TOPIC 15/2914 MINNOT STARTED

Money with no owner: cover first, or cover that names nothing

Money can land at Cassia Bank with nobody to give it to, because the MT103 is not readable yet or the cover names nothing, and Cassia parks it rather than guessing.

L1–L4 are part of the Pro pass

L0 Explain simply

Use case — USD 250,000.00 has reached Cassia Bank, and no has arrived to say whose it is. What does a careful bank do with money it cannot give to anyone?

Asha Traders banks with Bank Alfa, the . Its supplier banks with Cassia Bank, the bank that will credit the supplier. In the , the details of the payment and the money travel by two routes. The details go straight to Cassia in an MT103, the customer payment message. The money goes through Meridian Bank, which keeps an account for each of the two banks. SYNTHETIC / TRAINING ONLY: every bank, person and amount here is invented.

A second message, the MT202 COV, moves the money. COV (cover) means cover. Meridian then tells Cassia that its account was credited, using an MT910, a credit notice. Usually Cassia pairs the money with the MT103 and credits the supplier. This lesson is about the days when the pairing cannot be made.

There are two reasons. In the first, the MT103 is stuck in Cassia's own , a list of messages that a person must fix. The money arrives first. In the second, the received credit advice lacks the usable reference that ties it to the customer payment. In both stories the money is controlled but still requires ownership, ageing and escalation. Disclosure: no Swift or market-practice text we could find says where a must park such money, or for how long. The parking, asking and releasing here are this academy's teaching model. Real banks differ.

So Cassia parks the money in a , a holding account for money the bank cannot yet apply to a customer. Parking is not a failure. It is the control working. The reason decides who fixes the problem. If the message is stuck, Cassia clears its own queue. If the link is missing, Cassia asks Bank Alfa to confirm the pairing.

This is the older (MT) way of doing it. Coexistence for bank-to-bank payment instructions has ended, so the MT form lives on as a contingency path and in older systems. The twin of this lesson is a separate topic. The habit is the same in both: park, ask, then release.

Check yourself. The money looks like a perfect match for a payment of the same size from the same bank. Why does Cassia still wait? A match that only looks right is a guess. A guess can send USD 250,000.00 to the wrong customer, and a day's delay costs far less.

PLAIN WORDS · 1 in this section
escalation
passing a case up to a senior or expert person

PICTURE IT

A hall caretaker and a crate at the door

Picture a village hall. A courier leaves a heavy crate at the door early in the morning. The caretaker holds a booking list. The note about the crate is still stuck in the sorting room, or the tag on the crate names no event. The caretaker puts the crate in the locked store room and writes it in a log. The crate is handed over only when the note and the tag agree on one event.

THE REAL JOB When cover money cannot yet be paired with its customer payment, the holds it safely and asks; it does not guess.

  1. The cover settles and Cassia sees the money
  2. Cassia cannot pair it with an MT103
  3. The money is parked in suspense
  4. Fix the queue, or ask Bank Alfa with an MT299
  5. The pairing is proved
  6. The supplier is credited
One cover that arrives with no owner

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The crate left at the hall doorThe cover money landing at Cassia Bank, announced by an MT910Who: Cassia Bank
The note about the crateThe MT103, the customer payment message
The note stuck in the sorting roomThe MT103 waiting in Cassia's repair queue
The tag that names no eventA cover that quotes no reference in :21:
The locked store room and the logThe suspense account, where the money waits in view
The caretaker asking the sender which event the crate is forCassia's MT299 question to Bank AlfaWho: Cassia Bank
Handing the crate to the organiserCrediting the supplier once the pairing is proved

WHERE THIS PICTURE STOPS

  • A crate is a thing in a room. Money here is a book entry, and the cover has already settled. Nothing travels to the store room.
  • A caretaker may keep the crate for as long as the hall allows. How long money may wait in suspense is set by each bank's policy and agreements, and this lesson states no deadline.
  • In the picture the note and the crate come one after the other. In the cover method the two routes run at the same time. They do not wait for each other, so either can arrive first.
  • The picture shows the older Message Type (MT) format. After coexistence ended, MT is the older and contingency lifecycle. The same habit is taught in ISO 20022 in a separate topic.
  • At a shared correspondent, the beneficiary bank generally receives credit advice/statement, not the full cover instruction. Missing mandatory original identifiers are validation failures; missing advice correlation or a valid wrong reference can instead cause matching work. Matching remains subject to legal controls and an owned ageing/escalation process.

