa |
| The glass factory's office agrees to hand it back, or refuses | MT196 answers: CNCL accepted, with a return to follow, or RJCR refused |
WHERE THIS PICTURE STOPS
- In the picture the owner could ask her office to get the amount back. In the journey that is a cancellation request,
MT192. It only asks. The beneficiary's bank can refuse it, and the first settlement stands. - The slips and sheets in the picture look like proof that the glass factory was paid. They are not.
MT900confirms one debit, andMT940lists entries on Asha Traders' own account. Only the credit at Nordbank shows the supplier was paid. - The ledger hall in the picture is one keeper with a card for each office. This journey settles on one correspondent's books. Other routes use more banks or a shared payment system, and the picture cannot show which.
- The picture does not say how current this route is. This journey is the older Swift message format, and a new build does the same job in
ISO 20022. - The handling fee in the picture is small and illustrative. In the journey the charge option, such as
SHAfor shared, decides who bears each bank's fee. The message trail is the only record of what was taken. - The cashier in the picture tells the owner of a failed slip in an agreed way. A real corporate service is agreed bank by bank, so how a failure reaches the customer varies. Swift's rules have the bank send a rejection advice, normally an
MT195(a query), though anMT199(a free-format message) is allowed. TheISO 20022journey uses the structuredpain.002status report.
HOOK
Messages ask, report and query. One ledger entry settles.
REMEMBER IT THIS WAY
A chunk: a long list grouped so it is easier to hold.
Group the account reports by what they hold: MT941 balances, MT942 daytime entries and MT940 the day statement.
| In the trick | What it stands for |
|---|---|
MT941 | gives balances |
MT942 | lists daytime entries |
MT940 | is the day statement |
TELL A FRIEND
In the older Swift message format, one payment brings a request, the payment message, confirmations, reports and queries. The between banks is what settles it.
OFTEN MIXED UP WITH What the network says back (ACK, NAK). That topic teaches the network's accepted-or-refused answer to one message. This journey shows the bank answers, such as debit, credit, reject, return and statement, which arrive as other messages.
PRACTISE AND KEEP
IMPLEMENTATION RESOURCES
16 RESOURCES
EVIDENCE AT ARM'S REACH
Apply the base message definition first, then the scheme or infrastructure profile that governs this topic.
An XSD checks XML structure. A usage guideline adds profile rules, conditional fields, code restrictions, and business controls. XSD-valid does not mean scheme-compliant.
MT195 payment query — raw FIN
MT196 substantive answer — raw FIN
MT295 Category 2 query — raw FIN
MT296 Category 2 answer — raw FIN
MT legacy and migration lifecycle — ZIP pack
MT196 → camt.029 implementation mapping
MT296 cancellation answer → camt.029 implementation mapping
MT195 → camt.110 implementation mapping
MT295 → camt.110 implementation mapping
MT196 → camt.111 implementation mapping
MT296 → camt.111 implementation mapping
MT195 field matrix
MT196 field matrix
MT295 field matrix
MT296 field matrix
Sources for this topic — 11 sources
- Scheme-specific rule
Swift Standards MT (annual standards releases) ↗ — Swift · Category n, MT n95 Queries, Standards MT November 2023 message reference guide: the seven-row format, network-validated rule C1 (field 79 or the copy of the original's mandatory fields, not both) and field 79's
/REJT/and/RETN/rule. The Category 2 volume carries no field list for MT 295 and points here. Read from the ISO 15022 User Handbook copy on iso20022.org (search excerpt, re-confirmed 2026-10-11): fields 20, 21 and 75 mandatory; 77A, 11a and 79 optional; untagged copy conditional under C1.Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.
Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.
Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.
- Market practice
prowide/prowide-core — a reader, writer and validator for SWIFT MT messages ↗ — Prowide (open source, Apache 2.0) · MT195.java and MT295.java at SRU 2025: the six tagged body fields 20 (M), 21 (M), 75 (M), 77A (O), 11 as R or S (O), 79 (O); the untagged copy cannot be modelled by a field class
An implementation, not the standard. Swift's own standards releases are the authority and where the handbook and a library disagree, the handbook wins — the same relationship this registry already records for the Nacha, Fedwire and Australian batch-file implementations.
What it does not carry, and what is therefore not published from it: code values — what may legitimately appear in a form-of-credit, confirmation-instruction, partial-shipment or purpose field — and the network-validated rules that bind one field to another. Those live in the handbook, and their absence is the boundary that the login still enforces.
Cross-checked rather than taken alone: an independent bank-published standards-release guide states the same field count and the same count of mandatory fields for the issue-of-a-documentary-credit message, and names the same two fields as that release's additions.
Read again on 2026-10-17 by direct fetch of the raw source files: the header block classes, the trailer field list, the character set helper, the generated field classes 103 to 121 and the generated message classes. Block 1 gives application identifiers F, A and L, service identifiers 01 and 21, a four-character session number and a six-character sequence number. Input block 2 gives priority S, U or N, delivery monitoring 1, 2 or 3, and time limit 003 for urgent and 020 for normal.
