Definition of Ready and Definition of Done
Two short lists the team agrees together: when a story is clear enough to start, and when work is truly finished. Learn what goes on each list and how not to let them grow heavy.
L1–L4 are part of the Pro pass
L0 Explain simply
Analogy: A kitchen checklist. A kitchen needs the ingredients ready before cooking starts. It also has a list for the end: plated, tasted, table cleaned. The list at the start stops a cook from stopping halfway to find eggs. The list at the end stops a cook from calling a dish done when it is cold.
Sam is a , the person who finds out what people need. Sam works on Daily List, a to-do list app. The team has had two problems. Some stories start before anyone knows what they mean. Some stories are called done while a check is still missing.
Sam gathers Tom, the tester, Leo, the developer, and Nina, the , who decides what the team builds next. Together they agree two short lists.
The first is the : the team's agreed checks that a story is clear enough to start. For Daily List it says a story has and a mock-up. Acceptance criteria are the conditions that show a story is finished. A mock-up is a rough drawing of the screen.
The second is the : in Scrum, a formal description of the quality state required of the Increment, the usable product addition. Code being written or Nina seeing a demonstration is not enough by itself. The shared quality requirements must be met.
The Definition of Done is required in Scrum. A team may also adopt an optional readiness agreement; it should help discussion rather than impose an extra universal gate.
The kitchen picture has one limit. A cook can write the list alone. These lists belong to the whole team, and everyone must agree.
PLAIN WORDS · 2 in this section
- scrum
- a way of organising teamwork in short cycles
- increment
- a small step up; in Scrum, finished usable work
PICTURE IT
The picture is the one the lesson above opens with. The table below shows how each part of it matches the work.
THE REAL JOB Distinguish optional readiness checks from the formal and particular .
- Collect the pain
- Turn it into checks
- Sort start from end
- Agree together
- Use and review
HOW THE PICTURE MAPS
| In the picture | In the work |
|---|---|
| Ingredients on the bench before cooking | A story that meets the Definition of Ready |
| Plated, tasted, table cleaned | A story that meets the Definition of Done |
| A cook who stops to find eggs | A team that stops mid-story to ask what it means |
| The kitchen agreeing the list together | The team agreeing both lists |
| A check at the pass before food leaves the kitchen | A quality gate |
WHERE THIS PICTURE STOPS
- A cook can write a list alone, but these lists are agreed by the whole team.
- A kitchen list is the same each day. A team reviews its lists as it learns.
- A long kitchen list may be fine. A long team list slows every story.
HOOK
Ready at the start, done at the end.
REMEMBER IT THIS WAY
A contrast: two neighbours told apart by one test.
Ready is a gate at the door; Done is a gate at the exit. Ask 'can we start?' before the work, and 'is it finished?' after.
| In the trick | What it stands for |
|---|---|
| Ready | clear enough to start |
| Done | checks that work is finished |
Definition of Ready is optional, while Scrum formally requires Done for an Increment; sprint Review is not a release gate.
TELL A FRIEND
Ready is an optional agreement about starting. In Scrum, Done describes the quality required of a usable Increment, respecting organisational minimums.
OFTEN MIXED UP WITH Acceptance criteria and examples (Given / When / Then). That topic shows how to write the conditions for one story. This one is the team's list of checks that a story has them, and that work is finished.
Sources & standards — 2 sources
- Market practice
The Scrum Guide — The Definitive Guide to Scrum: The Rules of the Game (November 2020) ↗ — Ken Schwaber and Jeff Sutherland · Opened November 2020 Scrum Guide, Sprint Backlog, Increment and Definition of Done: Developers, quality, organisational minimum, shared same-product definition and optional complementary practices.
Still current in August 2026. There is no 2025 or 2026 revision of the Guide.
The confusable document is a rename. "Scrum Guide Expansion Pack" (v2025.6) became "Scrum Guide Expanded" (v2026.1, 18 January 2026), published at scrumexpansion.org by Jocham, Coleman and Sutherland. Same URL path, different name, and Jeff Sutherland co-authors both it and the Guide — which is exactly the hook that makes wrong credit plausible. It is not a version of the Scrum Guide.
Nine terms interview answers routinely attribute to Scrum appear zero times in the Guide: story points, velocity, Definition of Ready, sprint zero, user stories, acceptance criteria, grooming, T-shirt sizing, planning poker. So do "estimate" and "estimation".
