TOPIC 13/2914 MINNOT STARTED

Not the cover that was promised: short, over, doubled or in the wrong currency

A cover that is short, over, doubled, in the wrong currency or never matched is a case to resolve, not rounding. In the older MT (message type) pair, read the account first.

L1–L4 are part of the Pro pass

L0 Explain simply

Use case — Cassia Bank holds a payment announcement from Bank Alfa for Asha Traders. The money that arrived behind it is not the money that was announced. What should Cassia Bank do?

Asha Traders owes a supplier abroad USD 250,000.00, which means 250,000 US dollars. Asha banks with Bank Alfa. The supplier banks with Cassia Bank. Bank Alfa and Cassia Bank hold no account with each other, but both hold one at Meridian Bank. SYNTHETIC / TRAINING ONLY: every bank, firm and amount in this lesson is made up.

So Bank Alfa sends two things by two routes. The first is a message straight to Cassia Bank. It says whom to pay and how much, and it is called an MT103. It carries no money. The second moves the money through Meridian Bank. It is called an MT202 COV, and is short for cover. In this lesson Cassia Bank credits the supplier only when the money has arrived and matches the message. Whether a bank may credit before the cover arrives is each bank's own credit decision.

This is the older way to send a , the (MT) way. Swift, the bank messaging network, has ended the period when banks could send these payments in the old and the new ISO 20022 style side by side. So now you meet this pair in older systems and in temporary converted traffic. The same cases in the newer style have their own lesson. Which banks still send the pair, and how, depends on each bank and on Swift's service rules.

Most of the time the two match and nobody notices. This lesson is about five times they do not. The money can be a little short. It can be too much. A second cover can arrive for the same payment. The currency can be wrong. Or the money can fail to match the message at all. None of these is a rounding error.

A message shows only what someone asked for. The account entries show what really moved. So the first move is to read the account, not to send another cover. A second cover cannot undo a mistake in the first. It adds a new movement that someone must explain.

In every case the supplier is not credited yet. That hold is the control working, not a breakdown. The case stays open until someone finds the cause.

Check yourself. The cover is USD 25.00 short, and the books still balance. Is that fine? No. Something took USD 25.00 out of the cover. The banks must read the charge details and find out what before anyone decides what to credit.

PICTURE IT

A room booking and its deposit

A venue gets an email booking for ten guests. The deposit comes separately, by a different route. The booking number is written on the deposit slip. The front desk opens the room only when the deposit matches the booking. The room stays shut if the deposit is short, too large, paid twice, in another currency or without a booking number. It opens when someone finds out why.

THE REAL JOB Reading the account next to the announcement lets Cassia Bank spot a cover that is not the one promised, before anyone credits the supplier.

  1. Bank Alfa sends the MT103 (customer payment message) straight to Cassia Bank
  2. Bank Alfa sends the MT202 COV (cover transfer) through Meridian Bank
  3. Meridian Bank books the cover and sends an MT910 credit advice
  4. Cassia Bank matches the money to the message and stops on a difference
  5. The banks read the account entries before anything new is sent
One cover, from the announcement to the decision

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The email booking for ten guestsThe MT103 (customer payment message) says whom to pay and how muchWho: Bank Alfa
The deposit that arrives separatelyThe MT202 COV moves the money through the middle bankWho: Meridian Bank
The booking number on the deposit slipThe related reference :21: quotes the reference of the customer payment message, the MT103
The front desk comparing deposit and bookingMatching the money against the messageWho: Cassia Bank
Counting what is actually in the tillReading the account entries to see what really movedWho: Cassia Bank
Short, too large, paid twice, wrong currency, no booking numberA cover that is short, over, doubled, in the wrong currency or missing
The room stays shutThe supplier is not credited until the case is resolvedWho: Cassia Bank

WHERE THIS PICTURE STOPS

  • A deposit is paid to the venue. Here the money lands in Cassia Bank's account at Meridian Bank, and Cassia Bank then owes it to a different person, the supplier.
  • A venue can hand cash back at the desk. A bank cannot undo a settled cover by deleting a message. Money that moved comes back only through a separate movement that the banks agree.
  • The fee account in this example explains where the gap was booked; it does not authorise it. Current PMPG v4.1.1 FAQ4 and section6 recommend preserving COV principal for MT as well as MX. Investigate the short funding and settle valid charges separately.
  • The picture shows one way the older Swift message pair behaves. Which difference is allowed, and who holds each case, follows each bank's agreement and the service rules.