Field 103 is named the FINCopy service code. The X, Y and Z lists are the implementation's reading of the User Handbook. These are comments in an implementation, not Swift's handbook. The library notes that, per Swift documentation, the time limit a sender types is ignored by the system. Where the handbook and the library differ, the handbook wins.
On 2026-10-25 the field classes Field22D, Field23S and Field44J were opened and read at raw.githubusercontent.com. So were the message classes MT300 (the foreign exchange confirmation), MT707 (the documentary credit amendment) and MT760 (the guarantee message). They gave these validation patterns: 22D 4!c, 23S 6!a, and for 44J a country code with optional subdivision of 35 and narrative of 65. They also gave the sequence structure of the MT300 (A to F with B1, B2, D1, E1, E1a, E1a1) and of the MT760 (A, B, C). They carry no code lists.
- Scheme-specific rule
ISO 20022: Exceptions and Investigations — frequently asked questions ↗ — Swift · Swift's E&I FAQ: camt.110 replaces the MT n95 queries and camt.111 the MT n96 answers; both only through the Case Orchestrator, not bilaterally (re-confirmed 2026-10-11, search excerpt of Swift pages: migration to camt.110/111 is only possible through Case Management and the messages cannot be exchanged bilaterally); formatted MT messages for E&I removed at the later milestone (November 2027) and unstructured MT n99 retired for E&I use (search excerpt, page not opened this session)
swift.com does not respond — requests to it time out rather than returning a status. So the page was read through the Internet Archive's copy of the publisher's own URL, snapshot 20260822215634, HTTP 200, 163,796 bytes, and the text extracted from that HTML. The words are the publisher's; only the route to them is the archive's.
It is a service FAQ, not a message definition. Its scope is the cross-border payment categories, so it names the Category 1 and Category 2 members — MT 195/198/295/298 and MT 199/299 — and does not mention the Category 9 members at all. The Category 9 pairings are sourced from Swift's CBPR+ coexistence deck instead. It does not mention admi.024.
Every presence flag and element address on the tables it supports is read from the published schema rather than from here.
Undated as a page. Its milestones are dated and will move; recheck the live page before using one in delivery planning.
- Scheme-specific rule
CBPR+ (Cross-Border Payments and Reporting Plus) phase 2 roadmap, detailed (version 4) ↗ — Swift · CBPR+ phase 2 roadmap detailed v4: exceptions-and-investigations milestones; the roadmap carries a caveat that its dates may no longer be accurate because of the revised SR2026 timing (search excerpt, page not opened this session)
Known from web-search excerpts only; the page was not opened. The roadmap carries a caveat that its dates may no longer be accurate because of the revised SR2026 timing, and newer roadmap versions exist (June and September 2026). Check the current Swift timeline before relying on a date. Not an independent confirmation of the Swift FAQ: same publisher.
- Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only
CBPR+ roadmap beyond November 2025 ↗ — Swift · Post-coexistence roadmap: exceptions-and-investigations migration rows and the separation of the payment-instruction deadline from MT investigation and correspondence messages
Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.
The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.
Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.
The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.
- Official requirement
Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Deferral of the SR2026 payments changes, including the interbank MT101 relay retirement and the E&I package, and the promised update
Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.
Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.
- Official requirement
ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence for in-scope FI-to-FI payment instructions
Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.
- Market practice
Cross-Border Payments and Reporting (CBPR+) (Clearstream) ↗ — Clearstream Banking S.A. · One custodian's CBPR+ page: MT messages other than payment instructions remain supported after the coexistence period (search excerpt, page not opened)
Search excerpt, page not opened. One infrastructure's practice, not Swift's rule. An older Clearstream introduction note (clearstream-cbpr-plus-introduction-note) said the MT195 (query), MT196, MT199, MT295, MT296 and MT299 were not yet published for CBPR+ (Cross-Border Payments and Reporting Plus) and stayed on the older format. Treat the later page as current.
- Simplified educational illustration
Payments Signal editorial teaching models — Payments Signal
What this simplifies: One query and one answer are shown from a larger query code set. Field detail follows the handbook edition read and changes with each yearly Standards Release. The story is fictional.
Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.
- Official requirement
ISO 15022 user handbook: query message (n95), field 75, queries ↗ — ISO 20022 Registration Authority · Opened online ISO 15022 UHB 6 November 2026, field75: optional code conventions including 17 amendment, 18 debit authority, 19 refund of cover and 36 unanswered-message follow-up. Page does not state an annual release.
Known only from a web-search excerpt; the page was not opened.
- Official requirement
ISO 15022 user handbook: answer message (n96), field 76, answers ↗ — ISO 20022 Registration Authority · Opened online ISO 15022 UHB 6 November 2026, field76: narrative permitted; code18 enquiry receiving attention; cancellation codes CNCL/PDCR/RJCR. Page does not state an annual release.
Known only from a web-search excerpt; the page was not opened.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.