MT103 variants: STP and REMIT validation flags
Two stamps in the message header decide whether an MT103 is checked as a machine-ready payment or as one that carries a long invoice list.
L1–L4 are part of the Pro pass
L0 Explain simply
A plain is a form that asks one bank to pay one customer through another bank. stands for message type, the older message format on Swift, the network banks use to message each other. This topic is about two special versions of that form. Each carries a stamp, and the stamp tells the network to check the form against a stricter list of rules.
The stamp is called a . It sits in the user header, a small block of extra data at the front of the message. Two stamps matter here. STP marks the version made for , which means the receiving bank can pay with no person touching the message. REMIT marks the version that carries a long list of invoice detail.
SYNTHETIC / TRAINING ONLY. Asha Traders owes its supplier, Northstar Components. Bank Alfa sends the payment to Nordbank, where Northstar Components banks. Bank Alfa adds the STP stamp. Nordbank's computer should then be able to credit the supplier without anyone reading the message first.
With the stamp on, the network checks the form before it delivers it. One check is about how banks are named. A bank named by its Business Identifier Code (), a short standard code, can be identified through . Free-text identification is harder to process reliably. Neither format guarantees that an account exists or that screening and credit will complete automatically. So the stricter form allows the code and refuses the free text in several bank fields.
If Bank Alfa breaks one of those rules, the network answers at once with a refusal, or , which is a refusal notice. The NAK alone does not establish the state of bank accounts. That is the control working as designed, and the usual fix is to correct the form and send it again.
Now suppose Northstar Components wants its full invoice list to travel with the money. The plain form has only a small box for that, called field 70. The REMIT version swaps field 70 for field 77T, an envelope that holds much more. Banks use it only if they have signed up for it first.
Where does this sit today? MT is the older way. For bank-to-bank payment instructions it is now the legacy and contingency lifecycle, because , the newer message standard, took over there. Swift's list removes the bank-to-bank MT103 REMIT from the network, and sends MT103 STP through a temporary conversion service. The dates are in the facts panel on this page. This lesson makes simple. Swift's own manual is behind a login, so some rules here rest on public copies, and the sources say which.
Keep one question ready. If a form carries the STP stamp but names the by name and address, who finds out first, and what do they see?
PICTURE IT
A parcel with a sorting sticker
Picture a parcel in a post office. A plain parcel is read by a person at every stop. A parcel with a machine-sort sticker must follow stricter rules: a printed address in the set format, and nothing written by hand. A machine then moves it with no person. A second sticker marks a parcel with a thick folder of papers inside. It needs a bigger pouch than the plain small envelope.
THE REAL JOB The flag in the message header picks stricter rules, so the straight-through version suits a computer and the remittance version holds a long invoice list.
- The sender builds the message and sets the flag in field
119 - The network reads the flag and picks the rule set
- The network checks the fields against that rule set
- Pass: the message is delivered. Fail: a NAK (negative acknowledgement) goes back to the sender
- The receiving bank books, holds or queries the payment
HOW THE PICTURE MAPS
| In the picture | In the payment |
|---|---|
| The machine-sort sticker on the parcel | The STP flag in field 119 of block 3 |
| A printed address in the set format, nothing written by hand | Bank fields in option A, a BIC (bank code), not a name and address |
| The counter refuses a parcel whose address does not fit the sticker | A NAK (negative acknowledgement) from the network, before the message is delivered |
| The sticker for a parcel with a thick folder of papers | The REMIT flag in field 119 |
| A bigger pouch in place of the small envelope | Field 77T in place of field 70 |
| A plain parcel with no sticker | A plain MT103 |
WHERE THIS PICTURE STOPS
- A sticker on a parcel is only a label. The flag in field
119is a switch: it changes which rules the network runs, so the message is judged as the version it names. - A post office refuses a parcel only for form errors. The picture says nothing about whether the beneficiary's account exists or whether the receiving bank's checks are clear. Those come after the network accepts the message.
- The sticker for the thick folder is not open to everyone.
REMITwas for banks that agreed first, in a closed group. Swift's list now removes the bank-to-bank form. - In the cited archival STP table,
53a permits option A or B. Other listed institution fields are A-only. BIC format does not prove account validity or guarantee automatic credit.
