TOPIC 20/4412 MINNOT STARTED

Versions, baselines and sign-off

Everyone must point at the same copy. Learn how version numbers, a frozen baseline and a recorded sign-off keep a team on one page while change still goes through control.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: A contract draft. A contract draft has a version number at the top. The signed copy is the one everyone points to. If two people argue, they open the signed copy and read it.

Sam is a , the person who finds out what people need. Sam works on Daily List, a to-do list app. Sam has written the sharing specification, a page that says how sharing a list works. Leo, the developer, and Tom, the tester, both work from it. Last week they each had a different copy.

So Sam starts to number the copies. A version is a numbered state of a document. The first full draft is version 0.9. Edits make 0.91, 0.92 and so on, so everyone can say which copy they mean.

Sam prepares version 1.0 for approval. When Nina, the who decides what the team builds next, reads that exact version and says yes, Sam records its identity, her authority and the date. That recorded agreement is a sign-off. It comes from the person who has the right to give it.

Sam then freezes version 1.0 as the baseline: a version agreed as the reference point for future change. Later edits are labelled 1.1.

A signed contract commits both sides. A baseline can still change, but only through .

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the work.

THE REAL JOB Versions, a baseline and a recorded sign-off keep a team pointing at one agreed copy while change still goes through control.

  1. Choose numbers
  2. Mark the page
  3. Get the sign-off
  4. Freeze the baseline
  5. Change by control
The signed copy

HOW THE PICTURE MAPS

How each part of the picture matches the work
In the pictureIn the work
A number on each draft of a contractA version
The signed copy everyone points toA baseline
The signature with a name and a dateA sign-off
A change slipped in after signingA change outside control
A signed amendment with a new numberA new version after a controlled change

WHERE THIS PICTURE STOPS

  • A signed contract binds the people who signed. A baseline can still change through control.
  • A contract is a legal paper. A sign-off here is a team record.
  • A contract is signed once. A requirements page may have several baselines over time.

HOOK

Number it, sign it, freeze it.

REMEMBER IT THIS WAY

A contrast: two neighbours told apart by one test.

The version says which copy it is. The sign-off says who agreed, and the baseline is the copy we open in an argument.

What each part of the trick stands for
In the trickWhat it stands for
Versiona numbered state of a document
Sign-offrecorded agreement from the person who has the right
Baselinea version agreed as the reference point

TELL A FRIEND

Give each copy of a page a version number. When the right person signs it off, freeze it as the baseline, and change it later only through control.

OFTEN MIXED UP WITH Change control and impact analysis. That topic decides whether to accept a change. This one says what the team points at before and after .

Sources & standards — 1 source
  1. Market practice

    Certified Professional for Requirements Engineering (CPRE) Foundation Level syllabus, English, version 3.3.0 (International Requirements Engineering Board) ↗ — International Requirements Engineering Board (IREB) · Opened CPRE Foundation Level syllabus3.3.0,1April2026, §§3.1–3.8 and6.2–6.7: work products, quality, attributes, versions, configurations/baselines, traceability and change; original educational examples are not universal mandatory templates.

    CPRE Foundation Level syllabus3.3.0,1April2026, §§3.7 and4.1–4.4: prototype purposes, sources, technique families, quality needs/constraints, conflict methods and validation. · Checked 2026-11-06

    Primary versioned PDF opened via normal web tool and downloaded/extracted on2026-11-06. Copyright authors and IREB e.V.; original educational paraphrase with attribution. No source artwork copied.

PRACTISE AND KEEP

Sources for this topic — 12 sources
  1. Market practice

    The Business Analysis Standard ↗ — International Institute of Business Analysis · The Business Analysis Standard (v2.0), task level: a task about keeping requirements current and managed through change, including the version a team works from (search excerpt of the IIBA task card, page not opened; exact task wording not confirmed in this batch)

    IIBA's free statement of what business analysis is: the Business Analysis Core Concept Model and its six core concepts, the distinction between a requirement and a design, and the requirements classification schema. It names the six knowledge areas and the thirty tasks under them, and illustrates those tasks, while referring the reader to BABOK for their detail.