HOOK

The message is a promise; the account is the proof.

REMEMBER IT THIS WAY

A rule of thumb: if you see this, think that.

When the MT103 (customer payment message) and the cover disagree, believe the account and ask the sender. The message shows what was asked for; the account shows what moved.

What each part of the trick stands for
In the trickWhat it stands for
The MT103the customer payment message, the announcement of whom to pay and how much
The accountthe entries at Meridian Bank that show what really moved
Ask the sendera query message such as an MT195 to Bank Alfa

The account shows what moved but not why, so the cause still needs a question to the sending bank.

TELL A FRIEND

An older Swift cover can arrive short, large, twice, in the wrong currency or not at all. The bank holds the case and reads the account entries before it credits anyone or sends anything.

OFTEN MIXED UP WITH Not the cover that was promised: short, over, doubled or in the wrong currency. That lesson teaches the same cases in the ISO 20022 style, with a direct payment message and a cover message. This one teaches the older Swift pair. There the cover (MT202 COV, a cover transfer) quotes the reference of the MT103 (customer payment message) in :21:.

CURRENT AS CHECKED

3 FIGURES
  • Swift CBPR+ FI-to-FI payment instructions

    Swift coexistence for in-scope -to-FI payment instructions ended on 22 November 2025; that deadline did not retire every MT reporting, initiation, investigation or correspondence message.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 2 sources
    1. Official requirement

      ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence — 22 November 2025

      Describes current CBPR+ adoption, the 22 November 2025 end of coexistence for in-scope FI-to-FI payment instructions, later migration work and the structured-address milestone. That milestone was previously due in November 2026 and has since been deferred (see swift-sr2026-controlled-extension-2026). · Checked 2026-07-18

      Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.

    2. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Message-specific roadmap beyond November 2025

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  • Swift post-November-2025 contingency processing

    After coexistence, treatment differs by : some instructions are NAKed and selected messages can enter temporary , chargeable since 1 January 2026. This is not continued normal MT-MX coexistence.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 1 source
    1. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Post-coexistence NAK and contingency-conversion treatment

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  • Swift FIN interbank MT101 relay

    Swift's roadmap was due to discontinue the interbank (request for transfer) relay over (Swift's messaging network) by 14 November 2026. A CBPR+ (Cross-Border Payments and Reporting Plus) pain.001 relay was to replace it.

    On 27 August 2026 Swift deferred that migration, alongside the rest of that year's payments changes, with no replacement date set. Swift has said an update is to follow; a bank page gives December 2026. Once coexistence ends, a single MT101 goes through chargeable and a multiple MT101 is NAKed.

    The company-to-bank MT101 is a separate question. Corporates on (Swift's service for corporates) or a were never in that FIN deadline.

    CHECKED 2026-08-27RECHECK BY 2027-01-05

    Sources & standards — 2 sources
    1. Official requirement

      Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Deferral of SR2026 payments changes, including the interbank MT101 relay retirement, and the promised update by December 2026

      Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

      Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

      Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

    2. Official requirement

      Swift Standards MT (annual standards releases) ↗ — Swift · The original requirement now under deferral: interbank MT101 relay retirement date

      Defines the MT message standards (including MT101, MT103, MT202/202 COV, and the MT9xx statement messages) exchanged over the Swift FIN network, maintained through annual standards releases. · Checked 2026-11-12

      Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.

      Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.

      Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.

SEE THE PAYMENT MOVE

PICTURE THE JOURNEY

A gift of orange crates, two posted notes and a hub's tally boardsOpen to read the picture, how it matches the payment and where it stops.

PICTURE IT

A gift of orange crates, two posted notes and a hub's tally boards

A woman wants to give a large gift of crates of oranges to her sister, who lives in another country. She cannot carry them, so she asks her local packer to send them. The packer looks over the order and checks both names against a banned list. It then takes the crates from her store and counts them in its own stock.

