TOPIC 14/4412 MINNOT STARTED

Alternate and exception flows

Real users take other paths. Learn to write the valid other path and the path where something goes wrong, and to say what is true when each one ends.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: A recipe that plans for a sunk cake. A recipe tells you what to do when the oven is hot. A good one also tells you what to do if the cake sinks. Maybe you have no eggs, so you use a swap and still bake the cake. That is a different way to the same cake. Maybe the cake sinks. Then you start again, or you serve it as a pudding.

Sam is a , the person who finds out what people need. Sam works on Daily List, a to-do list app. Sam has written the for "Invite a person to a list". The main flow is the usual path when everything goes right. It has six steps.

Now Sam asks what else can happen. Lily types an address, and the person already has an account. The invite can still work. It goes to the person inside the app. This is an : a different but valid path to the same goal.

Then Lily types an address with a typing slip. The invite cannot be sent. This is an : a path taken when something goes wrong. The app tells Lily and lets her fix it.

Each flow ends with a postcondition: what is true when the has ended. After the main flow, an invite exists. After the invalid-address attempt, no new invite is created by that attempt and the list is unchanged; an earlier invitation may still exist.

The recipe picture has one limit. Cake rescues are few. Software has many ways to go wrong.

PLAIN WORDS · 1 in this section
postcondition
what is true when a use case has ended

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the work.

THE REAL JOB Writing the valid other paths and the failing paths, each with a checkable end state, finds surprises on paper and not after release.

  1. Walk the main flow
  2. Ask what else
  3. Ask what could go wrong
  4. Write start and end
  5. Rank them
Finding other paths

HOW THE PICTURE MAPS

How each part of the picture matches the work
In the pictureIn the work
A recipe for a hot ovenThe main flow
Swapping eggs and still baking the cakeAn alternate flow
A cake that sinks and needs a rescueAn exception flow
What is on the table when cooking endsA postcondition
Deciding which mistakes to plan forRanking the other paths

WHERE THIS PICTURE STOPS

  • Cake rescues are few, but software has many ways to go wrong.
  • A cook meets a sunk cake once in a while. Software meets its exceptions every day.
  • A recipe ends at one table. A use case can end in several different states.

HOOK

Another way, a wrong way, then the end state.

REMEMBER IT THIS WAY

A contrast: two neighbours told apart by one test.

Normal alternative or problem to recover from? Name the condition, branch and result; a recoverable exception may still achieve the goal.

What each part of the trick stands for
In the trickWhat it stands for
Alternate flowa different but valid path to the same goal
Exception flowa path taken when something goes wrong

TELL A FRIEND

An is a different valid path to the same goal. An is a path when something goes wrong, and a postcondition says what is true at the end.

OFTEN MIXED UP WITH Use case specifications. That topic writes the and the precondition. This one adds the other paths and the end states.

Sources & standards — 1 source
  1. Market practice

    Certified Professional for Requirements Engineering (CPRE) Foundation Level syllabus, English, version 3.3.0 (International Requirements Engineering Board) ↗ — International Requirements Engineering Board (IREB) · Opened CPRE Foundation Level syllabus3.3.0,1April2026, §§3.1–3.8 and6.2–6.7: work products, quality, attributes, versions, configurations/baselines, traceability and change; original educational examples are not universal mandatory templates.

    CPRE Foundation Level syllabus3.3.0,1April2026, §§3.7 and4.1–4.4: prototype purposes, sources, technique families, quality needs/constraints, conflict methods and validation. · Checked 2026-11-06

    Primary versioned PDF opened via normal web tool and downloaded/extracted on2026-11-06. Copyright authors and IREB e.V.; original educational paraphrase with attribution. No source artwork copied.

PRACTISE AND KEEP

Sources for this topic — 6 sources
  1. Market practice

    The Business Analysis Standard ↗ — International Institute of Business Analysis · The Business Analysis Standard (v2.0), task level: a task to specify requirements and a task to check them, including the cases where an actor does something different or something fails (search excerpt of the IIBA task card, page not opened)

    IIBA's free statement of what business analysis is: the Business Analysis Core Concept Model and its six core concepts, the distinction between a requirement and a design, and the requirements classification schema. It names the six knowledge areas and the thirty tasks under them, and illustrates those tasks, while referring the reader to BABOK for their detail.

    Used here for the BA-technique questions a Payments Business Analyst and a Payments Product Manager are asked — at task level. The task list is the same thirty as BABOK v3, so a task-level claim is citable to it. Read update7November2026: Actual official Business Analysis Standard v2.0(2025) taskcards Assess Requirement and Design Changes printedp36 and Define Change Strategy p41 read7November2026: proposed impacts/recommendations, current-to-future options and transitions. No universal readiness template or full BABOK claimed read. · Checked 2026-08-25

    A free PDF of the same Standard (v2.0) is published at https://www.iiba.org/knowledgehub/the-business-analysis-standard.pdf. Re-checked 2026-08-25: the Knowledge Hub HTML URL above remains the live canonical page; do not replace it with a third-party mirror.

