TOPIC 38/5214 MINNOT STARTED

Finding automation opportunities

Compare automation candidates using evidence, value and controls, then specify and test the intended process and hand-off.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: Choosing chores for a robot vacuum. A vacuum may suit an open floor better than a stairwell. You check the room, obstacles, intended result and what happens if it gets stuck. Repetition alone does not prove the purchase worthwhile or every mistake harmless.

An is work being considered for automation. A collects evidence about suitability and value; passing a short checklist is not implementation approval. An automation hand-off communicates an agreed design, constraints, unknowns and acceptance evidence to the people implementing and supporting it.

Daily List support copies new paid-plan sign-ups and sends welcome messages. Sam investigates the work before choosing a technology. Even a welcome message can reveal personal information or reach the wrong person, so its risk is not automatically cheap.

Conventional rule-driven automation, assisted work and decisions made with (artificial intelligence) can need different designs and controls. High-consequence work requires appropriate assurance and authority; it is not universally impossible to automate. A human review may be part of the design rather than a reason to reject all partial automation.

The vacuum picture is limited. Real work involves people, data rights, connected systems and competing objectives. Process improvement may help, but the team must validate what can safely change rather than remove every inconvenient step.

PLAIN WORDS · 3 in this section
stairwell
the space that holds a set of stairs
suitability
how well something fits a need
automate
make a machine do it without a person

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the work.

THE REAL JOB The picture connects candidate evidence, intended value, design and tested controls.

  1. State the outcome
  2. Compare evidence
  3. Assess improvements
  4. Specify design
  5. Test controls
  6. Hand over support
The robot vacuum

HOW THE PICTURE MAPS

How each part of the picture matches the work
In the pictureIn the work
The floors that are flat and cleaned every dayWork that repeats and is stable
The robot following a fixed routeClear rules
The stairwell and the odd cornerAlternate outcomes requiring an approved response
Moving the chairs before the robot runsAssessing process improvements and required controls
A map the robot can really followAn executable model
The brain that steers the robot round the mapThe process engine
What is in each room on the mapData: each fact a step reads and makes
A rule at each fork, with a way for every answerDecisions
Who moves the cables, the robot or youSteps and owners
Waiting for the dock, and what if it never endsWaits and time-outs
What the vacuum does when it gets stuckFailures
A neat map of the wrong routeAn exact model of a bad process
Telling the robot where the room starts and endsThe hand-off to the builders

WHERE THIS PICTURE STOPS

  • A vacuum does not capture business authority or data rights.
  • Frequency alone does not prove worthwhile automation.
  • A completed model still needs target implementation and tests.
  • A missing detail can fail differently across tools.

HOOK

Check evidence, value, design and controls.

REMEMBER IT THIS WAY

A chunk: a long list grouped so it is easier to hold.

Review data, decisions, actors, waits and failures; these lenses do not replace control and runtime testing.

What each part of the trick stands for
In the trickWhat it stands for
dataSpecify required inputs and outputs
decisionsValidate approved rule outcomes
actorsAutomated and human responsibilities
waitsDesign intended lifecycle and expiry handling
failuresHandle errors and partial effects safely

TELL A FRIEND

Compare candidate evidence, value and controls before choosing automation. Document and test the intended process rather than trusting a checklist or executable flag.

OFTEN MIXED UP WITH RPA feasibility and the process definition document. RPA feasibility focuses on a task and its definition; this topic compares broader automation choices and implementation hand-offs.

Sources & standards — 6 sources
  1. Market practice

    Detailed Assessment — UiPath Automation Hub Automation Cloud latest ↗ — UiPath · UiPath Automation Hub Automation Cloud latest, Detailed Assessment, actual field table and submission/post-automation sections read 7 November 2026: recurrence, transaction count/time, rework, staff costs, expected changes, variation, digital/structured input and review. Vendor snapshot, not a universal scoring standard.

    UiPath Automation Hub Automation Cloud latest, Detailed Assessment, actual field table and submission/post-automation sections read 7 November 2026: recurrence, transaction count/time, rework, staff costs, expected changes, variation, digital/structured input and review. Vendor snapshot, not a universal scoring standard. · Checked 2026-11-07

    Actual selected product documentation read. Live latest is a dated access snapshot; Task Capture content explicitly2022.4. No proprietary algorithm or source screenshot reproduced. General teaching examples, safe retry/partial-write proposals and economics assumptions are separate from vendor guarantees.

  2. Market practice

    Details about the PDD — UiPath Task Capture Standalone 2022.4 ↗ — UiPath · UiPath Task Capture Standalone 2022.4, Details about the PDD, complete main article read 7 November 2026: default template may differ; contacts/prerequisites, as-is and to-be maps, scope, business/application exceptions and reporting. Creating your own template Introduction also read. No screenshot copy or universal section mandate.