HOOK
Stamp picks the rules; STP removes choices, REMIT adds room.
REMEMBER IT THIS WAY
A contrast: two neighbours told apart by one test.
STP takes choices away so a computer can read the message. REMIT adds room so an invoice list can travel with the money.
| In the trick | What it stands for |
|---|---|
STP | fewer options in the bank fields, so a computer can read the message |
REMIT | field 77T in place of field 70, for extended remittance information |
The STP rules narrow some other fields too, such as the instruction code; so removing choices is a summary and not the whole list.
TELL A FRIEND
A plain MT103 is a payment form, and a stamp in the header picks stricter rules. The STP stamp takes choices away; the REMIT stamp adds room for invoice detail.
OFTEN MIXED UP WITH MT103: the customer credit transfer. A plain MT103, the customer payment message, has no stamp and the widest choice of fields. The stamped versions narrow or swap fields, and the network checks them against a different rule set.
CURRENT AS CHECKED
4 FIGURES
Swift CBPR+ FI-to-FI payment instructions
Swift coexistence for in-scope -to-FI payment instructions ended on 22 November 2025; that deadline did not retire every MT reporting, initiation, investigation or correspondence message.
CHECKED 2026-10-11RECHECK BY 2027-01-05
Sources & standards — 2 sources
- Official requirement
ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence — 22 November 2025
Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.
- Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only
CBPR+ roadmap beyond November 2025 ↗ — Swift · Message-specific roadmap beyond November 2025
Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.
The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.
Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.
The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.
Swift post-November-2025 contingency processing
After coexistence, treatment differs by : some instructions are NAKed and selected messages can enter temporary , chargeable since 1 January 2026. This is not continued normal MT-MX coexistence.
CHECKED 2026-10-11RECHECK BY 2027-01-05
Sources & standards — 1 source
- Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only
CBPR+ roadmap beyond November 2025 ↗ — Swift · Post-coexistence NAK and contingency-conversion treatment
Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.
The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.
Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.
The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.
Swift FIN (Swift's messaging network) bank-to-bank MT (message type) 103 REMIT and MT 103 (customer payment) STP after the end of CBPR+ (Cross-Border Payments and Reporting Plus) coexistence
After coexistence ended for in-scope bank-to-bank payment instructions, Swift's lists treat two of these messages differently. A bank-to-bank (message type) 103 REMIT is removed from the network and negatively acknowledged at once, never delivered or converted. A bank-to-bank MT 103 (customer payment) is put through contingency processing and converted to pacs.008 (bank-to-bank customer payment). Members of closed user groups can be handled differently.
CHECKED 2026-10-11RECHECK BY 2027-01-05
Sources & standards — 3 sources
- Scheme-specific rule
MT to ISO 20022 conversion FAQ ↗ — Swift · After the end of coexistence, MT 103 REMIT sent institution to institution is removed from the network and negatively acknowledged at once; MT 103 and MT 103 STP are put through contingency processing and converted (Internet Archive copy of Swift's page, snapshot of 15 February 2026)
Read on the access date through the Internet Archive's copy of the publisher's own URL, snapshot of 15 February 2026, at HTTP 200 and 25,816 bytes. That is stated because it matters: swift.com itself still could not be reached outright, returning HTTP 000 with no response at all, so the archive is the only route and the text is as it stood in February.
The previous note said a full-page fetch was unavailable. That half is still true of the live site and is now recorded with the evidence.
Every claim the entry already made survives the archived text, including the list of negatively acknowledged message types, which matches word for word. The set that is converted rather than rejected is added, because the entry named only the rejected half and a reader could reasonably have inferred the rest were unaffected.
One label is dropped. The entry called this the end of CBPR+ coexistence; the page never uses that term, and describes the scope as cross-border institution-to-institution payment instructions. The page's own words are used above.
- Scheme-specific ruleJune 2026 edition read in full; September 2026 edition seen as search excerpts only
CBPR+ roadmap beyond November 2025 ↗ — Swift · CBPR+ roadmap beyond November 2025: MT 102, MT 102 STP and MT 103 REMIT listed as removed; MT 103 and MT 103 STP handled by contingency conversion; investigations move to camt.110 and camt.111 through Case Management (search excerpt, page not opened)
Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.