HOOK

Park it, ask, then release: never guess whose money it is.

REMEMBER IT THIS WAY

A contrast: two neighbours told apart by one test.

Ask one question: can Cassia use the MT103 (customer payment message) it already holds? If not, fix the queue; if so, ask the sender with an MT299 (free-format message).

What each part of the trick stands for
In the trickWhat it stands for
No, the MT103 is still in repaircause one, where Cassia clears its own repair queue
Yes, but the received credit advice lacks a usable linkcause two, where Cassia asks Bank Alfa with an MT299

Both causes can happen together; then the bank clears its queue and also asks.

TELL A FRIEND

When cover money lands before the bank knows whose it is, the bank parks it and sorts out why. If its own message is stuck it clears the queue; if the received credit advice lacks a usable link it asks the sender.

OFTEN MIXED UP WITH Money with no owner: cover first, or cover that names nothing. The same two causes told in ISO 20022. This topic tells them in the older Swift format, where the question and answer travel as the free-format MT299.

CURRENT AS CHECKED

3 FIGURES
  • Swift CBPR+ FI-to-FI payment instructions

    Swift coexistence for in-scope -to-FI payment instructions ended on 22 November 2025; that deadline did not retire every MT reporting, initiation, investigation or correspondence message.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 2 sources
    1. Official requirement

      ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence — 22 November 2025

      Describes current CBPR+ adoption, the 22 November 2025 end of coexistence for in-scope FI-to-FI payment instructions, later migration work and the structured-address milestone. That milestone was previously due in November 2026 and has since been deferred (see swift-sr2026-controlled-extension-2026). · Checked 2026-07-18

      Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.

    2. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Message-specific roadmap beyond November 2025

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  • Swift post-November-2025 contingency processing

    After coexistence, treatment differs by : some instructions are NAKed and selected messages can enter temporary , chargeable since 1 January 2026. This is not continued normal MT-MX coexistence.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 1 source
    1. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Post-coexistence NAK and contingency-conversion treatment

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  • Swift FIN interbank MT101 relay

    Swift's roadmap was due to discontinue the interbank (request for transfer) relay over (Swift's messaging network) by 14 November 2026. A CBPR+ (Cross-Border Payments and Reporting Plus) pain.001 relay was to replace it.

    On 27 August 2026 Swift deferred that migration, alongside the rest of that year's payments changes, with no replacement date set. Swift has said an update is to follow; a bank page gives December 2026. Once coexistence ends, a single MT101 goes through chargeable and a multiple MT101 is NAKed.

    The company-to-bank MT101 is a separate question. Corporates on (Swift's service for corporates) or a were never in that FIN deadline.

    CHECKED 2026-08-27RECHECK BY 2027-01-05

    Sources & standards — 2 sources
    1. Official requirement

      Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Deferral of SR2026 payments changes, including the interbank MT101 relay retirement, and the promised update by December 2026

      Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

      Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

      Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

    2. Official requirement

      Swift Standards MT (annual standards releases) ↗ — Swift · The original requirement now under deferral: interbank MT101 relay retirement date

      Defines the MT message standards (including MT101, MT103, MT202/202 COV, and the MT9xx statement messages) exchanged over the Swift FIN network, maintained through annual standards releases. · Checked 2026-11-12

      Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.

      Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.

      Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.

SEE THE PAYMENT MOVE

PICTURE THE JOURNEY

A gift of orange crates, two posted notes and a hub's tally boardsOpen to read the picture, how it matches the payment and where it stops.