    UiPath Task Capture Standalone 2022.4, Details about the PDD, complete main article read 7 November 2026: default template may differ; contacts/prerequisites, as-is and to-be maps, scope, business/application exceptions and reporting. Creating your own template Introduction also read. No screenshot copy or universal section mandate. · Checked 2026-11-07

    Actual selected product documentation read. Live latest is a dated access snapshot; Task Capture content explicitly2022.4. No proprietary algorithm or source screenshot reproduced. General teaching examples, safe retry/partial-write proposals and economics assumptions are separate from vendor guarantees.

  3. Market practice

    Process Mining Manifesto — IEEE Task Force on Process Mining (2011; published 2012) ↗ — Task Force on Process Mining · IEEE Task Force on Process Mining, Process Mining Manifesto (2011; published 2012), fifteen-page layout: §2 pp3–5 (ordered events and optional timestamps; discovery, conformance, enhancement); §3 GP1–GP6 pp6–9 (quality, questions, concurrency, mapping, abstraction, continuous use); §4 C1–C6 pp10–12 (correlation, timing, incomplete samples, drift and model quality). Actual official PDF read 7 November 2026.

    Historical primary task-force guidance: fifteen-page layout §2 pp3–5, GP1–GP6 pp6–9 and C1–C6 pp10–12 actually read. Ordered case/activity events; optional timestamps; discovery/conformance/enhancement inputs/outputs; data scope, model abstraction/quality and drift. Not a current product certification. · Checked 2026-11-07

    Actual official fifteen-page PDF downloaded from https://tf-pm.org/upload/1580737614108.pdf; SHA256 9c312c5e431e17dbb2c023599c6ed5857f8e91759229c5499df3c3de47fb7c29 matches audited cache. Original legacy URL returned403; ordinary web search located the official mirror. Publisher page states ©2012 The Authors and Creative Commons Attribution Non-commercial. Source diagrams are linked, not reproduced in this commercial academy; explanations are paraphrased, synthetic examples remain labelled.

  4. Market practice

    Business Process Model and Notation (BPMN) specification page ↗ — Object Management Group · BPMN 2.0.2 formal/2013-12-09 December 2013, actual §§2.2–2.3 and10.2.1/Table 10.1 printedpp145–146,10.9 pp308–309 read 7 November 2026 alongside previously read task/gateway/event sections: optional isExecutable, public restriction, modeling versus execution conformance. No current certification claim or source-art copy.

    BPMN 2.0.2 formal/2013-12-09, December 2013 cover; §§9.3–9.4,10.3,10.5–10.7 and13.4 opened/read6 November 2026. BPMN 2.0.2 formal/2013-12-09 December 2013, actual §§2.2–2.3 and10.2.1/Table 10.1 printedpp145–146,10.9 pp308–309 read 7 November 2026 alongside previously read task/gateway/event sections: optional isExecutable, public restriction, modeling versus execution conformance. No current certification claim or source-art copy. · Checked 2026-11-07

    Official public catalogue/PDF retrieved and the cited sections read. BPMN 2.0.2 formal/2013-12-09, December 2013 cover; §§9.3–9.4,10.3,10.5–10.7 and13.4 opened/read6 November 2026. Original educational paraphrase; no source artwork copied. Additional actual §§2.2–2.3,10.2.1/Table 10.1 and10.9 read 7 November 2026. Optional/public executable scope and separate modeling/execution conformance; source permission front matter read, no standard diagram copied.

  5. Market practice

    Decision Model and Notation1.6, formal/25-12-02 ↗ — Object Management Group · DMN 1.6 formal/25-12-02, actual §4.3 and5.1 overview read 7 November 2026 alongside prior selected §§6/8: decision requirements and decision logic, DRD and FEEL/boxed expressions beyond tables. Catalogue date and PDF cover Release Date:tbd kept distinct; no whole specification read claimed.

    §§6,8.2,8.2.11–8.2.12: dependencies, tables, hit policies and completeness. Catalogue reportsSeptember 2026; PDF cover leaves Release Date as tbd. Pin version/document identity; do not infer engine support. DMN 1.6 formal/25-12-02, actual §4.3 and5.1 overview read 7 November 2026 alongside prior selected §§6/8: decision requirements and decision logic, DRD and FEEL/boxed expressions beyond tables. Catalogue date and PDF cover Release Date:tbd kept distinct; no whole specification read claimed. · Checked 2026-11-07

    Primary public document opened and the cited material read on2026-11-06. Original educational paraphrase; no source figure copied. §§6,8.2,8.2.11–8.2.12: dependencies, tables, hit policies and completeness. Catalogue reportsSeptember 2026; PDF cover leaves Release Date as tbd. Pin version/document identity; do not infer engine support. Additional actual §4.3/5.1 read 7 November 2026: decision requirements/logic and boxed expressions beyond tables. Fresh PDF SHA256995743c39d3efee13375d837f3ddff815b72bba0534343a7c9186fb0298c00d0; catalogue date and cover tbd distinction preserved. No figure copied.