Both packers keep their stock in one big cold store run by a hub firm. The hub keeps a tally board for each packer. Crates in this store never leave it. Giving crates from one packer to the other means the hub changes two numbers.

The woman's packer now posts two notes, and they take different roads. A post office holds each note safely and passes it on with the next van. The first note goes straight to the sister's packer. It names the giver and the sister, says how large the gift is, and carries an order number. It holds no crates.

The second note goes to the hub. It asks the clerk to lower one packer's tally and raise the other's by the same amount, for that order number. It repeats the two names, so the clerk can check them against a banned list as well.

The clerk changes the two numbers. No crate moves. The clerk then sends the sister's packer a slip, by the same post office. It says its tally went up for that order number.

At the sister's packer, a goods-received desk now holds the first note and the slip. It checks that the order number, the size of the gift and the names agree. Normally the packer hands the crates to the sister only then. The first note alone is not enough.

Some days go differently. The slip can arrive before the first note, so the desk keeps the new tally in an unnamed pile until the note turns up. The hub can keep a small handling share, so the slip shows fewer crates than the note. The desk then hands over only what arrived.

The order number can be missing from the slip, so the desk asks the sending packer which order it belongs to. The desk can also hand over crates before any slip arrives, but then it lends its own stock. Or the second note can be refused on the way, so the desk asks and the sending packer posts it again.

Suppose the woman finds out the order was a mistake or a trick. Her sister already has the crates, so her packer can only ask for them back. It sends a request to the sister's packer and another to the hub. If both agree, the crates come back by a fresh move, not by rubbing out the first.

THE REAL JOB A sends details straight to the and money through a correspondent; the bank matches both before it credits.

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The woman who gives the giftThe ordering customer, who asks the bank to pay abroad
Her packer, who checks the order, screens the names and takes the cratesBank Alfa validates, screens and debits the customer, then sends both messagesWho: Bank Alfa
The post office that stores and carries every note and the slipSwift FIN, the network that stores each message and forwards it
The first note, posted straight to the sister's packerThe MT103 customer payment message, sent direct; it carries no money
The second note, asking the hub to change two talliesThe MT202 COV cover message, which asks the correspondent to move the money
The two names repeated on the second noteSequence B of the MT202 COV copies customer names for every bank to screen
The hub, with a tally board for each packerMeridian Bank, the correspondent that holds an account for each bankWho: Meridian Bank
The clerk changing two numbers while no crate movesThe book transfer: two balances change on the correspondent's books, and no cash travels
The slip saying the sister's packer's tally went upThe MT910 credit advice, which tells the beneficiary bank the money side is done
The goods-received desk that checks note, slip and order numberCassia Bank, the beneficiary's bank, matches the payment message MT103 with the coverWho: Cassia Bank
The sister, who normally gets the crates only after the matchThe beneficiary, normally credited only once instruction and money have matched
The slip comes first, so the tally rise waits in an unnamed pileCover first: funds wait as unapplied funds until the message MT103 clears repair
The hub keeps a handling share, so the slip shows fewer cratesA charge on the cover leg makes it short; the bank credits what arrived
The order number is missing from the slipThe cover does not quote the payment's reference, so the banks confirm by MT299
The desk hands over crates before any slip arrivesEarly credit: the beneficiary bank lends its own money until the cover settles
The second note was refused on the way, so the first note waitsCover missing: the bank holds, asks by MT195, and the cover is reissued
The packer asks for the gift back with a request to each sideRecall: MT192 for the payment message MT103, MT292 for the cover leg

WHERE THIS PICTURE STOPS

  • The crates stand for balances. In the real payment no cash or goods travel. The correspondent changes two entries on its own books, and a message carries no value.
  • The picture has one banned list. In the real flow every bank that touches either message screens it for itself, so one payment can be held at more than one point. A hold is the control working.
  • The picture treats handing over early as a casual choice. In the real flow, crediting on the customer payment message MT103 alone is a lending decision. It is a bank's own policy choice, set inside an agreed limit, not a rule of the message.
  • The picture has the two packers simply agree. In the real flow a cancellation is only a request, and the receiving bank can refuse it. Money returns only as a new transfer that settles for itself, and the cover is never deleted.
  • The picture has one hub and one route. Real cover chains can use several banks on each side, and a fee can come off along the way. This journey also shows the older Swift form. A companion journey shows the newer pair: the payment message pacs.008 and the cover message pacs.009 COV.