PICTURE IT

A gift of orange crates, two posted notes and a hub's tally boards

A woman wants to give a large gift of crates of oranges to her sister, who lives in another country. She cannot carry them, so she asks her local packer to send them. The packer looks over the order and checks both names against a banned list. It then takes the crates from her store and counts them in its own stock.

Both packers keep their stock in one big cold store run by a hub firm. The hub keeps a tally board for each packer. Crates in this store never leave it. Giving crates from one packer to the other means the hub changes two numbers.

The woman's packer now posts two notes, and they take different roads. A post office holds each note safely and passes it on with the next van. The first note goes straight to the sister's packer. It names the giver and the sister, says how large the gift is, and carries an order number. It holds no crates.

The second note goes to the hub. It asks the clerk to lower one packer's tally and raise the other's by the same amount, for that order number. It repeats the two names, so the clerk can check them against a banned list as well.

The clerk changes the two numbers. No crate moves. The clerk then sends the sister's packer a slip, by the same post office. It says its tally went up for that order number.

At the sister's packer, a goods-received desk now holds the first note and the slip. It checks that the order number, the size of the gift and the names agree. Normally the packer hands the crates to the sister only then. The first note alone is not enough.

Some days go differently. The slip can arrive before the first note, so the desk keeps the new tally in an unnamed pile until the note turns up. The hub can keep a small handling share, so the slip shows fewer crates than the note. The desk then hands over only what arrived.

The order number can be missing from the slip, so the desk asks the sending packer which order it belongs to. The desk can also hand over crates before any slip arrives, but then it lends its own stock. Or the second note can be refused on the way, so the desk asks and the sending packer posts it again.

Suppose the woman finds out the order was a mistake or a trick. Her sister already has the crates, so her packer can only ask for them back. It sends a request to the sister's packer and another to the hub. If both agree, the crates come back by a fresh move, not by rubbing out the first.

THE REAL JOB A sends details straight to the and money through a correspondent; the bank matches both before it credits.

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The woman who gives the giftThe ordering customer, who asks the bank to pay abroad
Her packer, who checks the order, screens the names and takes the cratesBank Alfa validates, screens and debits the customer, then sends both messagesWho: Bank Alfa
The post office that stores and carries every note and the slipSwift FIN, the network that stores each message and forwards it
The first note, posted straight to the sister's packerThe MT103 customer payment message, sent direct; it carries no money
The second note, asking the hub to change two talliesThe MT202 COV cover message, which asks the correspondent to move the money
The two names repeated on the second noteSequence B of the MT202 COV copies customer names for every bank to screen
The hub, with a tally board for each packerMeridian Bank, the correspondent that holds an account for each bankWho: Meridian Bank
The clerk changing two numbers while no crate movesThe book transfer: two balances change on the correspondent's books, and no cash travels
The slip saying the sister's packer's tally went upThe MT910 credit advice, which tells the beneficiary bank the money side is done
The goods-received desk that checks note, slip and order numberCassia Bank, the beneficiary's bank, matches the payment message MT103 with the coverWho: Cassia Bank
The sister, who normally gets the crates only after the matchThe beneficiary, normally credited only once instruction and money have matched
The slip comes first, so the tally rise waits in an unnamed pileCover first: funds wait as unapplied funds until the message MT103 clears repair
The hub keeps a handling share, so the slip shows fewer cratesA charge on the cover leg makes it short; the bank credits what arrived
The order number is missing from the slipThe cover does not quote the payment's reference, so the banks confirm by MT299
The desk hands over crates before any slip arrivesEarly credit: the beneficiary bank lends its own money until the cover settles
The second note was refused on the way, so the first note waitsCover missing: the bank holds, asks by MT195, and the cover is reissued
The packer asks for the gift back with a request to each sideRecall: MT192 for the payment message MT103, MT292 for the cover leg

