TOPIC 34/4515 MINNOT STARTED

Stakeholders who will not review, attend, read or sign

When a stakeholder will not review, attend, read or sign: ask what blocks them, review live, check who approves, set kind deadlines, record risk.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: The friend who never answers the holiday chat. You plan a trip with friends. One friend never replies in the chat. You do not give up, and you do not book everything without a word. You ask what is holding them back. You show the plan face to face. You give a kind deadline. If nothing comes, you book the flexible option and tell them so.

Sam, the for Daily List, has the same problem at work. Nina, the , has not opened the requirements page. A requirement is something the product must do. Lily, a user, keeps missing the sessions. Leo, the developer, keeps a technical limit to himself.

Sam first looks for the , which is the real reason a person has not yet reviewed, attended or signed, found by asking them. It could be time, a page that is hard to read, doubt about what is wanted, or worry about blame.

Sam makes each ask small and clear. He offers a live review in place of a long email. He checks with an (A table that says, for each item, who may approve it, who is only asked to comment and who is told). This is a table that says, for each item, who may approve it, who is only asked to comment and who is told. He sets a deadline with care.

If a key approval still does not come, Sam may use (Carrying on with work before an approval arrives, with the risk and the deadline written down and accepted). That means carrying on with work before an approval arrives. The risk and the deadline are written down. Someone who has the right to accept them accepts them.

The picture has a limit. A friend can be left out of a trip. A work approver cannot be skipped by habit, and silence is not a yes.

Proceeding at risk means a bounded, explicitly authorised activity with its assumptions, expiry/review point and consequences recorded. It cannot substitute for mandatory legal, contractual, security or other approval. Silence is not consent, and a no-reply convention does not override an applicable obligation. Tailor reminder/escalation timing to the risk and authority rather than treating one reminder as a universal rule.

PLAIN WORDS · 2 in this section
expiry
the date after which something stops being valid
escalation
passing a case up to a senior or expert person

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the work.

THE REAL JOB The picture shows that a quiet person needs a question, a live look and a kind deadline, and a recorded choice beats a guess.

  1. Ask what blocks
  2. Review live
  3. Check who signs
  4. Set a kind deadline
  5. Record the risk
From a quiet stakeholder to a recorded choice

HOW THE PICTURE MAPS

How each part of the picture matches the work
In the pictureIn the work
Asking the friend what is holding them backFinding the review blocker
Showing the plan face to faceA live review
Knowing who actually pays for the roomThe approval matrix
A kind deadline for answersA deadline set with care
Booking the flexible roomProceeding at risk

WHERE THIS PICTURE STOPS

  • A friend can be left out of a trip, but a work approver cannot be skipped by habit.
  • A flexible room costs little, while work done at risk can be costly.
  • Friends forgive silence easily, but a project needs a written record.
  • A bounded authorised at-risk activity cannot substitute for mandatory approvals. Silence is not consent; a no-reply convention does not waive obligations.

HOOK

Ask, show, check who signs, then record the risk.

REMEMBER IT THIS WAY

A sequence: the real steps, in order.

When replies stop, find the blocker, meet in person, check who signs, then log the risk.

What each part of the trick stands for
In the trickWhat it stands for
Asking the friend what is holding them backFinding the review blocker
Showing the plan face to faceA live review
Knowing who actually pays for the roomThe approval matrix

TELL A FRIEND

When someone goes quiet, ask what is in the way, review live and check who really needs to approve. If a key approval is late, a person with authority can accept the risk in writing.

OFTEN MIXED UP WITH Versions, baselines and sign-off. That topic explains what a baseline and a sign-off are. This one covers what to do when the person who should sign will not engage.

Sources & standards — 1 source
  1. Market practice

    The Business Analysis Standard ↗ — International Institute of Business Analysis · Actual Business Analysis Standard v2.0, ©2025: planning/governance/information/performance pp 23–27, confirmation/communication/collaboration pp 30–32, and solution evaluation pp 48–52. Tailor authority, evidence and measures; synthetic cases are independent examples.

    IIBA's free statement of what business analysis is: the Business Analysis Core Concept Model and its six core concepts, the distinction between a requirement and a design, and the requirements classification schema. It names the six knowledge areas and the thirty tasks under them, and illustrates those tasks, while referring the reader to BABOK for their detail.

    Used here for the BA-technique questions a Payments Business Analyst and a Payments Product Manager are asked — at task level. The task list is the same thirty as BABOK v3, so a task-level claim is citable to it. Read update7November2026: Actual official Business Analysis Standard v2.0(2025) taskcards Assess Requirement and Design Changes printedp36 and Define Change Strategy p41 read7November2026: proposed impacts/recommendations, current-to-future options and transitions. No universal readiness template or full BABOK claimed read. · Checked 2026-08-25

    A free PDF of the same Standard (v2.0) is published at https://www.iiba.org/knowledgehub/the-business-analysis-standard.pdf. Re-checked 2026-08-25: the Knowledge Hub HTML URL above remains the live canonical page; do not replace it with a third-party mirror.

