Pre-mortems and failure mode analysis (FMEA)
Picture a launch as already failed and list why, then score each reason by how bad, how often and how hidden it is. Two ways to find and rank risks before they happen.
L1–L4 are part of the Pro pass
L0 Explain simply
Analogy: Exploring a failed trip. Before a trip, imagine it went badly and explore why: missed transport, lost keys or a flat phone. The exercise can reveal overlooked dependencies, but the imagined reasons are possibilities, not predictions.
A premortem uses an imagined future failure to surface concerns while a plan can still change. Sam facilitates one before Daily List's reminder launch, with Nina the and the people who understand delivery and use.
(FMEA) is a structured examination of functions, ways they can fail, consequences, possible causes and controls, followed by prioritised action and review. Copying a list of worries into a scored table does not automatically complete that analysis.
Some FMEA approaches use a (RPN), conventionally multiplying local Severity, Occurrence and Detection ratings. That product is not the definition of every FMEA or the sole rule for choosing action. High severity and mandatory obligations can matter even when the product is low.
The packing analogy is limited: teams need candid participation, varied expertise, explicit assumptions and accountable follow-up. A score or a meeting does not prove the risks have been found or eliminated.
PLAIN WORDS · 2 in this section
- premortem
- a plan test that assumes failure and asks why
- prioritised
- put first in order of importance
PICTURE IT
The picture is the one the lesson above opens with. The table below shows how each part of it matches the work.
THE REAL JOB Surface concerns, then systematically examine failure mechanisms and controls with appropriate priorities, owners and validation.
- Imagine the failure
- Generate reasons independently
- Share in turn
- Examine functions and controls
- Agree and verify action
HOW THE PICTURE MAPS
| In the picture | In the work |
|---|---|
| Imagining the trip has gone wrong | The pre-mortem |
| Writing each reason on your own list | Each person writing alone |
| One way the trip could go wrong, such as a lost passport | A failure mode |
| Deciding what to pack or check | The action on a top row |
| Weighing which reason matters most | Risk prioritisation using consequences, controls, obligations and the chosen method |
WHERE THIS PICTURE STOPS
- A packing plan can also be collaborative; analysis still needs varied perspectives and safe participation.
- A list does not remove uncertainty from risk assessments or prove a future outcome.
- The example does not enumerate every possible failure mode or prescribe one prioritisation formula.
HOOK
Imagine, examine, act, verify.
REMEMBER IT THIS WAY
A sequence: the real steps, in order.
For a conventional local RPN, examine severity, occurrence and poor detectability before multiplying. Read the profile, constraints and evidence; the product alone does not choose action.
| In the trick | What it stands for |
|---|---|
| How bad | severity |
| How often | occurrence |
| How hidden | detection |
A very severe failure can still need action when the multiplied number is low.
TELL A FRIEND
A premortem surfaces concerns, while FMEA examines functions, failure modes, effects, causes and controls. RPN is one method, not a universal priority rule; high severity and validated controls matter.
OFTEN MIXED UP WITH Risk analysis for change. That topic covers weighing risks for a change in general. This one adds two named ways to find risks and to rank them.
Sources & standards — 2 sources
- Market practice
FMEA — actual publisher scope and examples, reviewed November2024 ↗ — American Society for Quality · ASQ, FMEA, reviewed November 2024; actual definition, scope/functions/modes/effects/causes, currently exposed steps 1–8, example/limitations and permissions read. All five actual source figures inspected. Local source example 125 threshold is not universal. No artwork reused or missing full scoring instructions claimed read.
All five actual originals privately viewed: partial table, DFMEAform, new-approach flow, tablet-packaging case and 3×3 matrix. Local example RPN 125 threshold is not universal. No commercial reuse grant established, no source image copied.
- Market practice
The Pre-Mortem Method (14 January2021) ↗ — Gary Klein / Psychology Today · Gary Klein, The Pre-Mortem Method, 14 January 2021, actual creator article: failure framing, independent writing, rapid round-robin with leader candour, action generation and prioritisation refinements. Reported confidence study is not a project-success guarantee; original study not claimed read. Source graphic inspected, no reuse grant. Synthetic Daily List examples are independent.
Actual 320×240 seven-step original viewed. Graphic Triple Filter has impact/reversibility/likelihood; body discusses likelihood/impact/ease-of-prevention refinements. Do not silently merge them into one mandatory scheme. No reuse grant established, link-only.