The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.
Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.
The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.
- Market practice
A bank notice: end of co-existence, dates by message type ↗ — BNY · A bank notice listing MT 102, MT 102 STP, MT 103 REMIT, MT 201 and MT 203 as removed, and MT 103 and MT 103 STP as converted
A bank notice that repeats Swift's list. Swift's own page governs. Known only from a web-search excerpt; the page was not opened.
Swift FIN interbank MT101 relay
Swift's roadmap was due to discontinue the interbank (request for transfer) relay over (Swift's messaging network) by 14 November 2026. A CBPR+ (Cross-Border Payments and Reporting Plus) pain.001 relay was to replace it.
On 27 August 2026 Swift deferred that migration, alongside the rest of that year's payments changes, with no replacement date set. Swift has said an update is to follow; a bank page gives December 2026. Once coexistence ends, a single MT101 goes through chargeable and a multiple MT101 is NAKed.
The company-to-bank MT101 is a separate question. Corporates on (Swift's service for corporates) or a were never in that FIN deadline.
CHECKED 2026-08-27RECHECK BY 2027-01-05
Sources & standards — 2 sources
- Official requirement
Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Deferral of SR2026 payments changes, including the interbank MT101 relay retirement, and the promised update by December 2026
Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.
Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.
- Official requirement
Swift Standards MT (annual standards releases) ↗ — Swift · The original requirement now under deferral: interbank MT101 relay retirement date
Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.
Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.
Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.
SEE THE PAYMENT MOVE
PICTURE THE JOURNEY
A frame shop, a glass factory and a ledger hall with one card per officeOpen to read the picture, how it matches the payment and where it stops.
PICTURE IT
A frame shop, a glass factory and a ledger hall with one card per office
Picture a frame-shop owner who must pay a glass factory in another country for a load of glass. She keeps her money at her local cashier office. The glass factory keeps its money at a different cashier office abroad. The two offices have no direct dealings. Each keeps a balance card at a ledger hall, and a relay office carries notes between them.
She signs an order slip and hands it to her cashier office. The slip is only a request. The cashier checks that she may order and that her money is there. It also checks the and that no name is on a banned list. If the slip cannot be carried out, she hears in whatever way she and the office agreed. Otherwise the office takes the amount from her account and gives her a small slip that says one amount has left.
The office then writes the payment letter and hands it to the relay office. The relay office checks that the letter follows the printed form, keeps it safe until the next stop is ready and passes it on. It never touches a balance card. The ledger hall reads the letter and checks the names again for itself. Then it lowers her office's card and raises the glass factory's office's card. That entry is the moment the amount changes hands. The hall sends the glass factory's office a credit slip, and the payment letter follows through the relay office.
The glass factory's office checks the letter, matches it to the credit slip and adds the amount to the glass factory's account. Through the day the frame-shop owner receives a balance sheet and a list of entries, and at close a day statement. The ledger hall also sends each cashier office a copy of its own card, and the office compares that copy with its own book.
Several other turns are possible. If the ledger hall keeps a small handling fee, less glass money arrives. If the hall refuses the letter before it makes any entry, her office puts the amount back in her account. If the glass factory's office finds the account closed, it sends the amount back as a new payment the other way. If an office needs more detail, it posts a query note and waits for the reply. If the two copies of a card disagree, a clerk checks whether an entry is merely late or truly missing. If she asks for the amount back after the glass factory is paid, that is only a request, and the glass factory's office can refuse. (SYNTHETIC / TRAINING ONLY: the frame-shop owner and the glass factory are invented.)
THE REAL JOB A company pays a supplier abroad through its bank in the older Swift message format, with confirmations, reports, queries and returns.
