TOPIC 31/4414 MINNOT STARTED

Designing acceptance tests from criteria

Learn how to turn acceptance criteria into a short list of tests the business can read, which test levels an analyst joins, and how a test case is built.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: Writing the marking scheme before the exam. A teacher writes the marking scheme before the exam. Question one is worth five marks, and full marks need these three points. Because the scheme exists first, marking is fair and students know what counts.

is choosing a small set of tests that shows whether the are met. A reviewable test set is a short list of tests that a business owner can read and judge in one sitting. A test-to-criterion link is a note that ties each test to the criterion it checks.

Sam, the for the Daily List app, and Tom, the tester, sit down with the criteria for "share a list". Nina, the who decides what the team builds next, wants to be sure the tests cover what she cares about. They design the tests before Leo, the developer, finishes the code.

The picture has a limit. An exam is marked once, but a test may run many times, and the app keeps changing.

PLAIN WORDS · 1 in this section
reviewable
able to be looked over again

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the work.

THE REAL JOB The picture helps a newcomer remember that tests are agreed before the work is judged, so that checking is fair and everyone knows what counts.

  1. Read the criterion
  2. Write the test case
  3. Add edges and must-nots
  4. Link test to criterion
  5. Ask the owner to review
From criterion to reviewed tests

HOW THE PICTURE MAPS

How each part of the picture matches the work
In the pictureIn the work
The marking schemeThe set of acceptance tests
Five marks for three pointsA criterion with a clear pass condition
Written before the examDesigned before the code is finished
A teacher who reads the schemeThe business owner who reviews the tests
A mark linked to each questionA test linked to a criterion

WHERE THIS PICTURE STOPS

  • An exam is marked once, but a test may run many times as the app changes.
  • A teacher marks answers by judgement, whereas a test should give the same pass or fail every time.
  • An exam covers a syllabus, while acceptance tests cover only the criteria of one story.

HOOK

Criterion, case, link, review.

REMEMBER IT THIS WAY

A sequence: the real steps, in order.

Ask of each test: which criterion does it check, which edge or must-not does it cover, and who reviews it?

What each part of the trick stands for
In the trickWhat it stands for
Which criterionLink test to criterion
Which edge or must-notAdd edges and must-nots
Who reviewsAsk the owner to review

TELL A FRIEND

turns into a short list of tests the business can read. Each test is linked to a criterion, so gaps are easy to see.

OFTEN MIXED UP WITH Acceptance criteria and examples (Given / When / Then). That topic writes the criteria. This one designs the tests that check them.

PRACTISE AND KEEP

Sources for this topic — 7 sources
  1. Market practice

    ISTQB Certified Tester Acceptance Testing (CT-AcT) syllabus ↗ — International Software Testing Qualifications Board (ISTQB) · Mirror copy of the publisher PDF (ISTQB syllabus CT-AcT v1.0, 21 June 2019), version checked against the document's own front matter, read in full text: section 2.1 writing acceptance criteria (AcT-2.1.1, K3), section 2.2 designing acceptance tests (AcT-2.2.1, K2, and AcT-2.2.2, K3) and section 1.2.2 (AcT-1.2.2, K2) on the collaboration of business analysts and testers

    Version 1.0 syllabus (21 June 2019), read in full text. Used for the objective ids and levels, the modelling objectives in chapter 3, the four pillars of user experience requirements analysis in section 4.2.1 and the scope that leaves out operational acceptance testing. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-AcT v1.0, 21 June 2019), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual related substantive chapters 1–5 and Appendix text reviewed for Acceptance2019; not an assertion that every source figure was visually reviewed. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  2. Market practice

    ISTQB Certified Tester Foundation Level Syllabus v4.0.1 ↗ — International Software Testing Qualifications Board · Certified Tester Foundation Level Syllabus v4.0.1 (International Software Testing Qualifications Board): test levels from component to acceptance testing, and test cases built from conditions (confirmed against the syllabus, read in full text from a mirror copy of the publisher PDF, v4.0.1, 15 September 2024)

    The examinable statement of what a foundation-level tester is expected to know: six chapters, 64 learning objectives, each tagged K1 Remember, K2 Understand or K3 Apply, plus the test-design techniques the qualification names and groups as black-box, white-box and experience-based.

    Used here for the test-craft questions a Payment Quality Assurance Analyst and a Production Support Analyst are asked. It is cited for what the syllabus says a tester must be able to do, never as a rule about how payments work. · Checked 2026-11-07

    v4.0.1 is dated 15 September 2024 and is a list of corrections to v4.0 (21 April 2023) that reworded six learning objectives — not a cosmetic reissue. 78 pages.

