TOPIC 18/5213 MINNOT STARTED

Test maturity models and TMMi

A maturity model shows steps a test process can grow through. Learn the five Test Maturity Model integration (TMMi) levels, what level two holds, and when a model only adds paper.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: a belt scheme in a sport. A club gives coloured belts. Each belt has things you must show, such as a move or a rule. The belts tell you where you are and what to learn next. They do not make you good by themselves.

Daily List is a to-do list app. Mei, the test lead, reads about a model that gives test teams levels in the same way. She asks which levels her team already meets and which would only be paperwork.

Nina, the product owner, asks a fair question. Will this make Daily List safer, or only add forms? Mei decides to use the model to ask questions, not to chase a level.

The picture has a limit. A belt is awarded after a test of skill. A can be claimed on paper while the real work stays the same.

(SYNTHETIC / TRAINING ONLY: Daily List and every person named in this lesson are invented.)

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the software.

THE REAL JOB Using a ladder of test practices to ask good questions, without chasing the ladder for its own sake.

  1. Know the level
  2. See the gaps
  3. Pick two
  4. Check in a retrospective
Belts are questions

HOW THE PICTURE MAPS

How each part of the picture matches the software
In the pictureIn the software
The belt schemeThe maturity model
A belt colourA maturity level
The moves for that beltThe process areas
Showing your moves to the clubShowing evidence in an assessment

WHERE THIS PICTURE STOPS

  • A belt is earned in front of a judge. A level can be claimed on paper while the work stays the same.
  • A sport has one set of belts. Models differ and change between versions.
  • The picture says nothing about the cost of an assessment.
  • Current Model 2.0 has six areas at its second level; a five-area historical Release 1.0 example is not a complete current-level assessment.

HOOK

Belts are questions

REMEMBER IT THIS WAY

A rule of thumb: if you see this, think that.

If you cannot name the real problem a form solves, usually do not write it just to match a line in the model.

What each part of the trick stands for
In the trickWhat it stands for
A level is a questionuse the model to ask questions, not to chase a level
A form for the model's sakeonly add forms

A client or a contract may ask for the paper itself, and then the form may be needed.

TELL A FRIEND

A maturity model is a belt scheme: it shows where you are and what to learn next, but the belt does not make you good.

OFTEN MIXED UP WITH Process improvement and retrospectives. The retrospective lesson is about the team's own look back. This lesson adds an outside ladder to compare against.

PRACTISE AND KEEP

Sources for this topic — 33 sources
  1. Market practice

    What is TMMi in software testing (TestFort) ↗ — TestFort · TMMi level 2 process areas: test policy and strategy, test planning, test monitoring and control, test design and execution, and test environment (search excerpt, page not opened)

    Vendor page that lists Test Maturity Model integration (TMMi) level 2 process areas such as test policy and strategy, test planning, test monitoring and control, test design and execution, and test environment. Practitioner guidance, not a standard. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  2. Market practice

    A roadmap for understanding and implementing the Test Maturity Model integration (RMG) ↗ — RMG · A consultancy roadmap that describes TMMi levels and how to start (search excerpt, page not opened)

    Consultancy page that describes Test Maturity Model integration (TMMi) levels and how to start an assessment. Practitioner guidance, not a standard. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  3. Market practice

    Testing Maturity Model (Wikipedia) ↗ — Wikipedia · Overview of testing maturity models (search excerpt, page not opened)

    Overview of testing maturity models. Encyclopedia page. Practitioner guidance, not a standard. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  4. Market practice

    ISTQB Certified Tester Advanced Level Test Management (CTAL-TM) v3.0, certification page ↗ — International Software Testing Qualifications Board (ISTQB) · Mirror copy of the publisher PDF (ISTQB syllabus CTAL-TM v3.0, 3 May 2024), version checked against the document's own front matter, read in full text: section 1.5 improving the test process: IDEAL (TM-1.5.1), model-based improvement such as TMMi and TPI NEXT (TM-1.5.2), analytical-based improvement (TM-1.5.3) and retrospectives (TM-1.5.4)

    Says Certified Tester Advanced Level Test Management (CTAL-TM) v3.0 covers managing test activities (planning, monitoring, control, completion), test strategy, risk-based testing and tool support decisions. Named as a public overview page only; the syllabus text is not quoted. · Checked 2026-11-07

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Version 3.0. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail. A second search on 2026-10-20 returned the page at this address, which replaces the shorter address held before; the page was still not opened (search excerpt, page not opened).