    What it does not carry: the technique catalogue. BABOK v3's 50 techniques live in BABOK v3 only, which is behind IIBA membership (ISBN 9781927584026). A question naming a technique needs the book, verified by a person holding it, or should be rewritten to ask about the task instead.

    And it does not carry the knowledge areas either. The Standard's own section 5.3 says it "intentionally does not include information on the knowledge areas defined in the Business Analysis Body of Knowledge", and refers the reader to BABOK for them. It names the six and links out to each, and it illustrates the 30 tasks, but the detail sits in BABOK. Cite this entry at task level, not at knowledge-area level.

    Current edition is v2.0, a 2025 refresh of roughly 60 pages. The often-quoted "June 2023, 110 pages" describes a different object — the print edition, ISBN 9781927584378, of the earlier text. Welding one object's version to another's date is the error this paragraph exists to prevent.

    Free to read is not open: the document is "All rights reserved". Cite and rewording; do not reproduce at length.

    One naming difference worth knowing when comparing against BABOK: the Standard calls knowledge area C "Requirements and Designs Life Cycle Management" where BABOK says "Requirements Life Cycle Management". Both forms were read on the page on the access date, the first in the Standard's own explore section and the second in the BABOK contents beside it.

    A dead address, corrected. The registered URL sat under /business-analysis-body-of-knowledge/, a path IIBA has retired; that path and its parent both answer HTTP 404. The Standard is published under /knowledgehub/ at the address above.

    The previous note said iiba.org could not be fetched, that roughly thirty candidate mirrors were each refused, and that nothing in the entry was a page-read of an IIBA document. That is withdrawn. The publisher's own page was read directly at HTTP 200 on the access date, and the claims above are checked against it. Read update7November2026: actual selected source scope above now inspected; previous broader/excerpt-only notes remain history and are not extended to unread sections.

  2. Market practice

    Use-Case Specification template (Rational Unified Process style) ↗ — University mirror of IBM Rational Unified Process templates · Use-case specification template in the Rational Unified Process style: alternative flows that start at a step of the basic flow and say where the main flow resumes, and postconditions that describe the state after the use case (search excerpt, page not opened)

    Template with sections for brief description, flow of events (basic and alternative flows), special requirements, preconditions, postconditions and extension points. It is a mirror of an old vendor template; UML itself sets no template for use case specifications. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  3. Market practice

    What is the difference between a use case alternative flow and an exception flow? (Modern Analyst) ↗ — Modern Analyst · Modern Analyst interview question on alternative and exception flows: an alternate flow still lets the user reach the goal and is often a choice, while an exception flow is an unintended path such as missing information, and some authors use only the word alternative for both (search excerpt, page not opened)

    Practitioner answer: an alternate flow still lets the user reach the goal and is often a choice; an exception flow is an unintended path such as missing information, and the system should recover. Search results note some authors use only the word alternative for both. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  4. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: The Daily List app and its people are invented for teaching. Authors split these paths in different ways, and some use only the word alternative for both. The split shown here is one common choice.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

  5. Market practice

    Certified Professional for Requirements Engineering (CPRE) Foundation Level syllabus, English, version 3.3.0 (International Requirements Engineering Board) ↗ — International Requirements Engineering Board (IREB) · Opened CPRE Foundation Level syllabus3.3.0,1April2026, §§3.1–3.8 and6.2–6.7: work products, quality, attributes, versions, configurations/baselines, traceability and change; original educational examples are not universal mandatory templates.

    CPRE Foundation Level syllabus3.3.0,1April2026, §§3.7 and4.1–4.4: prototype purposes, sources, technique families, quality needs/constraints, conflict methods and validation. · Checked 2026-11-06

    Primary versioned PDF opened via normal web tool and downloaded/extracted on2026-11-06. Copyright authors and IREB e.V.; original educational paraphrase with attribution. No source artwork copied.

  6. Market practice

    Systems Engineering Handbook Rev2, Appendix D: Requirements Verification Matrix ↗ — NASA · Normal-search first-party Appendix D, Appendix C good requirements and section 6.2 excerpts; trace mapping and verification evidence distinguished. Handbook Rev2 (2016); live web edition.

    Normal-search first-party Appendix D, Appendix C good requirements and section 6.2 excerpts; trace mapping and verification evidence distinguished. Handbook Rev2 (2016); live web edition. · Checked 2026-11-06

    Original educational paraphrase; no source figure copied. Access status is stated in applicability.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.