WHERE THIS PICTURE STOPS

  • The crates stand for balances. In the real payment no cash or goods travel. The correspondent changes two entries on its own books, and a message carries no value.
  • The picture has one banned list. In the real flow every bank that touches either message screens it for itself, so one payment can be held at more than one point. A hold is the control working.
  • The picture treats handing over early as a casual choice. In the real flow, crediting on the customer payment message MT103 alone is a lending decision. It is a bank's own policy choice, set inside an agreed limit, not a rule of the message.
  • The picture has the two packers simply agree. In the real flow a cancellation is only a request, and the receiving bank can refuse it. Money returns only as a new transfer that settles for itself, and the cover is never deleted.
  • The picture has one hub and one route. Real cover chains can use several banks on each side, and a fee can come off along the way. This journey also shows the older Swift form. A companion journey shows the newer pair: the payment message pacs.008 and the cover message pacs.009 COV.

HOOK

Two roads, one match: normally credit only when note and money meet.

REMEMBER IT THIS WAY

A contrast: two neighbours told apart by one test.

Ask which road a message is on. One road tells the , and the other moves the money through the correspondent.

What each part of the trick stands for
In the trickWhat it stands for
MT103the customer payment message, sent direct; it carries no money
MT202 COVthe cover message, which asks the correspondent to move the money

TELL A FRIEND

A sends the details straight to the and the money by another route. The receiving bank normally pays out only when the two match.

OFTEN MIXED UP WITH Serial versus cover routing. That topic tells serial from cover: in serial the instruction and the money travel together. This journey follows one , whose two halves must be matched, and the turns it can take.

MESSAGES INVOLVED

PRACTISE AND KEEP

IMPLEMENTATION RESOURCES

22 RESOURCES

EVIDENCE AT ARM'S REACH

Apply the base message definition first, then the scheme or infrastructure profile that governs this topic.

An XSD checks XML structure. A usage guideline adds profile rules, conditional fields, code restrictions, and business controls. XSD-valid does not mean scheme-compliant.

Usage guidelineCBPR+

PMPG correspondent-payment and reporting market practice

OPEN OFFICIAL SOURCE
Teaching sampleIllustrative; no scheme profile checked

MT103 customer credit transfer — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT202 COV cover payment — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT910 credit confirmation — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT103 rejection convention — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT103 return convention — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT299 Category 2 free-format message — raw FIN

PRO PASS
Lifecycle packIllustrative; no scheme profile checked

MT legacy and migration lifecycle — ZIP pack

PRO PASS
MappingCBPR+

MT103 → pacs.008 implementation mapping

PRO PASS
MappingCBPR+

MT202 COV → pacs.009 COV implementation mapping

PRO PASS
MappingCBPR+

MT103 /REJT/ convention → pacs.002 implementation mapping

PRO PASS
MappingCBPR+

MT103 /RETN/ convention → pacs.004 implementation mapping

PRO PASS
MappingCBPR+

MT299 query → camt.110 implementation mapping

PRO PASS
MappingCBPR+

MT299 answer → camt.111 implementation mapping

PRO PASS
MappingCBPR+

MT910 → camt.054 implementation mapping

PRO PASS
Field matrixSwift MT

MT103 field matrix

PRO PASS
Field matrixSwift MT

MT202 COV field matrix

PRO PASS
Field matrixSwift MT

MT910 field matrix

PRO PASS
Field matrixSwift MT

MT299 field matrix

PRO PASS
Test packIllustrative; no scheme profile checked

Payment lifecycle test cases

PRO PASS
Migration notesCBPR+

MT to MX migration notes

PRO PASS
Sources for this topic — 5 sources
  1. Scheme-specific rule

    Swift Standards MT (annual standards releases) ↗ — Swift · MT103, MT202 COV and MT910 message types, and the free-format Category 2 message MT299 (full field specifications sit behind a Swift login and are not reproduced; known here from the registry record and search excerpts)

    Defines the MT message standards (including MT101, MT103, MT202/202 COV, and the MT9xx statement messages) exchanged over the Swift FIN network, maintained through annual standards releases. · Checked 2026-11-12

    Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.

    Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.

    Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.

  2. Market practice

    PMPG Cover Payments Market Practice Guidelines — version 4.1.1, April 2026 ↗ — Swift / Payments Market Practice Group · Cover Payments Guidelines v4.1.1 April 2026, operative sections/FAQs read6November2026: per-leg funding/advice, correlation, MPG13 cancellation, early credit/WFSM and FAQ4 principal preservation; application depends on the stated case.

    Cover-payment linkage, waiting for funding versus agreed early credit, cancellation and return coordination, and preserving cover principal. · Checked 2026-11-05

    Public PDF opened on 5 November 2026. Edition 4.1.1, April 2026. Section 1.1 p7 distinguishes COV funding from camt.054 credit advice or camt.053 reconciliation at its creditor. Sections 1.1–1.2 distinguish pacs.009.001.08 ADV from COV. Sections 14–16 and FAQ1 explain policy-based early credit and an applicable wait-for-settlement agreement. Section 13 coordinates direct and cover cancellation and its footnote says an additional cover-chain request is not required. Market-practice guidance does not certify any bank implementation or replace effective usage guidelines.

  3. Scheme-specific rule

    MT to ISO 20022 conversion FAQ ↗ — Swift · MT 202 COV is among the MT messages put through contingency processing and converted so the receiver gets ISO 20022 (archived copy of the publisher's page)

    The operator's own account of what happens to MT payment traffic after the coexistence period ended. That period, for cross-border institution-to-institution payment instructions, ended on 22 November 2025.

    The page separates two groups of message. MT 102, MT 102 STP, MT 103 REMIT, MT 201 and MT 203, sent institution to institution, are removed from the network, negatively acknowledged at once and never delivered. MT 103, MT 103 STP, MT 200, MT 202, MT 202 COV, MT 205 and MT 205 COV are instead put through contingency processing, which validates them and converts them so the receiver gets ISO 20022.

    It also separates four things that are easy to confuse: contingency processing for senders, the in-flow translation service on FINplus, the locally deployable Swift Translator, and Transaction Manager.

    Both contingency processing and in-flow translation are chargeable from 1 January 2026, on converted volume, and are outside the fixed fee.

    The operator states these are short-term measures rather than an alternative to adopting the standard, and promised a roadmap during the second quarter of 2026. · Checked 2026-08-23

    Read on the access date through the Internet Archive's copy of the publisher's own URL, snapshot of 15 February 2026, at HTTP 200 and 25,816 bytes. That is stated because it matters: swift.com itself still could not be reached outright, returning HTTP 000 with no response at all, so the archive is the only route and the text is as it stood in February.

    The previous note said a full-page fetch was unavailable. That half is still true of the live site and is now recorded with the evidence.

    Every claim the entry already made survives the archived text, including the list of negatively acknowledged message types, which matches word for word. The set that is converted rather than rejected is added, because the entry named only the rejected half and a reader could reasonably have inferred the rest were unaffected.

    One label is dropped. The entry called this the end of CBPR+ coexistence; the page never uses that term, and describes the scope as cross-border institution-to-institution payment instructions. The page's own words are used above.

  4. Scheme-specific ruleJune 2026 edition read in full; September 2026 edition seen as search excerpts only

    CBPR+ roadmap beyond November 2025 ↗ — Swift · Free-format MT199, MT299 and MT999 used for exceptions and investigations move to camt.110 and camt.111 (registry record; page not opened by this author)

    Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

    Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

    Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

    Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

    The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

    Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

    The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  5. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: The cover payment, the two bank-side causes and every name and amount are synthetic teaching constructions on the flow-swift-cover path, with one correspondent bank on the money route. Which queues, suspense policies, reference fields and query channels apply varies by institution, agreement and the Swift rules in force; the lesson states no deadline and no liability.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.