PRACTISE AND KEEP
Sources for this topic — 16 sources
- Market practice
The pre-mortem method (Gary Klein, Psychology Today blog) ↗ — Psychology Today · The pre-mortem method (Gary Klein, Psychology Today blog): a pre-mortem assumes the project has failed and asks what went wrong, unlike a session asking what might go wrong (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
How to perform failure mode and effects analysis: methodology and worked examples (Reliability magazine guide) ↗ — Reliability magazine · How to perform FMEA: methodology and worked examples (Reliability magazine guide): severity, occurrence and detection are each rated one to ten and multiplied into a risk priority number; the detection scale is inverted (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Pre-mortem (Atlassian Team Playbook) ↗ — Atlassian · Pre-mortem (Atlassian Team Playbook): a timed pre-mortem session: imagine failure, write risks, discuss each, agree actions; vendor team guide (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Back to the future: temporal perspective in the explanation of events (Journal of Behavioral Decision Making, 1989) ↗ — Journal of Behavioral Decision Making · Back to the future: temporal perspective in the explanation of events (Journal of Behavioral Decision Making, 1989): people explain an event framed as already certain with longer, more specific reasons; the idea named prospective hindsight (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Failure modes and effects analysis template (National Ecological Observatory Network) ↗ — National Ecological Observatory Network (NEON) · Failure modes and effects analysis template (National Ecological Observatory Network): the usual worksheet columns: failure mode, effect, cause, current controls, ratings, recommended action (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
A better way than the risk priority number (Accendo Reliability) ↗ — Accendo Reliability · A better way than the risk priority number (Accendo Reliability): multiplying rating scales gives the same score for different risks; some handbooks use action priority tables instead (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Risk assessment standards (IEC Technical Committee 56) ↗ — International Electrotechnical Commission (IEC) · Risk assessment standards (IEC Technical Committee 56): IEC 31010 guides the choice of risk techniques and IEC 60812 covers FMEA; standard text not read (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Using failure mode and effects analysis in sprint planning (ProjectManagement.com blog post) ↗ — ProjectManagement.com · Using FMEA in sprint planning (ProjectManagement.com blog post): a short FMEA for backlog items in sprint planning; practitioner opinion (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Simplified educational illustration
Payments Signal editorial teaching models — Payments Signal
What this simplifies: Daily List, Sam, Nina, Leo, Tom and Mei are invented. The scores are teaching numbers. Real pre-mortems and tables are longer, scores are opinions, and the sources are a method author's blog, trade guides and vendor pages, not the standards themselves.
Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.
- Market practice
What is Fault Tree Analysis? Gates and events explained ↗ — Relyence · FTA top event with AND/OR gates and basic events; probability maths not taught here. (search excerpt, page not opened).
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Bow-tie diagrams ↗ — Engineers Australia REBoK · Bow-tie risk diagram (search excerpt, page not opened).
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
FMEA — actual publisher scope and examples, reviewed November2024 ↗ — American Society for Quality · ASQ, FMEA, reviewed November 2024; actual definition, scope/functions/modes/effects/causes, currently exposed steps 1–8, example/limitations and permissions read. All five actual source figures inspected. Local source example 125 threshold is not universal. No artwork reused or missing full scoring instructions claimed read.
All five actual originals privately viewed: partial table, DFMEAform, new-approach flow, tablet-packaging case and 3×3 matrix. Local example RPN 125 threshold is not universal. No commercial reuse grant established, no source image copied.
- Market practice
The Pre-Mortem Method (14 January2021) ↗ — Gary Klein / Psychology Today · Gary Klein, The Pre-Mortem Method, 14 January 2021, actual creator article: failure framing, independent writing, rapid round-robin with leader candour, action generation and prioritisation refinements. Reported confidence study is not a project-success guarantee; original study not claimed read. Source graphic inspected, no reuse grant. Synthetic Daily List examples are independent.
Actual 320×240 seven-step original viewed. Graphic Triple Filter has impact/reversibility/likelihood; body discusses likelihood/impact/ease-of-prevention refinements. Do not silently merge them into one mandatory scheme. No reuse grant established, link-only.
- Market practice
Official AIAG & VDA FMEA Handbook launch (3June2019) ↗ — Automotive Industry Action Group · AIAG, official AIAG & VDA FMEA Handbook launch, 3 June 2019, actual entire short release read: seven-step method, revised S/O/D and AP methodology/tables replace RPN in that automotive first edition. Not a universal abolition of RPN. Paid handbook/AP tables and inaccessible whitepaper not claimed read or copied.
Paid handbook and AP tables not read/copied; inaccessible whitepaper not used as opened evidence. Only cover illustration in the article, no matching reminder figure.
- Market practice
IEC60812:2018 edition3.0 — public catalogue scope ↗ — International Electrotechnical Commission · IEC official catalogue 60812:2018, edition 3.0, published 10 August 2018; actual public scope: planned/performed/documented/maintained FMEA/FMECA, hardware/software/human processes/interfaces, tailoring, alternative RPN and criticality-matrix methods. Catalogue only, not full paid standard or its detailed scales.
Public scope only; full 165-page paid standard not read. Do not infer exact scale anchors or a universal detection-before-user definition from catalogue metadata.
- Market practice
IEC31010:2019 edition2.0 — public catalogue scope ↗ — IEC / ISO · IEC official catalogue 31010:2019, edition 2.0, published 13 June 2019, joint ISO/IEC risk-assessment technique selection/application scope and validation emphasis read. Catalogue only; no full paid method descriptions or universal scoring anchors claimed read.
Public scope only; full 264-page paid standard not read. Independent conceptual bow-tie/Boolean examples are not copied standard diagrams or a quantitative safety analysis.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.