HOOK

Two roads, one match: normally credit only when note and money meet.

REMEMBER IT THIS WAY

A contrast: two neighbours told apart by one test.

Ask which road a message is on. One road tells the , and the other moves the money through the correspondent.

What each part of the trick stands for
In the trickWhat it stands for
MT103the customer payment message, sent direct; it carries no money
MT202 COVthe cover message, which asks the correspondent to move the money

TELL A FRIEND

A sends the details straight to the and the money by another route. The receiving bank normally pays out only when the two match.

OFTEN MIXED UP WITH Serial versus cover routing. That topic tells serial from cover: in serial the instruction and the money travel together. This journey follows one , whose two halves must be matched, and the turns it can take.

MESSAGES INVOLVED

PRACTISE AND KEEP

IMPLEMENTATION RESOURCES

21 RESOURCES

EVIDENCE AT ARM'S REACH

Apply the base message definition first, then the scheme or infrastructure profile that governs this topic.

An XSD checks XML structure. A usage guideline adds profile rules, conditional fields, code restrictions, and business controls. XSD-valid does not mean scheme-compliant.

Usage guidelineCBPR+

PMPG correspondent-payment and reporting market practice

OPEN OFFICIAL SOURCE
Teaching sampleIllustrative; no scheme profile checked

MT103 customer credit transfer — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT202 COV cover payment — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT910 credit confirmation — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT103 rejection convention — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT103 return convention — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT195 payment query — raw FIN

PRO PASS
Lifecycle packIllustrative; no scheme profile checked

MT legacy and migration lifecycle — ZIP pack

PRO PASS
MappingCBPR+

MT103 → pacs.008 implementation mapping

PRO PASS
MappingCBPR+

MT202 COV → pacs.009 COV implementation mapping

PRO PASS
MappingCBPR+

MT103 /REJT/ convention → pacs.002 implementation mapping

PRO PASS
MappingCBPR+

MT103 /RETN/ convention → pacs.004 implementation mapping

PRO PASS
MappingCBPR+

MT195 → camt.110 implementation mapping

PRO PASS
MappingCBPR+

MT910 → camt.054 implementation mapping

PRO PASS
Field matrixSwift MT

MT103 field matrix

PRO PASS
Field matrixSwift MT

MT195 field matrix

PRO PASS
Field matrixSwift MT

MT202 COV field matrix

PRO PASS
Field matrixSwift MT

MT910 field matrix

PRO PASS
Test packIllustrative; no scheme profile checked

Payment lifecycle test cases

PRO PASS
Migration notesCBPR+

MT to MX migration notes

PRO PASS
Sources for this topic — 10 sources
  1. Scheme-specific rule

    Swift Standards MT (annual standards releases) ↗ — Swift · Category 2 MT202 COV: related reference :21: quotes the underlying MT103 reference, the shared UETR links the pair, and :32A: carries value date, currency and amount (read from the registered message record; field-level text sits behind a Swift login and was not opened)

    Defines the MT message standards (including MT101, MT103, MT202/202 COV, and the MT9xx statement messages) exchanged over the Swift FIN network, maintained through annual standards releases. · Checked 2026-11-12

    Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.

    Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.

    Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.

  2. Market practice

    PMPG Cover Payments Market Practice Guidelines — version 4.1.1, April 2026 ↗ — Swift / Payments Market Practice Group · Cover Payments Guidelines v4.1.1 April 2026, operative sections/FAQs read6November2026: per-leg funding/advice, correlation, MPG13 cancellation, early credit/WFSM and FAQ4 principal preservation; application depends on the stated case.

