Lean Six Sigma and the DMAIC cycle
Cut waste and cut variation, one step at a time. Learn Lean Six Sigma, the five DMAIC phases, how to use them on a high defect rate, and where a business analyst fits.
L1–L4 are part of the Pro pass
L0 Explain simply
Analogy: A baker investigating a sinking cake. A baker whose cakes sometimes sink should define the problem, measure it, investigate explanations, test an improvement and check the result over time. Finding a hot oven in one case does not make every sinking cake an oven problem.
combines attention to waste/flow with variation and defects. A defect is nonconformance to an agreed requirement, not every outcome someone dislikes. Removing a step can remove a necessary control; fewer steps do not automatically mean fewer defects.
means Define, Measure, Analyse, Improve and Control. The phases organise evidence and action for an existing process. They do not guarantee a permanent cure or prohibit urgent containment while analysis continues. New designs or major redesign can need other approaches, including DMADV (define, measure, analyse, design, verify).
In the synthetic Daily List case, some due reminders do not appear. Sam the analyst first distinguishes intended notifications, legitimate suppression and observed failures. A user who intentionally disabled notifications is not automatically a defective user or a product defect. Clarify the need, eligibility and supported conditions before claiming a failure rate.
The analogy is limited: real services involve interacting systems, permissions, different users and uncertainty, not one oven dial.
PICTURE IT
The picture is the one the lesson above opens with. The table below shows how each part of it matches the work.
THE REAL JOB The picture helps a newcomer remember that improvement follows an order: count, find the cause, fix, then keep watching.
- Define
- Measure
- Analyse
- Improve
- Control
HOW THE PICTURE MAPS
| In the picture | In the work |
|---|---|
| A cake that sometimes sinks | A defect in a process |
| Counting how often it sinks | Measure, the baseline |
| Testing whether oven heat contributes | Analyse: investigate a causal hypothesis |
| Testing an oven adjustment | Improve |
| Checking later bakes with a plan | Control |
WHERE THIS PICTURE STOPS
- A baking example has local controls; real processes can have interacting factors.
- Visible cake height alone does not establish all aspects of quality.
- The example does not decide how many owners or teams a real improvement needs.
HOOK
Name it, count it, find it, fix it, keep it.
REMEMBER IT THIS WAY
A sequence: the real steps, in order.
: Define, Measure, Analyse, Improve, Control. Count before you fix, then keep checking every bake after the oven is fixed.
| In the trick | What it stands for |
|---|---|
| D | Define the defect in a process, a cake that sometimes sinks |
| M | Measure, counting how often it sinks |
| A | Analyse, finding the oven runs hot |
| I | Improve, fixing the oven |
| C | Control |
TELL A FRIEND
Define, Measure, Analyse, Improve, Control organise evidence and action. Agree eligibility and defects, investigate mechanisms, test changes and maintain owned reaction plans; monitoring is not a permanent cure guarantee.
OFTEN MIXED UP WITH Process improvement: waste and bottlenecks. That topic finds waste and delays in a process. This one adds the steps to cut variation and keep in place.
Sources & standards — 1 source
- Market practice
DMAIC — actual publisher procedure ↗ — American Society for Quality · ASQ, DMAIC, actual publisher phases, measurement validation, solution evaluation/testing, long-term control/reaction plans and DMAIC/DMADV distinction read 6 November 2026. Independent Daily List counts require explicit eligibility and requirements; raw nonappearance is not automatically a defect. No source art reproduced or causal/sustainability guarantee inferred.
Synthetic counts distinguish raw nonappearance, eligible defects and intentional suppression. No image reproduced.
PRACTISE AND KEEP
Sources for this topic — 15 sources
- Market practice
The define, measure, analyse, improve and control process (American Society for Quality) ↗ — American Society for Quality · The define, measure, analyse, improve and control process (American Society for Quality): define, measure, analyse, improve and control as a structured way to improve an existing process; define sets the problem, goals and customers; measure collects data on current performance (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Lean vs Six Sigma (Fabrico blog) ↗ — Fabrico · Lean vs Six Sigma (Fabrico blog): lean targets waste and Six Sigma targets variation and defects; the two work together (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Define, Measure, Analyze, Improve and Control research starter (EBSCO) ↗ — EBSCO · Define, Measure, Analyze, Improve and Control research starter (EBSCO): DMAIC and its link to the Six Sigma method (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Simplified educational illustration
Payments Signal editorial teaching models — Payments Signal
What this simplifies: Daily List, its reminders, the counts and the people are invented. Real Six Sigma projects use more statistics, such as sample sizes and control charts with calculated limits, than this lesson shows. Belt levels and the famous defects-per-million goal are not covered, because the sources we read did not settle them for this lesson.
Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.
- Market practice
Pareto Analysis Using the Pareto Principle (20/80 rule) ↗ — Visual Paradigm · Pareto chart/80-20 as a quality tool; guides stress the ratio is approximate. The strategy lesson already names the chart. (search excerpt, page not opened).
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
PDCA cycle ↗ — ASQ · PDCA as a four-step repeated improvement cycle (ASQ, opening excerpt only; step details from other pages). (search excerpt, page not opened).
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
A3 report ↗ — Lean Enterprise Institute · A3 problem solving (search excerpt, page not opened).
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Cost of quality (ASQ quality resources) ↗ — American Society for Quality · Cost of poor quality (ASQ cost of quality) (search excerpt, page not opened).
Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Check Sheet; Control Chart ↗ — American Society for Quality (ASQ) · ASQ: a check sheet is a simple data recording tool, a list of problems with tally marks of occurrences. (search excerpt, page not opened).
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
DMAIC — actual publisher procedure ↗ — American Society for Quality · ASQ, DMAIC, actual publisher phases, measurement validation, solution evaluation/testing, long-term control/reaction plans and DMAIC/DMADV distinction read 6 November 2026. Independent Daily List counts require explicit eligibility and requirements; raw nonappearance is not automatically a defect. No source art reproduced or causal/sustainability guarantee inferred.
Synthetic counts distinguish raw nonappearance, eligible defects and intentional suppression. No image reproduced.
- Market practice
Proportions Control Charts — e-Handbook §6.3.3.2 ↗ — NIST/SEMATECH · NIST/SEMATECH e-Handbook §6.3.3.2, Proportions Control Charts, actual definitions, binomial/independence/stability assumptions, 3-sigma equations and 30-wafer×50-chip dataset/chart read. Publisher DAT independently reproduces center .2313/UCL .4102/LCL .0524. Target differs from control limits. Visible equations say 3; HTML ALT says 2 incorrectly. The publisher wafer case is distinct from course reminders.
Actual original 400×245 GIF/table/equations pixel-inspected. All 30 DATvalues sum 6.94 and reproduce .2313/.4102/.0524. Visible equations use 3 sigma; their HTML ALT incorrectly says 2. NIST non-SRD worldwide reuse/attribution terms read at /open/license; no third-party credit on this case. The independent wafer data is not a reminder target or app result.
- Market practice
Control Chart — actual publisher explanation ↗ — American Society for Quality · ASQ, Control Chart, actual publisher definition/procedure read: limits derived from process data, appropriate chart selection, common/special-cause variation and nonrandom patterns beyond isolated outside points. A business target is not an estimated control limit; an in-control process may fail its target. Publisher chart not reproduced.
Original publisher chart privately viewed in source audit; no reuse grant established, link-only.
- Market practice
A3 Report — method and ownership ↗ — Lean Enterprise Institute · Lean Enterprise Institute, A3 Report, actual introductory method/ownership sections read 6 November 2026: Toyota-pioneered summary of problem, analysis, countermeasures and plan; dialogue and author-owner responsibility, more than a template. No example sheet reproduced.
No publisher example reproduced and no blanket reuse licence assumed.
- Market practice
Plan-Do-Check-Act Cycle — actual procedure ↗ — American Society for Quality · ASQ, Plan-Do-Check-Act Cycle, actual definition and procedure read 6 November 2026: plan, small-scale test, review learning and act/iterate. Related improvement approach, not identical phase names to DMAIC. No source diagram copied.
No source diagram copied; source graphics would need their own review/rights decision.
- Market practice
Cost of Quality — prevention, appraisal and failures ↗ — American Society for Quality · ASQ, Cost of Quality, actual prevention, appraisal and internal/external failure sections read 6 November 2026. Cost of quality includes prevention/appraisal/failures; poor-quality costs concern failures. More prevention spend is not automatically the optimum. No source image copied.
No claim that increased prevention expenditure always optimises cost, and no source image copied.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.