HOW THE PICTURE MAPS
| In the picture | In the payment |
|---|---|
| The frame-shop owner signs an order slip for her cashier office | Asha Traders asks Bank Alfa to pay with the request message MT101Who: Asha Traders |
| The cashier checks her right to order, her money, the cut-off and the names | Bank Alfa validates the authority, funds, cut-off, routing and screeningWho: Bank Alfa |
| The office takes the amount and gives her a small slip | Bank Alfa debits Asha Traders; where agreed, MT900 confirms that one debitWho: Bank Alfa |
| The relay office checks the printed form, keeps the letter safe, passes it on | Swift FIN, the message network, checks the format and forwards messages; it holds no account |
| The payment letter that her office posts to the ledger hall | The customer payment message MT103 is the instruction, not the money |
| The ledger hall reads the letter and checks the names for itself | Meridian Bank validates and screens the payment for itselfWho: Meridian Bank |
| The hall lowers one office's card and raises the other's | Book transfer: Meridian Bank debits Bank Alfa's account and credits Nordbank's accountWho: Meridian Bank |
| A credit slip goes to the glass factory's office | MT910 tells Nordbank that its account at Meridian Bank was credited |
| The glass factory's office matches the letter to the slip, then credits | Nordbank validates, screens and matches the payment before it pays its customerWho: Nordbank |
| The glass factory's account goes up | Northstar Components, the supplier, is credited by NordbankWho: Northstar Components |
| A balance sheet and a list of entries by day, a statement at close | MT941 gives balances, MT942 lists daytime entries and MT940 is the day statement |
| The owner ticks each statement line against her own order slip | Asha Traders matches the MT940 entry to its own request, MT101 |
| The hall sends each office a copy of its own card | MT950 reports the entries on Bank Alfa's account at Meridian BankWho: Meridian Bank |
| A clerk lays two cards side by side and finds an entry on only one | Maya Chen compares Bank Alfa's books with the MT950; a lone entry is a breakWho: Maya Chen |
| An entry written today on one card and tomorrow on the other | A timing difference clears itself; an unmatched entry gets a query, MT199 |
| The cashier cannot carry out the slip and tells her in the agreed way | A rejected request: no MT103 is sent and funds stay with Asha Traders |
| The hall keeps a small handling fee as the letter passes | Shared charges: Meridian Bank takes off a fee, so the supplier receives lessWho: Meridian Bank |
| The hall refuses the letter before it makes any entry | REJT: no value is booked, so Bank Alfa restores the customer balance |
| The glass factory's office finds the account closed and sends the amount back | RETN: Nordbank returns settled funds as a second payment the other wayWho: Nordbank |
| An office posts a query note, and the reply comes back | MT195 asks, MT196 answers; MT199 is the free-text version |
| The owner asks her office to get the paid amount back | Bank Alfa sends MT192, a cancellation request; it asks and reverses nothingWho: Bank Alfa |
| The glass factory's office agrees to hand it back, or refuses | MT196 answers: CNCL accepted, with a return to follow, or RJCR refused |
WHERE THIS PICTURE STOPS
- In the picture the owner could ask her office to get the amount back. In the journey that is a cancellation request,
MT192. It only asks. The beneficiary's bank can refuse it, and the first settlement stands. - The slips and sheets in the picture look like proof that the glass factory was paid. They are not.
MT900confirms one debit, andMT940lists entries on Asha Traders' own account. Only the credit at Nordbank shows the supplier was paid. - The ledger hall in the picture is one keeper with a card for each office. This journey settles on one correspondent's books. Other routes use more banks or a shared payment system, and the picture cannot show which.
- The picture does not say how current this route is. This journey is the older Swift message format, and a new build does the same job in
ISO 20022. - The handling fee in the picture is small and illustrative. In the journey the charge option, such as
SHAfor shared, decides who bears each bank's fee. The message trail is the only record of what was taken. - The cashier in the picture tells the owner of a failed slip in an agreed way. A real corporate service is agreed bank by bank, so how a failure reaches the customer varies. Swift's rules have the bank send a rejection advice, normally an
MT195(a query), though anMT199(a free-format message) is allowed. TheISO 20022journey uses the structuredpain.002status report.
HOOK
Messages ask, report and query. One ledger entry settles.
REMEMBER IT THIS WAY
A chunk: a long list grouped so it is easier to hold.
Group the account reports by what they hold: MT941 balances, MT942 daytime entries and MT940 the day statement.
| In the trick | What it stands for |
|---|---|
MT941 | gives balances |
MT942 | lists daytime entries |
MT940 | is the day statement |
TELL A FRIEND
In the older Swift message format, one payment brings a request, the payment message, confirmations, reports and queries. The between banks is what settles it.
