Optimise or re-engineer a process
Decide whether to trim a process or redesign it. Learn the baseline, the size of the gap, the signals for each choice, the risks, and how evidence supports the call.
L1–L4 are part of the Pro pass
L0 Explain simply
Analogy: A washer or new pipework. A leaking tap may need a washer; widespread pipe damage may justify a new arrangement. The analogy helps compare the scale of change, but neither a small repair nor a rebuild is automatically safe, cheap or successful.
improves an existing process, often incrementally. fundamentally rethinks the end-to-end process around its purpose and desired performance. They can be combined: improve urgent problems while investigating a broader redesign.
Nina, Daily List's , wants faster support replies. Sam, the analyst, must understand the current process, target, constraints and causes before recommending a change. A large gap is a reason to investigate, not proof that only a rebuild can work. A queue may be improved through routing, staffing, scheduling or other options; compare their evidence and trade-offs.
The analogy has limits. A household repair and a live support service have different obligations. Keep continuity, access, quality and recovery needs visible for either scale of change.
PLAIN WORDS · 1 in this section
- optimisation
- making something as good or effective as possible
PICTURE IT
The picture is the one the lesson above opens with. The table below shows how each part of it matches the work.
THE REAL JOB Compare incremental improvement with fundamental redesign using evidence, constraints and viable evaluation rather than gap size alone.
- Measure the baseline
- Break it into steps
- Total the small fixes
- Compare with the target
- Pilot the redesign
HOW THE PICTURE MAPS
| In the picture | In the work |
|---|---|
| A dripping tap | A small fault in one step |
| A new washer | Optimising the step |
| Rusted pipes behind the wall | A fault built into the design |
| Replacing the pipes | Re-engineering the process |
| Measuring how much water is lost | The baseline |
WHERE THIS PICTURE STOPS
- Neither the size of a repair nor the scale of redesign guarantees safety or cost.
- A queue is a lead to investigate, not proof only radical redesign can work.
- Live service continuity and recovery need explicit conditions.
HOOK
Washer for a drip, pipes for a rust.
REMEMBER IT THIS WAY
A rule of thumb: if you see this, think that.
Ask what causes the delay, which feasible changes meet the need and what evidence would justify the choice. The washer/pipes analogy is a memory aid, not a decision rule.
| In the trick | What it stands for |
|---|---|
| Dripping tap | A small fault in one step |
| Rusted pipes | Re-engineering the process |
| Measure the leak | The baseline |
Small changes can create serious harm and large gaps can have simple causes, so compare actual constraints and alternatives.
TELL A FRIEND
Optimisation improves the existing arrangement; re-engineering fundamentally rethinks the end-to-end process. Investigate causes, feasible options and important assumptions; neither label guarantees cost or safety.
OFTEN MIXED UP WITH Current state against future state. That topic compares how things are now with how they should be. This one decides how big a change the gap calls for.
Sources & standards — 1 source
- Market practice
What is business process reengineering (BPR)? ↗ — IBM Think · IBM Think, What is business process reengineering (BPR)?, Matthew Finio and Amanda Downie; actual publisher body read 6 November 2026: definition, incremental-versus-fundamental redesign, current/future-state assessment, dependencies, leadership/change management and evaluate/iterate sections. No publication date stated in the opened body. Synthetic timing cases and independently checked arithmetic are Payments Signal teaching examples.
No matching publisher figure for the fictional Daily List timing cases. No image reused. The course supplies its own additive representative-ticket examples; end-to-end medians must be calculated from actual ticket totals, not sums of independently measured stage medians. No publication date invented.
PRACTISE AND KEEP
Sources for this topic — 5 sources
- Market practice
When incremental is not enough: choosing re-engineering over continuous improvement (iSixSigma) ↗ — iSixSigma · When incremental is not enough: choosing re-engineering over continuous improvement (iSixSigma): when a process is fundamentally misaligned with its goals, redesign may be needed; otherwise steady improvement is the routine (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Process improvement vs. process re-engineering (Qntrl blog) ↗ — Qntrl · Process improvement vs. process re-engineering (Qntrl blog): improvement is less costly and disruptive; re-engineering rethinks work from the ground up and carries more risk (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Business process re-engineering notes (University College London module) ↗ — University College London · Business process re-engineering notes (University College London module): re-engineering is the radical redesign of business processes, a view credited to Hammer and Champy (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Simplified educational illustration
Payments Signal editorial teaching models — Payments Signal
What this simplifies: Daily List, its support process, the hours and the people are invented. Guides give no single threshold for a small or large gap, so the lesson shows how to compare and leaves the line to each team. The saving from a redesign is a guess until a pilot tests it.
Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.
- Market practice
What is business process reengineering (BPR)? ↗ — IBM Think · IBM Think, What is business process reengineering (BPR)?, Matthew Finio and Amanda Downie; actual publisher body read 6 November 2026: definition, incremental-versus-fundamental redesign, current/future-state assessment, dependencies, leadership/change management and evaluate/iterate sections. No publication date stated in the opened body. Synthetic timing cases and independently checked arithmetic are Payments Signal teaching examples.
No matching publisher figure for the fictional Daily List timing cases. No image reused. The course supplies its own additive representative-ticket examples; end-to-end medians must be calculated from actual ticket totals, not sums of independently measured stage medians. No publication date invented.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.