    Used here for the BA-technique questions a Payments Business Analyst and a Payments Product Manager are asked — at task level. The task list is the same thirty as BABOK v3, so a task-level claim is citable to it. Read update7November2026: Actual official Business Analysis Standard v2.0(2025) taskcards Assess Requirement and Design Changes printedp36 and Define Change Strategy p41 read7November2026: proposed impacts/recommendations, current-to-future options and transitions. No universal readiness template or full BABOK claimed read. · Checked 2026-08-25

    A free PDF of the same Standard (v2.0) is published at https://www.iiba.org/knowledgehub/the-business-analysis-standard.pdf. Re-checked 2026-08-25: the Knowledge Hub HTML URL above remains the live canonical page; do not replace it with a third-party mirror.

    What it does not carry: the technique catalogue. BABOK v3's 50 techniques live in BABOK v3 only, which is behind IIBA membership (ISBN 9781927584026). A question naming a technique needs the book, verified by a person holding it, or should be rewritten to ask about the task instead.

    And it does not carry the knowledge areas either. The Standard's own section 5.3 says it "intentionally does not include information on the knowledge areas defined in the Business Analysis Body of Knowledge", and refers the reader to BABOK for them. It names the six and links out to each, and it illustrates the 30 tasks, but the detail sits in BABOK. Cite this entry at task level, not at knowledge-area level.

    Current edition is v2.0, a 2025 refresh of roughly 60 pages. The often-quoted "June 2023, 110 pages" describes a different object — the print edition, ISBN 9781927584378, of the earlier text. Welding one object's version to another's date is the error this paragraph exists to prevent.

    Free to read is not open: the document is "All rights reserved". Cite and rewording; do not reproduce at length.

    One naming difference worth knowing when comparing against BABOK: the Standard calls knowledge area C "Requirements and Designs Life Cycle Management" where BABOK says "Requirements Life Cycle Management". Both forms were read on the page on the access date, the first in the Standard's own explore section and the second in the BABOK contents beside it.

    A dead address, corrected. The registered URL sat under /business-analysis-body-of-knowledge/, a path IIBA has retired; that path and its parent both answer HTTP 404. The Standard is published under /knowledgehub/ at the address above.

    The previous note said iiba.org could not be fetched, that roughly thirty candidate mirrors were each refused, and that nothing in the entry was a page-read of an IIBA document. That is withdrawn. The publisher's own page was read directly at HTTP 200 on the access date, and the claims above are checked against it. Read update7November2026: actual selected source scope above now inspected; previous broader/excerpt-only notes remain history and are not extended to unread sections.

  2. Market practice

    Requirements baseline posts (software company blog) ↗ — ONES · ONES vendor blog posts on requirements baselines and approval: a baseline is an approved, versioned set of requirements used as a fixed reference; sign-off is explicit and recorded; later changes go through change control (search excerpt, page not opened)

    Vendor blog posts. Describe a baseline as an approved, versioned reference set, sign-off as explicit and recorded, and later changes going through change control. Practitioner guidance, not a standard. Title is descriptive; confirm when opened. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  3. Market practice

    ISTQB Certified Tester Foundation Level Syllabus v4.0.1 ↗ — International Software Testing Qualifications Board · ISTQB Certified Tester Foundation Level Syllabus v4.0.1, static testing and review types: work products are kept under version control so that tests match the right version (confirmed against the syllabus, read in full text from a mirror copy of the publisher PDF, v4.0.1, 15 September 2024)

    The examinable statement of what a foundation-level tester is expected to know: six chapters, 64 learning objectives, each tagged K1 Remember, K2 Understand or K3 Apply, plus the test-design techniques the qualification names and groups as black-box, white-box and experience-based.