    What it does not carry: the technique catalogue. BABOK v3's 50 techniques live in BABOK v3 only, which is behind IIBA membership (ISBN 9781927584026). A question naming a technique needs the book, verified by a person holding it, or should be rewritten to ask about the task instead.

    And it does not carry the knowledge areas either. The Standard's own section 5.3 says it "intentionally does not include information on the knowledge areas defined in the Business Analysis Body of Knowledge", and refers the reader to BABOK for them. It names the six and links out to each, and it illustrates the 30 tasks, but the detail sits in BABOK. Cite this entry at task level, not at knowledge-area level.

    Current edition is v2.0, a 2025 refresh of roughly 60 pages. The often-quoted "June 2023, 110 pages" describes a different object — the print edition, ISBN 9781927584378, of the earlier text. Welding one object's version to another's date is the error this paragraph exists to prevent.

    Free to read is not open: the document is "All rights reserved". Cite and rewording; do not reproduce at length.

    One naming difference worth knowing when comparing against BABOK: the Standard calls knowledge area C "Requirements and Designs Life Cycle Management" where BABOK says "Requirements Life Cycle Management". Both forms were read on the page on the access date, the first in the Standard's own explore section and the second in the BABOK contents beside it.

    A dead address, corrected. The registered URL sat under /business-analysis-body-of-knowledge/, a path IIBA has retired; that path and its parent both answer HTTP 404. The Standard is published under /knowledgehub/ at the address above.

    The previous note said iiba.org could not be fetched, that roughly thirty candidate mirrors were each refused, and that nothing in the entry was a page-read of an IIBA document. That is withdrawn. The publisher's own page was read directly at HTTP 200 on the access date, and the claims above are checked against it. Read update7November2026: actual selected source scope above now inspected; previous broader/excerpt-only notes remain history and are not extended to unread sections.

PRACTISE AND KEEP

Sources for this topic — 12 sources
  1. Market practice

    How do you handle unresponsive key project stakeholders? (ProjectManagement.com) ↗ — ProjectManagement.com · How do you handle unresponsive key project stakeholders? (ProjectManagement.com): advises finding the cause, following up directly and escalating through the sponsor if needed (registry source; page not opened in this batch)

    Community blog. Advises finding the cause, following up directly and escalating through the sponsor if needed. Search excerpt only. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  2. Market practice

    How to get the information you need from your stakeholders (Bridging the Gap) ↗ — Bridging the Gap · How to get the information you need from your stakeholders (Bridging the Gap): suggests clear, methodical requests so that analysts can be proactive without being pushy (registry source; page not opened in this batch)

    Training blog. Suggests clear, methodical requests so that analysts can be proactive without being pushy. Search excerpt only. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  3. Market practice

    Stakeholder Walkthroughs That Reveal Hidden Issues (Visual Paradigm article) ↗ — Visual Paradigm · Stakeholder Walkthroughs That Reveal Hidden Issues (Visual Paradigm article): says walkthroughs are collaborative tests that surface gaps, not presentations (registry source; page not opened in this batch)

    Vendor article. Walkthroughs are collaborative tests that surface gaps, not presentations. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  4. Market practice

    Bearer of bad news (Project Management Institute) ↗ — Project Management Institute · Bearer of bad news (Project Management Institute): warns that repeated surprises cost a sponsor's trust and that problems should be raised early (registry source; page not opened in this batch)

    Article. Warns that repeated surprises cost a sponsor's trust and that problems should be raised early. Search excerpt only. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  5. Market practice

    How do I request feedback on a requirements document without sounding too demanding? (Bridging the Gap) ↗ — Bridging the Gap · How do I request feedback on a requirements document without sounding too demanding? (Bridging the Gap): suggests saying what you need and when, getting a committed date, and holding a review meeting when a stakeholder does not know how to respond (search excerpt, page not opened)

    Training-company answer. Suggests saying what you need and when, getting a committed date, and holding a review meeting when a stakeholder does not know how to respond. Search excerpt only. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  6. Market practice

    How do I get my stakeholders to come to my meetings? (Bridging the Gap) ↗ — Bridging the Gap · How do I get my stakeholders to come to my meetings? (Bridging the Gap): suggests stating what you need from each person, inviting only the people who are needed and using the sponsor's backing (search excerpt, page not opened)

    Training-company answer. Suggests stating what you need from each person, inviting only the people who are needed, and using the sponsor's backing. Search excerpt only. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  7. Market practice

    Why stakeholders do not read requirements (Corporate Education Group) ↗ — Corporate Education Group · Why stakeholders do not read requirements (Corporate Education Group): says people are busy, long text is hard to picture, and a live walkthrough often works better than an emailed document (search excerpt, page not opened)