OFTEN MIXED UP WITH What the network says back (ACK, NAK). That topic teaches the network's accepted-or-refused answer to one message. This journey shows the bank answers, such as debit, credit, reject, return and statement, which arrive as other messages.
PRACTISE AND KEEP
IMPLEMENTATION RESOURCES
2 RESOURCES
EVIDENCE AT ARM'S REACH
Apply the base message definition first, then the scheme or infrastructure profile that governs this topic.
An XSD checks XML structure. A usage guideline adds profile rules, conditional fields, code restrictions, and business controls. XSD-valid does not mean scheme-compliant.
MT103 REMIT field matrix
Sources for this topic — 11 sources
- Scheme-specific rule
Swift Standards MT (annual standards releases) ↗ — Swift · Category 1, MT 103 STP and MT 103 REMIT: the validation flag STP or REMIT in field 119 of the block 3 user header, and the restrictions each variant adds (search excerpts of public copies of the Swift format, re-confirmed in a 2026 search excerpt: MT103 STP validation by STP in field 119; fields 52, 54, 55, 56, 57 option A only, 53 options A and B; REMIT variant has no field 70 and uses 77T; page not opened); archival/message-record evidence, current authenticated handbook not opened.
Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.
Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.
Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.
- Market practice
prowide/prowide-core — a reader, writer and validator for SWIFT MT messages ↗ — Prowide (open source, Apache 2.0) · MT103_REMIT.java at SRU 2025: field 77T mandatory in the REMIT variant, which has no field 70
An implementation, not the standard. Swift's own standards releases are the authority and where the handbook and a library disagree, the handbook wins — the same relationship this registry already records for the Nacha, Fedwire and Australian batch-file implementations.
What it does not carry, and what is therefore not published from it: code values — what may legitimately appear in a form-of-credit, confirmation-instruction, partial-shipment or purpose field — and the network-validated rules that bind one field to another. Those live in the handbook, and their absence is the boundary that the login still enforces.
Cross-checked rather than taken alone: an independent bank-published standards-release guide states the same field count and the same count of mandatory fields for the issue-of-a-documentary-credit message, and names the same two fields as that release's additions.
Read again on 2026-10-17 by direct fetch of the raw source files: the header block classes, the trailer field list, the character set helper, the generated field classes 103 to 121 and the generated message classes. Block 1 gives application identifiers F, A and L, service identifiers 01 and 21, a four-character session number and a six-character sequence number. Input block 2 gives priority S, U or N, delivery monitoring 1, 2 or 3, and time limit 003 for urgent and 020 for normal.
Field 103 is named the FINCopy service code. The X, Y and Z lists are the implementation's reading of the User Handbook. These are comments in an implementation, not Swift's handbook. The library notes that, per Swift documentation, the time limit a sender types is ignored by the system. Where the handbook and the library differ, the handbook wins.
On 2026-10-25 the field classes Field22D, Field23S and Field44J were opened and read at raw.githubusercontent.com. So were the message classes MT300 (the foreign exchange confirmation), MT707 (the documentary credit amendment) and MT760 (the guarantee message). They gave these validation patterns: 22D 4!c, 23S 6!a, and for 44J a country code with optional subdivision of 35 and narrative of 65. They also gave the sequence structure of the MT300 (A to F with B1, B2, D1, E1, E1a, E1a1) and of the MT760 (A, B, C). They carry no code lists.
- Market practice
MT103 Single Customer Credit Transfer — copy of the Swift format held by the Consejo Monetario Centroamericano (CMCA) payment systems committee ↗ — secmca.org (a copy of Swift's format; not Swift) · Public copy of the MT103 format (folder dated February 2011): STP restrictions on fields 52, 53, 54, 55, 56, 57 and 23E, and the account subfield of 59a; REMIT requires registration in the Extended Remittance Information message user group (search excerpt, page not opened)
Known only from web-search excerpts on the access date; the PDF was not opened. The folder name suggests February 2011, so the text may predate several standards releases. A copy, not Swift's own page. Cited as market-practice.