  6. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal · Daily List chores, invitation and welcome cases are synthetic. Missing artefact facts stay unknown; proposed data/rules/timers/control responses require approval. Five review lenses are a local checklist, not a complete engine contract. No automatic entitlement override, cheap-error, benefit or causal claim.

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: Daily List chores, invitation and welcome cases are synthetic. Missing artefact facts stay unknown; proposed data/rules/timers/control responses require approval. Five review lenses are a local checklist, not a complete engine contract. No automatic entitlement override, cheap-error, benefit or causal claim.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

PRACTISE AND KEEP

Sources for this topic — 7 sources
  1. Market practice

    Detailed Assessment — UiPath Automation Hub Automation Cloud latest ↗ — UiPath · UiPath Automation Hub Automation Cloud latest, Detailed Assessment, actual field table and submission/post-automation sections read 7 November 2026: recurrence, transaction count/time, rework, staff costs, expected changes, variation, digital/structured input and review. Vendor snapshot, not a universal scoring standard.

    UiPath Automation Hub Automation Cloud latest, Detailed Assessment, actual field table and submission/post-automation sections read 7 November 2026: recurrence, transaction count/time, rework, staff costs, expected changes, variation, digital/structured input and review. Vendor snapshot, not a universal scoring standard. · Checked 2026-11-07

    Actual selected product documentation read. Live latest is a dated access snapshot; Task Capture content explicitly2022.4. No proprietary algorithm or source screenshot reproduced. General teaching examples, safe retry/partial-write proposals and economics assumptions are separate from vendor guarantees.

  2. Market practice

    Details about the PDD — UiPath Task Capture Standalone 2022.4 ↗ — UiPath · UiPath Task Capture Standalone 2022.4, Details about the PDD, complete main article read 7 November 2026: default template may differ; contacts/prerequisites, as-is and to-be maps, scope, business/application exceptions and reporting. Creating your own template Introduction also read. No screenshot copy or universal section mandate.

    UiPath Task Capture Standalone 2022.4, Details about the PDD, complete main article read 7 November 2026: default template may differ; contacts/prerequisites, as-is and to-be maps, scope, business/application exceptions and reporting. Creating your own template Introduction also read. No screenshot copy or universal section mandate. · Checked 2026-11-07

    Actual selected product documentation read. Live latest is a dated access snapshot; Task Capture content explicitly2022.4. No proprietary algorithm or source screenshot reproduced. General teaching examples, safe retry/partial-write proposals and economics assumptions are separate from vendor guarantees.

  3. Market practice

    Process Mining Manifesto — IEEE Task Force on Process Mining (2011; published 2012) ↗ — Task Force on Process Mining · IEEE Task Force on Process Mining, Process Mining Manifesto (2011; published 2012), fifteen-page layout: §2 pp3–5 (ordered events and optional timestamps; discovery, conformance, enhancement); §3 GP1–GP6 pp6–9 (quality, questions, concurrency, mapping, abstraction, continuous use); §4 C1–C6 pp10–12 (correlation, timing, incomplete samples, drift and model quality). Actual official PDF read 7 November 2026.

    Historical primary task-force guidance: fifteen-page layout §2 pp3–5, GP1–GP6 pp6–9 and C1–C6 pp10–12 actually read. Ordered case/activity events; optional timestamps; discovery/conformance/enhancement inputs/outputs; data scope, model abstraction/quality and drift. Not a current product certification. · Checked 2026-11-07

    Actual official fifteen-page PDF downloaded from https://tf-pm.org/upload/1580737614108.pdf; SHA256 9c312c5e431e17dbb2c023599c6ed5857f8e91759229c5499df3c3de47fb7c29 matches audited cache. Original legacy URL returned403; ordinary web search located the official mirror. Publisher page states ©2012 The Authors and Creative Commons Attribution Non-commercial. Source diagrams are linked, not reproduced in this commercial academy; explanations are paraphrased, synthetic examples remain labelled.

  4. Market practice

    Business Process Model and Notation (BPMN) specification page ↗ — Object Management Group · BPMN 2.0.2 formal/2013-12-09 December 2013, actual §§2.2–2.3 and10.2.1/Table 10.1 printedpp145–146,10.9 pp308–309 read 7 November 2026 alongside previously read task/gateway/event sections: optional isExecutable, public restriction, modeling versus execution conformance. No current certification claim or source-art copy.