    Training article. Says people are busy, long text is hard to picture, and a live walkthrough often works better than an emailed document. Search excerpt only. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  8. Market practice

    How to get meaningful sign-off on requirements (Bridging the Gap) ↗ — Bridging the Gap · How to get meaningful sign-off on requirements (Bridging the Gap): advises against asking for sign-off on a document that the person has not read or does not understand (search excerpt, page not opened)

    Training article. Advises against asking for sign-off on a document that the person has not read or does not understand, and suggests saying which approval is sought. Search excerpt only. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  9. Market practice

    How important is it to get signature sign-off on requirements before proceeding? (ProjectManagement.com discussion) ↗ — ProjectManagement.com · How important is it to get signature sign-off on requirements before proceeding? (ProjectManagement.com discussion): one practitioner describes a notice that no reply by a date implies acceptance, and names the risks of relying on it (search excerpt, page not opened)

    Community discussion. One practitioner describes a notice saying that no reply by a date implies acceptance, and the risks of relying on it. Search excerpt only. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  10. Market practice

    Engaging stakeholders in elicitation and collaboration (International Institute of Business Analysis article) ↗ — International Institute of Business Analysis · Engaging stakeholders in elicitation and collaboration (International Institute of Business Analysis article): links weak participation to unclear change processes and to people not seeing how a change touches their own work (search excerpt, page not opened)

    Professional-body article. Links weak stakeholder participation to unclear change processes and to people not seeing how a change touches their own work. Search excerpt only. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  11. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: Daily List, Sam, Nina, Leo, Lily, Tom and Mei are invented. The eight-step order is this academy’s practice summary, informed by reviewed IIBA collaboration and governance guidance. Silence alone is not approval; contractual and organisational authority still applies.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

  12. Market practice

    The Business Analysis Standard ↗ — International Institute of Business Analysis · Actual Business Analysis Standard v2.0, ©2025: planning/governance/information/performance pp 23–27, confirmation/communication/collaboration pp 30–32, and solution evaluation pp 48–52. Tailor authority, evidence and measures; synthetic cases are independent examples.

    IIBA's free statement of what business analysis is: the Business Analysis Core Concept Model and its six core concepts, the distinction between a requirement and a design, and the requirements classification schema. It names the six knowledge areas and the thirty tasks under them, and illustrates those tasks, while referring the reader to BABOK for their detail.

    Used here for the BA-technique questions a Payments Business Analyst and a Payments Product Manager are asked — at task level. The task list is the same thirty as BABOK v3, so a task-level claim is citable to it. Read update7November2026: Actual official Business Analysis Standard v2.0(2025) taskcards Assess Requirement and Design Changes printedp36 and Define Change Strategy p41 read7November2026: proposed impacts/recommendations, current-to-future options and transitions. No universal readiness template or full BABOK claimed read. · Checked 2026-08-25

    A free PDF of the same Standard (v2.0) is published at https://www.iiba.org/knowledgehub/the-business-analysis-standard.pdf. Re-checked 2026-08-25: the Knowledge Hub HTML URL above remains the live canonical page; do not replace it with a third-party mirror.

    What it does not carry: the technique catalogue. BABOK v3's 50 techniques live in BABOK v3 only, which is behind IIBA membership (ISBN 9781927584026). A question naming a technique needs the book, verified by a person holding it, or should be rewritten to ask about the task instead.

    And it does not carry the knowledge areas either. The Standard's own section 5.3 says it "intentionally does not include information on the knowledge areas defined in the Business Analysis Body of Knowledge", and refers the reader to BABOK for them. It names the six and links out to each, and it illustrates the 30 tasks, but the detail sits in BABOK. Cite this entry at task level, not at knowledge-area level.

    Current edition is v2.0, a 2025 refresh of roughly 60 pages. The often-quoted "June 2023, 110 pages" describes a different object — the print edition, ISBN 9781927584378, of the earlier text. Welding one object's version to another's date is the error this paragraph exists to prevent.

    Free to read is not open: the document is "All rights reserved". Cite and rewording; do not reproduce at length.

    One naming difference worth knowing when comparing against BABOK: the Standard calls knowledge area C "Requirements and Designs Life Cycle Management" where BABOK says "Requirements Life Cycle Management". Both forms were read on the page on the access date, the first in the Standard's own explore section and the second in the BABOK contents beside it.

    A dead address, corrected. The registered URL sat under /business-analysis-body-of-knowledge/, a path IIBA has retired; that path and its parent both answer HTTP 404. The Standard is published under /knowledgehub/ at the address above.

    The previous note said iiba.org could not be fetched, that roughly thirty candidate mirrors were each refused, and that nothing in the entry was a page-read of an IIBA document. That is withdrawn. The publisher's own page was read directly at HTTP 200 on the access date, and the claims above are checked against it. Read update7November2026: actual selected source scope above now inspected; previous broader/excerpt-only notes remain history and are not extended to unread sections.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.