    Used here for the test-craft questions a Payment Quality Assurance Analyst and a Production Support Analyst are asked. It is cited for what the syllabus says a tester must be able to do, never as a rule about how payments work. · Checked 2026-11-07

    v4.0.1 is dated 15 September 2024 and is a list of corrections to v4.0 (21 April 2023) that reworded six learning objectives — not a cosmetic reissue. 78 pages.

    Two traps this entry exists to stop. v4.0.2 is the German edition (1 March 2025, 94 pages), so sorting by version number reaches the wrong document. And the widely-repeated per-chapter question allocation "8 / 5 / 4 / 11 / 9 / 3" is wrong: it is 8 / 6 / 4 / 11 / 9 / 2, derived from three official sample-exam answer keys and confirmed against the Exam Structure Tables.

    The single most consequential detail for a question bank: white-box coverage — statement and branch — is K2 "Explain", not K3 "Apply" (FL-4.3.1, FL-4.3.2, FL-4.3.3), and MC/DC, path and condition coverage are declared out of scope in §4.3. A question asking a candidate to compute branch coverage is testing something this syllabus does not.

    Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.

    Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.

    Read from two independent PDF-to-markdown conversions mirrored on raw.githubusercontent.com. They are treated as faithful because they were produced by unrelated parties with different tooling, agree on the full 64-item objective set including wording, and reproduce the same internal inconsistency present in the source PDF. Chapter 1 reads "testware that supports" where Appendix B reads "that support". A conversion artefact does not replicate across two toolchains.

    The licence permits attributed non-commercial extracts and use as the basis for articles. Whether a site that sells a pass may rely on that is an owner's decision, not this entry's.

    7 November 2026 review: actual publisher PDF 4.0.1, 15 September 2024, 78 pages, front matter/copyright and relevant numbered operative sections 0.5–0.10 and chapters 1–6 compared with CTFLpractice lessons. Earlier mirror/search descriptions are historical access records. TheK2 white-box objectives require explanation; the source does not justify a categorical ban on small numeric illustrations that support explanation. Later Exam Rules 1.2§4.1.4 usesK2 for keyword definitions, while syllabus§0.5 usesK1; keep dated scopes distinct. No copied questions or figure assets.

  4. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: The Daily List app and its people are invented for teaching. Teams number versions in different ways, and agile teams may keep a lighter baseline. A sign-off here is a team record, not a legal contract.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

  5. Market practice

    How to get meaningful sign-off on requirements ↗ — Bridging the Gap · Bridging the Gap warns against sign-off on unread documents; the PM template records who approved which areas.

    Warns against asking for sign-off on a document the stakeholders have not read or understood. · Checked 2026-10-19

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  6. Market practice

    Business Requirements Document: customer/client sign-off template ↗ — ProjectManagement.com · Bridging the Gap warns against sign-off on unread documents; the PM template records who approved which areas.

    Records who reviewed and approved which areas, since large projects rarely need every approver on everything. · Checked 2026-10-19

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  7. Market practice

    PMI-PBA mapping to EBG resources (EBG Consulting, 2014) ↗ — EBG Consulting · 2014 mapping of the 2013 PMI-PBA outline: allocate accepted or deferred requirements by balancing scope, schedule, budget and resource limits with value, using prioritisation, dependency analysis and decision-making tools, to create a baseline; then obtain sign-off on the baseline (search excerpt, page not opened)

    A 2014 mapping of the domains and tasks of the 2013 PMI-PBA outline to the firm's books. Search excerpts give task wording for Domain 3. The tasks are to draw out, and to analyse and decompose. Others are to evaluate options as accepted, deferred or rejected, and to allocate accepted or deferred requirements against scope, schedule, budget and resource limits to create a baseline. The rest are sign-off on the baseline, writing specifications, validating requirements, and setting detailed metrics and acceptance criteria.