    Cover-payment linkage, waiting for funding versus agreed early credit, cancellation and return coordination, and preserving cover principal. · Checked 2026-11-05

    Public PDF opened on 5 November 2026. Edition 4.1.1, April 2026. Section 1.1 p7 distinguishes COV funding from camt.054 credit advice or camt.053 reconciliation at its creditor. Sections 1.1–1.2 distinguish pacs.009.001.08 ADV from COV. Sections 14–16 and FAQ1 explain policy-based early credit and an applicable wait-for-settlement agreement. Section 13 coordinates direct and cover cancellation and its footnote says an additional cover-chain request is not required. Market-practice guidance does not certify any bank implementation or replace effective usage guidelines.

  3. Market practice

    Oracle Banking Payments 14.8 — Cover Matching of incoming MT (message type) 103/MT 202 (bank-to-bank transfer) ↗ — Oracle · One vendor guide (Oracle Banking Payments 14.8): credit entries from an incoming statement are matched to inbound MT 103 messages awaiting cover, by the account owner reference against field 20, then currency and amount. Other pages of the guide also name the UETR or value date. Single-vendor practice; search excerpts, pages not opened, re-confirmed 2026-10-11 on the 14.7 edition. No excerpt said what happens when the reference matches but the amount or currency does not.

    A core banking vendor's user guide describing how one payments engine matches credit entries from incoming account statements (MT (message type) 940, 950 or 942) with inbound MT 103 messages awaiting cover. The account owner reference against field 20 of the MT 103 first, then currency and amount, and the payment is marked matched when everything agrees. · Checked 2026-10-11

    Known only from a web-search excerpt on the access date; the page was not opened. A vendor guide describes one implementation, so it is treated as market practice and never as the Swift rule. Cited for the order of the matching checks only. The excerpt did not say what happens when the reference matches but the currency or amount does not, so no such behaviour is claimed. Different versions of the guide word the matching differently. Not cited for any Swift field rule.

  4. Market practice

    ISO 20022 learning guides — module 6, a deep dive on pacs.004 and pacs.002 ↗ — The Bank of New York Mellon Corporation (BNY) · A correspondent bank's May 2021 learning guide (module 6, pacs.004 and pacs.002): there is no dedicated FIN equivalent of pacs.004; to return an MT103 or MT202 the agent sends the original back to the sender with a return code in Field 72 (search excerpt, page not opened, re-confirmed 2026-10-11; single-source; describes the practice pacs.004 replaced)

    A bank's explanatory guide to the two ISO 20022 lifecycle messages: what a payment return (pacs.004) and a payment status report (pacs.002) are for, the flows each is sent in, and what the blocks inside them hold.

    Cited here for three things it states plainly. That pacs.004 puts the parties of the original payment in the original transaction block and the parties of the return in a separate return chain, in which the roles of those parties change. That the return chain exists because a returned MT103 left the receiver unable to tell which of the two sets it was reading. And that a return may have to follow a different route from the original — the guide gives an approaching cut-off as the case — which is why the two blocks are kept apart.

    Also cited for the plain statement that a rejection is sent before settlement and a return after it, which is the distinction the lifecycle pair on this site is built around. · Checked 2026-08-23

    Downloaded and read in full from the publisher's own domain on the access date: eight pages, read with pdftotext, so nothing cited from it rests on a search excerpt.

    It is a bank's teaching material rather than a standard or a scheme rule, so citations to it carry the market-practice label. Every ISO element address and every presence flag on the mapping tables it supports is read from the published XSD instead, never from this guide.

    Where it describes what CBPR+ requires it is reporting a usage guideline this site does not reproduce. Nothing is quoted from those passages and no CBPR+ rule is asserted from them.

    One tension in the document is worth recording rather than smoothing over. It describes the MT return convention as sending the original message back unchanged with a return code in field 72. And then says in the next section that the resulting ambiguity — whether the parties listed are the original's or the return's — is exactly what the return chain was added to remove. Both halves are taken together, because the first read alone would suggest the convention was settled when the document's own point is that it was not.