- Market practice
Manual MT103 — Millennium bcp ↗ — Millennium bcp (ind.millenniumbcp.pt) · Bank MT103 manual: block 3 must carry STP in field 119; fields 52, 54, 55, 56 and 57 option A only; field 53 options A and B; field 23E only CORT, INTC, SDVA and REPA; subfield 1 (account) of field 59 or 59A always mandatory in the STP version (search excerpt, page not opened)
Known only from web-search excerpts on the access date; the PDF was not opened. Release date unknown. Not Swift's own page.
- Market practice
STP guideline, April 2024 edition — Commerzbank ↗ — Commerzbank (commerzbank.de) · Bank STP guideline: field 23E codes CORT, INTC, SDVA and REPA listed as allowed (search excerpt, page not opened)
Known only from web-search excerpts on the access date; the PDF was not opened. Bank-specific rules may be stricter than Swift's. Not Swift's own page.
- Scheme-specific rule
Standard MT (message type) Release 2018 - Mandatory changes in category 1 and category 2 ↗ — Swift (swift.com) · Standards MT Release 2018: header block 3 mandatory for MT 103, MT 103 REMIT and MT 103 STP, with the UETR in field 121 required in all three (search excerpt, page not opened)
Known only from a web-search excerpt on the access date; the page was not opened. Dated 2018, so later releases may have changed the detail. Search summary of the 2018 notice and of Swift's gpi compatibility criteria; page not opened. Dated 2018, so later releases may differ.
- Scheme-specific rule
MT to ISO 20022 conversion FAQ ↗ — Swift · After the end of coexistence, MT 103 REMIT sent institution to institution is removed from the network and negatively acknowledged at once; MT 103 and MT 103 STP are put through contingency processing and converted (Internet Archive copy of Swift's page, snapshot of 15 February 2026)
Read on the access date through the Internet Archive's copy of the publisher's own URL, snapshot of 15 February 2026, at HTTP 200 and 25,816 bytes. That is stated because it matters: swift.com itself still could not be reached outright, returning HTTP 000 with no response at all, so the archive is the only route and the text is as it stood in February.
The previous note said a full-page fetch was unavailable. That half is still true of the live site and is now recorded with the evidence.
Every claim the entry already made survives the archived text, including the list of negatively acknowledged message types, which matches word for word. The set that is converted rather than rejected is added, because the entry named only the rejected half and a reader could reasonably have inferred the rest were unaffected.
One label is dropped. The entry called this the end of CBPR+ coexistence; the page never uses that term, and describes the scope as cross-border institution-to-institution payment instructions. The page's own words are used above.
- Scheme-specific ruleJune 2026 edition read in full; September 2026 edition seen as search excerpts only
CBPR+ roadmap beyond November 2025 ↗ — Swift · CBPR+ roadmap beyond November 2025: MT 102, MT 102 STP and MT 103 REMIT listed as removed; MT 103 and MT 103 STP handled by contingency conversion; investigations move to camt.110 and camt.111 through Case Management (search excerpt, page not opened)
Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.
The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.
Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.
The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.
- Market practice
MT103 (customer payment) STP Quality Rules — Raiffeisen Bank International ↗ — Raiffeisen Bank International (rbinternational.com) · A bank's own STP quality rules sheet: it lists options A, F and K for field 50a, and wider options for fields 56a and 57a than other sources show (search excerpt, page not opened).
Known only from web-search excerpts on the access date; the PDF was not opened. A separate quality layer, not Swift's format definition. Not cited for the option-A rule.
- Simplified educational illustration
Payments Signal editorial teaching models — Payments Signal
What this simplifies: Field lists are curated for learning and cover only what public copies agree on. Swift's own manual is behind a login and was not opened. National and bilateral usage rules are omitted. Every person and firm named is fictional: SYNTHETIC / TRAINING ONLY.
Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.
- Official requirement
Swift Category 1 Message Reference Guide, SR2018, version 2.0 ↗ — Swift · Official SR2018searchexcerpt,pp173–174,page not opened:53aA/Bexception;otherlistedinstitutionfieldsA-only.Notacurrentall-releaserecipe.
Search excerpt, page not opened. The cited publisher/version was identified through normal web search; handbook access restrictions are preserved. Do not infer unshown fields or newer-release rules.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.