    BPMN 2.0.2 formal/2013-12-09, December 2013 cover; §§9.3–9.4,10.3,10.5–10.7 and13.4 opened/read6 November 2026. BPMN 2.0.2 formal/2013-12-09 December 2013, actual §§2.2–2.3 and10.2.1/Table 10.1 printedpp145–146,10.9 pp308–309 read 7 November 2026 alongside previously read task/gateway/event sections: optional isExecutable, public restriction, modeling versus execution conformance. No current certification claim or source-art copy. · Checked 2026-11-07

    Official public catalogue/PDF retrieved and the cited sections read. BPMN 2.0.2 formal/2013-12-09, December 2013 cover; §§9.3–9.4,10.3,10.5–10.7 and13.4 opened/read6 November 2026. Original educational paraphrase; no source artwork copied. Additional actual §§2.2–2.3,10.2.1/Table 10.1 and10.9 read 7 November 2026. Optional/public executable scope and separate modeling/execution conformance; source permission front matter read, no standard diagram copied.

  5. Market practice

    Decision Model and Notation1.6, formal/25-12-02 ↗ — Object Management Group · DMN 1.6 formal/25-12-02, actual §4.3 and5.1 overview read 7 November 2026 alongside prior selected §§6/8: decision requirements and decision logic, DRD and FEEL/boxed expressions beyond tables. Catalogue date and PDF cover Release Date:tbd kept distinct; no whole specification read claimed.

    §§6,8.2,8.2.11–8.2.12: dependencies, tables, hit policies and completeness. Catalogue reportsSeptember 2026; PDF cover leaves Release Date as tbd. Pin version/document identity; do not infer engine support. DMN 1.6 formal/25-12-02, actual §4.3 and5.1 overview read 7 November 2026 alongside prior selected §§6/8: decision requirements and decision logic, DRD and FEEL/boxed expressions beyond tables. Catalogue date and PDF cover Release Date:tbd kept distinct; no whole specification read claimed. · Checked 2026-11-07

    Primary public document opened and the cited material read on2026-11-06. Original educational paraphrase; no source figure copied. §§6,8.2,8.2.11–8.2.12: dependencies, tables, hit policies and completeness. Catalogue reportsSeptember 2026; PDF cover leaves Release Date as tbd. Pin version/document identity; do not infer engine support. Additional actual §4.3/5.1 read 7 November 2026: decision requirements/logic and boxed expressions beyond tables. Fresh PDF SHA256995743c39d3efee13375d837f3ddff815b72bba0534343a7c9186fb0298c00d0; catalogue date and cover tbd distinction preserved. No figure copied.

  6. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal · Daily List chores, invitation and welcome cases are synthetic. Missing artefact facts stay unknown; proposed data/rules/timers/control responses require approval. Five review lenses are a local checklist, not a complete engine contract. No automatic entitlement override, cheap-error, benefit or causal claim.

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: Daily List chores, invitation and welcome cases are synthetic. Missing artefact facts stay unknown; proposed data/rules/timers/control responses require approval. Five review lenses are a local checklist, not a complete engine contract. No automatic entitlement override, cheap-error, benefit or causal claim.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

  7. Market practice

    Timer events — Camunda 8 documentation, pinned source snapshot ↗ — Camunda · Camunda 8 docs Timer events, live page Version 8.10 read 7 November 2026; official repository commit cf3254e7593af78b19a59db6256f3e3dafdb08a2 timer-events.md, unchanged PNG and media-source BPMN inspected. Start/intermediate/interrupting boundary timers, asynchronous late-trigger caveat and illustrative empty timer definitions despite executable flag. Literal repository licence §§1–4/disclaimers read; version not invented.

    Camunda 8 docs Timer events, live page Version 8.10 read 7 November 2026; official repository commit cf3254e7593af78b19a59db6256f3e3dafdb08a2 timer-events.md, unchanged PNG and media-source BPMN inspected. Start/intermediate/interrupting boundary timers, asynchronous late-trigger caveat and illustrative empty timer definitions despite executable flag. Literal repository licence §§1–4/disclaimers read; version not invented. · Checked 2026-11-07

    Exact official public PNG matches repo commit cf3254e7593af78b19a59db6256f3e3dafdb08a2, SHA256 2a4575c3760f3be3bb9c264b504afb7b2a50e2ee2aa8e2a77a4490355ff96965. LICENSE.txt at that commit grants reproduction/collection/distribution under literal Attribution/ShareAlike terms with credit/licence link/notices and no endorsement/restrictive measures; no licence version asserted (GitHub SPDX NOASSERTION). Original PNG/fullcanvas unchanged, rendering XML illustration not deployable configuration. Rights scoped to source figure, not whole Payments Signal site.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.