  5. Scheme-specific rule

    MT to ISO 20022 conversion FAQ ↗ — Swift · After the coexistence period, MT 103, MT 202, MT 202 COV and MT 205 COV are put through contingency processing and converted so the receiver gets ISO 20022; contingency processing is chargeable from 1 January 2026 (read through the Internet Archive copy of the operator's page, snapshot of 15 February 2026; also confirmed 2026-10-11 by search excerpt, page not opened, from Swift's end-of-coexistence guide: coexistence ended 22 November 2025 and contingency processing is chargeable from 1 January 2026)

    The operator's own account of what happens to MT payment traffic after the coexistence period ended. That period, for cross-border institution-to-institution payment instructions, ended on 22 November 2025.

    The page separates two groups of message. MT 102, MT 102 STP, MT 103 REMIT, MT 201 and MT 203, sent institution to institution, are removed from the network, negatively acknowledged at once and never delivered. MT 103, MT 103 STP, MT 200, MT 202, MT 202 COV, MT 205 and MT 205 COV are instead put through contingency processing, which validates them and converts them so the receiver gets ISO 20022.

    It also separates four things that are easy to confuse: contingency processing for senders, the in-flow translation service on FINplus, the locally deployable Swift Translator, and Transaction Manager.

    Both contingency processing and in-flow translation are chargeable from 1 January 2026, on converted volume, and are outside the fixed fee.

    The operator states these are short-term measures rather than an alternative to adopting the standard, and promised a roadmap during the second quarter of 2026. · Checked 2026-08-23

    Read on the access date through the Internet Archive's copy of the publisher's own URL, snapshot of 15 February 2026, at HTTP 200 and 25,816 bytes. That is stated because it matters: swift.com itself still could not be reached outright, returning HTTP 000 with no response at all, so the archive is the only route and the text is as it stood in February.

    The previous note said a full-page fetch was unavailable. That half is still true of the live site and is now recorded with the evidence.

    Every claim the entry already made survives the archived text, including the list of negatively acknowledged message types, which matches word for word. The set that is converted rather than rejected is added, because the entry named only the rejected half and a reader could reasonably have inferred the rest were unaffected.

    One label is dropped. The entry called this the end of CBPR+ coexistence; the page never uses that term, and describes the scope as cross-border institution-to-institution payment instructions. The page's own words are used above.

  6. Official requirement

    ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence for in-scope FI-to-FI payment instructions; not every MT message retired on the same date

    Describes current CBPR+ adoption, the 22 November 2025 end of coexistence for in-scope FI-to-FI payment instructions, later migration work and the structured-address milestone. That milestone was previously due in November 2026 and has since been deferred (see swift-sr2026-controlled-extension-2026). · Checked 2026-07-18

    Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.

  7. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

    CBPR+ roadmap beyond November 2025 ↗ — Swift · Post-coexistence NAK and contingency-conversion treatment; message-specific roadmap beyond the payment-instruction deadline

    Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

    Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

    Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

    Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

    The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

    Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

    The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  8. Official requirement

    Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Deferral of the SR2026 payments changes, including the interbank MT101 relay retirement

    Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

    Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

    Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

  9. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: SYNTHETIC / TRAINING ONLY. Asha Traders, Bank Alfa, Meridian Bank, Cassia Bank and Maya Chen are fictional, and one shared correspondent stands in for a longer chain. The amounts are teaching figures taken from the cover flow. The over, doubled and wrong-currency cases have no standard behind their details. A bank's own agreement and the service rules decide who holds each case and what difference is allowed. The Message Type (MT) pair is taught as the older and contingency-network lifecycle, not as the current default.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

  10. Market practice

    Payments Market Practice Group (PMPG) Best Practice Guidance for the Return of Funds and Rejects of Payments ↗ — Swift / Payments Market Practice Group · Return of Funds and Rejects May 2025, operative pp3–25 read6November2026: settlement-method/leg scope, actual original references, settled-return handling and partial returns; Scenario4 heading/body ambiguity disclosed.

    Distinguishes rejection of an unsettled instruction from returning settled funds; serial and cover examples and settlement-method context. · Checked 2026-09-28

    Public PDF opened through web search. Applied per interbank leg, not as a single status for the entire customer journey. Bank service rules still govern permitted messages and responses.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.