    They give three tasks of Domain 4 (update status, communicate status to the project manager and stakeholders, manage changes). They also give the four tasks of Domain 5. Secondary to PMI and dated 2013. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  8. Market practice

    Concepts in configuration management systems (lecture slides, University of Houston-Clear Lake) ↗ — University of Houston-Clear Lake · Lecture slides: identification, baselines, change control through a board, and status accounting (search excerpt, page not opened)

    Lecture slides. Search excerpts describe configuration identification, baselines, change control through a board that approves changes to a baseline, and status accounting. Used for the four basic jobs of configuration management. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  9. Market practice

    Configuration status accounting report: data item description (Australian Department of Defence) ↗ — Australian Department of Defence · Data item description: a status accounting report describes the status of changes to configuration items (search excerpt, page not opened)

    Government data item descriptions. A search excerpt says a configuration status accounting report describes the status of changes to configuration items and their documentation. Used for the status-record job of configuration management. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  10. Market practice

    IQBBA Certified Foundation Level Business Analyst (CFLBA) syllabus (copy hosted by ASTQB) ↗ — International Qualification Board for Business Analysis (IQBBA), copy hosted by ASTQB · Version 3.0, 1 January 2018: chapter 4 is requirements engineering, with section 4.3 on requirements management including traceability and configuration management (search excerpt, page not opened)

    Syllabus copy hosted by the American Software Testing Qualifications Board (ASTQB): version 3.0, dated 1 January 2018 on the cover. Other hosts (the Global Association for Software Quality, and iSQI) carry the same version. Chapter 4 is requirements engineering in business analysis; see rq-gasq-iqbba-cflba-syllabus-v30 for its sections and levels. The earlier doubt about a different chapter name came from a training provider's own ten-chapter outline, which is not the syllabus. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  11. Market practice

    Certified Business Analyst Foundation Level syllabus, version 3.0 (International Qualification Board for Business Analysis, IQBBA; copy hosted by the Global Association for Software Quality, GASQ) ↗ — International Qualification Board for Business Analysis (IQBBA), copy hosted by the Global Association for Software Quality (GASQ) · Syllabus 3.0, 2018, contents: chapter 4 Requirements Engineering in Business Analysis (apply level), with 4.3 Requirements Management covering information architecture, traceability and configuration management; version control and change requests are described in the section text (search excerpt, page not opened)

    Cover reads version 2018 (dated 1 January 2018). Five chapters: fundamentals of business analysis, strategy definition, management of the business analysis process, requirements engineering in business analysis (chapter 4, apply level), and solution evaluation and optimisation. Chapter 4 sections: 4.1 introduction. 4.2 requirements development (elicitation; analysis and modelling; specification; verification and validation).

    4.3 requirements management (4.3.1 introduction at know level, 4.3.2 information architecture at apply level, traceability at apply level, configuration management listed at understand level in the German contents list, scope management), and tools and techniques. Section text says work products are configuration items that are baselined and controlled, change management is a part of configuration management, and key artifacts stay under version control. A French edition (version 1.1) numbers some topics differently and gives configuration management a different level. · Checked 2026-10-25

    Seen as a WebSearch excerpt on the access date; the page was not opened (search excerpt, page not opened). Put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  12. Market practice

    Certified Professional for Requirements Engineering (CPRE) Foundation Level syllabus, English, version 3.3.0 (International Requirements Engineering Board) ↗ — International Requirements Engineering Board (IREB) · Opened CPRE Foundation Level syllabus3.3.0,1April2026, §§3.1–3.8 and6.2–6.7: work products, quality, attributes, versions, configurations/baselines, traceability and change; original educational examples are not universal mandatory templates.

    CPRE Foundation Level syllabus3.3.0,1April2026, §§3.7 and4.1–4.4: prototype purposes, sources, technique families, quality needs/constraints, conflict methods and validation. · Checked 2026-11-06

    Primary versioned PDF opened via normal web tool and downloaded/extracted on2026-11-06. Copyright authors and IREB e.V.; original educational paraphrase with attribution. No source artwork copied.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.