    Two traps this entry exists to stop. v4.0.2 is the German edition (1 March 2025, 94 pages), so sorting by version number reaches the wrong document. And the widely-repeated per-chapter question allocation "8 / 5 / 4 / 11 / 9 / 3" is wrong: it is 8 / 6 / 4 / 11 / 9 / 2, derived from three official sample-exam answer keys and confirmed against the Exam Structure Tables.

    The single most consequential detail for a question bank: white-box coverage — statement and branch — is K2 "Explain", not K3 "Apply" (FL-4.3.1, FL-4.3.2, FL-4.3.3), and MC/DC, path and condition coverage are declared out of scope in §4.3. A question asking a candidate to compute branch coverage is testing something this syllabus does not.

    Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.

    Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.

    Read from two independent PDF-to-markdown conversions mirrored on raw.githubusercontent.com. They are treated as faithful because they were produced by unrelated parties with different tooling, agree on the full 64-item objective set including wording, and reproduce the same internal inconsistency present in the source PDF. Chapter 1 reads "testware that supports" where Appendix B reads "that support". A conversion artefact does not replicate across two toolchains.

    The licence permits attributed non-commercial extracts and use as the basis for articles. Whether a site that sells a pass may rely on that is an owner's decision, not this entry's.

    7 November 2026 review: actual publisher PDF 4.0.1, 15 September 2024, 78 pages, front matter/copyright and relevant numbered operative sections 0.5–0.10 and chapters 1–6 compared with CTFLpractice lessons. Earlier mirror/search descriptions are historical access records. TheK2 white-box objectives require explanation; the source does not justify a categorical ban on small numeric illustrations that support explanation. Later Exam Rules 1.2§4.1.4 usesK2 for keyword definitions, while syllabus§0.5 usesK1; keep dated scopes distinct. No copied questions or figure assets.

  3. Market practice

    Foundation Level testing syllabus, 2.2 Test Levels and Test Types (US member board of the International Software Testing Qualifications Board) ↗ — American Software Testing Qualifications Board (ASTQB) · Foundation Level syllabus, 2.2 Test Levels and Test Types (member board of the International Software Testing Qualifications Board): test levels and test types in the foundation syllabus (registry source; page not opened in this batch)

    A second publisher for the syllabus section on test levels and test types. Cited for the five levels (component, component integration, system, system integration and acceptance), for the four test types (functional, non-functional, black-box and white-box), and for the forms acceptance testing takes. · Checked 2026-11-07

    Seen as a search excerpt; the page was not opened. The authoring container could not resolve this publisher's host name when a fetch was tried on 12 October 2026 for related hosts, so this is a reachability gap and not a statement about the publisher. It relays the registered syllabus and adds no independent rule.

    7 November 2026 current review: actual 2.2 overview and 2.2.1–2.2.3 read; levels can overlap, fivelevels/fourtypes and confirmation/regression distinction. Prior excerpt-only access is historical; no new licence grant is implied.

  4. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: Daily List and the people are invented. The sources are two syllabi and a member board page, and we read search excerpts only. Names for test levels differ: the syllabus calls unit testing component testing. The test-writing steps are a simplified version.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

  5. Market practice

    Test case vs test scenario ↗ — Virtuoso QA · Search excerpts only: plan is the whole effort, scenario the what, case the how.

    Vendor blog: a scenario is a high-level behaviour, a case is the detailed executable recipe. · Checked 2026-10-19

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  6. Market practice

    Test Plan Vs Test Strategy Vs Test Case Vs Test Scenario ↗ — Software Testing Help · Search excerpts only: plan is the whole effort, scenario the what, case the how.

    Tutorial site: plan covers the whole effort, scenario says what, case says how. · Checked 2026-10-19

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  7. Market practice

    Certified Professional for Requirements Engineering (CPRE) Foundation Level syllabus, English, version 3.3.0 (International Requirements Engineering Board) ↗ — International Requirements Engineering Board (IREB) · CPRE Foundation Level syllabus3.3.0,1April2026, §§3.6,4.4 (3.6 Requirements Documents and Documentation Structures; 4.4 Validation of Requirements).

    CPRE Foundation Level syllabus3.3.0,1April2026, §§3.7 and4.1–4.4: prototype purposes, sources, technique families, quality needs/constraints, conflict methods and validation. · Checked 2026-11-06

    Primary versioned PDF opened via normal web tool and downloaded/extracted on2026-11-06. Copyright authors and IREB e.V.; original educational paraphrase with attribution. No source artwork copied.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.