Two that are usually said to be absent and are present, which is why this paragraph exists: burn-down charts are named once and subordinated — "Various practices exist to forecast progress, like burn-downs, burn-ups, or cumulative flows. While proven useful, these do not replace the importance of empiricism" — and backlog refinement is defined as "an ongoing activity". What is absent is refinement as an event, and the absent word is "grooming".
The Guide does require Product Backlog items to acquire a size, and puts sizing on the Developers, while naming no unit, scale or technique. It says "accountabilities", not "roles"; five events, not four; never "ceremony".
Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.
Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.
Read in full from three independent mirrors that agree byte-for-byte on section structure, on the CC BY-SA 4.0 footer, on word count to within four words, and on all sixteen term-frequency counts above. Edition confirmed as 2020 specifically by zero occurrences of "Development Team" and thirteen of "Product Goal". Actual selected sections above read; prior metadata and wider source-use notes preserved. No full member book or adjacent legacy scheduling rule is implied.
- Market practice
Certified Professional for Requirements Engineering (CPRE) Foundation Level syllabus, English, version 3.3.0 (International Requirements Engineering Board) ↗ — International Requirements Engineering Board (IREB) · Opened CPRE Foundation Level syllabus3.3.0,1April2026, §§3.1–3.8 and6.2–6.7: work products, quality, attributes, versions, configurations/baselines, traceability and change; original educational examples are not universal mandatory templates.
Primary versioned PDF opened via normal web tool and downloaded/extracted on2026-11-06. Copyright authors and IREB e.V.; original educational paraphrase with attribution. No source artwork copied.
PRACTISE AND KEEP
Sources for this topic — 9 sources
- Market practice
The Business Analysis Standard ↗ — International Institute of Business Analysis · The Business Analysis Standard (v2.0), task level: a task to define and agree what counts as a complete, clear requirement and a finished solution (search excerpt of the IIBA task card, page not opened)
A free PDF of the same Standard (v2.0) is published at https://www.iiba.org/knowledgehub/the-business-analysis-standard.pdf. Re-checked 2026-08-25: the Knowledge Hub HTML URL above remains the live canonical page; do not replace it with a third-party mirror.
What it does not carry: the technique catalogue. BABOK v3's 50 techniques live in BABOK v3 only, which is behind IIBA membership (ISBN 9781927584026). A question naming a technique needs the book, verified by a person holding it, or should be rewritten to ask about the task instead.
And it does not carry the knowledge areas either. The Standard's own section 5.3 says it "intentionally does not include information on the knowledge areas defined in the Business Analysis Body of Knowledge", and refers the reader to BABOK for them. It names the six and links out to each, and it illustrates the 30 tasks, but the detail sits in BABOK. Cite this entry at task level, not at knowledge-area level.
Current edition is v2.0, a 2025 refresh of roughly 60 pages. The often-quoted "June 2023, 110 pages" describes a different object — the print edition, ISBN 9781927584378, of the earlier text. Welding one object's version to another's date is the error this paragraph exists to prevent.
Free to read is not open: the document is "All rights reserved". Cite and rewording; do not reproduce at length.
One naming difference worth knowing when comparing against BABOK: the Standard calls knowledge area C "Requirements and Designs Life Cycle Management" where BABOK says "Requirements Life Cycle Management". Both forms were read on the page on the access date, the first in the Standard's own explore section and the second in the BABOK contents beside it.
A dead address, corrected. The registered URL sat under /business-analysis-body-of-knowledge/, a path IIBA has retired; that path and its parent both answer HTTP 404. The Standard is published under /knowledgehub/ at the address above.
The previous note said iiba.org could not be fetched, that roughly thirty candidate mirrors were each refused, and that nothing in the entry was a page-read of an IIBA document. That is withdrawn. The publisher's own page was read directly at HTTP 200 on the access date, and the claims above are checked against it. Read update7November2026: actual selected source scope above now inspected; previous broader/excerpt-only notes remain history and are not extended to unread sections.
- Market practice
The Scrum Guide — The Definitive Guide to Scrum: The Rules of the Game (November 2020) ↗ — Ken Schwaber and Jeff Sutherland · Opened November 2020 Scrum Guide, Sprint Backlog, Increment and Definition of Done: Developers, quality, organisational minimum, shared same-product definition and optional complementary practices.
Still current in August 2026. There is no 2025 or 2026 revision of the Guide.
The confusable document is a rename. "Scrum Guide Expansion Pack" (v2025.6) became "Scrum Guide Expanded" (v2026.1, 18 January 2026), published at scrumexpansion.org by Jocham, Coleman and Sutherland. Same URL path, different name, and Jeff Sutherland co-authors both it and the Guide — which is exactly the hook that makes wrong credit plausible. It is not a version of the Scrum Guide.
Nine terms interview answers routinely attribute to Scrum appear zero times in the Guide: story points, velocity, Definition of Ready, sprint zero, user stories, acceptance criteria, grooming, T-shirt sizing, planning poker. So do "estimate" and "estimation".
Two that are usually said to be absent and are present, which is why this paragraph exists: burn-down charts are named once and subordinated — "Various practices exist to forecast progress, like burn-downs, burn-ups, or cumulative flows. While proven useful, these do not replace the importance of empiricism" — and backlog refinement is defined as "an ongoing activity". What is absent is refinement as an event, and the absent word is "grooming".
The Guide does require Product Backlog items to acquire a size, and puts sizing on the Developers, while naming no unit, scale or technique. It says "accountabilities", not "roles"; five events, not four; never "ceremony".
Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.
Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.
Read in full from three independent mirrors that agree byte-for-byte on section structure, on the CC BY-SA 4.0 footer, on word count to within four words, and on all sixteen term-frequency counts above. Edition confirmed as 2020 specifically by zero occurrences of "Development Team" and thirteen of "Product Goal". Actual selected sections above read; prior metadata and wider source-use notes preserved. No full member book or adjacent legacy scheduling rule is implied.
- Market practice
Definition of Done vs. Definition of Ready (Scrum Alliance) ↗ — Scrum Alliance · Scrum Alliance article on Definition of Done and Definition of Ready: the Definition of Done is core to Scrum and the Definition of Ready is an optional tool that can cause delay if it grows heavy (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
What are quality gates? (Perforce blog) ↗ — Perforce · Perforce blog on quality gates: a quality gate is a checkpoint where agreed criteria must be met before work moves on, and too many gates can cause delay (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Simplified educational illustration
Payments Signal editorial teaching models — Payments Signal
What this simplifies: The Daily List app and its people are invented for teaching. Lists of checks differ from team to team. The Definition of Ready is optional in Scrum, and some teams do well without it.
Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.
- Market practice
Definition of Done vs Acceptance Criteria explained (Scrum.org blog) ↗ — Scrum.org · Scrum Guide 2020 (already cited; the Definition of Done rule is quoted in secondary scrum.org forum posts, wording to be checked against scrumguides.org) ; https://www.scrum.org/resources/blog/definition-done-vs-acceptance-criteria-explained ; https://www.projecttimes.com/?p=7180 (the product owner decides when criteria are met). Practitioners disagree on who accepts; the insert tells the learner
Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
What's Done is Done: User Stories ↗ — Project Times · Scrum Guide 2020 (already cited; the Definition of Done rule is quoted in secondary scrum.org forum posts, wording to be checked against scrumguides.org) ; https://www.scrum.org/resources/blog/definition-done-vs-acceptance-criteria-explained ; https://www.projecttimes.com/?p=7180 (the product owner decides when criteria are met). Practitioners disagree on who accepts; the insert tells the learner
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
The Scrum Guide, November 2020 ↗ — Scrum Guides · Opened primary guide and normal-search rechecked; Definition of Done, Increment, Product Backlog and Sprint Backlog.
Relevant public sections reviewed 6 November 2026 for V11 BA agile/product. See applicability for exact version, scope and access limitations.
- Market practice
Certified Professional for Requirements Engineering (CPRE) Foundation Level syllabus, English, version 3.3.0 (International Requirements Engineering Board) ↗ — International Requirements Engineering Board (IREB) · Opened CPRE Foundation Level syllabus3.3.0,1April2026, §§3.1–3.8 and6.2–6.7: work products, quality, attributes, versions, configurations/baselines, traceability and change; original educational examples are not universal mandatory templates.
Primary versioned PDF opened via normal web tool and downloaded/extracted on2026-11-06. Copyright authors and IREB e.V.; original educational paraphrase with attribution. No source artwork copied.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.