    V52 opened and read the actual current certification page substantive content 7 November 2026; the earlier excerpt-only access above is historical.

  5. Market practice

    ISTQB Certified Tester Advanced Level Test Management (CTAL-TM) v3.0, certification page ↗ — International Software Testing Qualifications Board (ISTQB) · The advanced test management certification page names test process improvement among its themes (search excerpt, page not opened)

    Says Certified Tester Advanced Level Test Management (CTAL-TM) v3.0 covers managing test activities (planning, monitoring, control, completion), test strategy, risk-based testing and tool support decisions. Named as a public overview page only; the syllabus text is not quoted. · Checked 2026-11-07

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Version 3.0. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail. A second search on 2026-10-20 returned the page at this address, which replaces the shorter address held before; the page was still not opened (search excerpt, page not opened).

    V52 opened and read the actual current certification page substantive content 7 November 2026; the earlier excerpt-only access above is historical.

  6. Market practice

    Glossary of testing terms from the International Software Testing Qualifications Board (equivalence partition, equivalence partitioning, boundary value) ↗ — International Software Testing Qualifications Board (ISTQB) · The testing glossary has entries for test process improvement and test maturity (search excerpt, page not opened)

    The board's glossary of testing terms. Cited for two definitions. An equivalence partition is a subset of a value domain for which a component or system is expected to treat all values the same. A boundary value is the minimum or maximum value of an ordered equivalence partition. · Checked 2026-10-12

    Seen as a search excerpt; the page was not opened. The authoring container could not resolve this publisher's host name when a fetch was tried on 12 October 2026 for related hosts, so this is a reachability gap and not a statement about the publisher. The glossary has an older and a newer version of the entry for equivalence partitioning; the newer one defines the partition rather than the technique.

  7. Market practice

    International Software Testing Qualifications Board (ISTQB) Certified Tester Expert Level Improving the Testing Process Syllabus (CTEL-ITP) — 2011 release ↗ — International Software Testing Qualifications Board (ISTQB) · 2011 release, sections 3.1.2, 3.3 and 3.4 | Improving the Testing Process, 2011 release, §3.3.1–3.3.2; full PDF opened 2026-10-24. Synthetic Daily List application. | Improving the Testing Process, 2011 release, §3.1–3.3; 6.3; full PDF opened 2026-10-24. Synthetic Daily List application.

    Selected Expert Level test-improvement concepts and their exact chapter references. Supports learning explanations and synthetic exercises; does not establish complete syllabus coverage, accreditation or a certified maturity level. · Checked 2026-10-23

    Opened the complete 75-page PDF through the official International Software Testing Qualifications Board (ISTQB) download page on 2026-10-23. Cover and revision history identify the 2011 release, 1 November 2011. Checked 2.4.2 Initiating, Diagnosing, Establishing, Acting and Learning (IDEAL). Also checked 3.1.2 staged/continuous views, 3.3 Test Process Improvement Next and Test Maturity Model integration. Checked 3.4 Systematic Test and Evaluation Process / Critical Testing Process. Checked 4.3 Goal-Question-Metric, chapter 6 improvement steps, and chapters 7–8 people and change.

  8. Market practice

    International Software Testing Qualifications Board (ISTQB) Certified Tester Expert Level Improving the Testing Process Syllabus (CTEL-ITP) — 2011 release ↗ — International Software Testing Qualifications Board (ISTQB) · 2011 release, sections 3.1.2, 3.3 and 3.4

    Selected Expert Level test-improvement concepts and their exact chapter references. Supports learning explanations and synthetic exercises; does not establish complete syllabus coverage, accreditation or a certified maturity level. · Checked 2026-10-23

    Opened the complete 75-page PDF through the official International Software Testing Qualifications Board (ISTQB) download page on 2026-10-23. Cover and revision history identify the 2011 release, 1 November 2011. Checked 2.4.2 Initiating, Diagnosing, Establishing, Acting and Learning (IDEAL). Also checked 3.1.2 staged/continuous views, 3.3 Test Process Improvement Next and Test Maturity Model integration. Checked 3.4 Systematic Test and Evaluation Process / Critical Testing Process. Checked 4.3 Goal-Question-Metric, chapter 6 improvement steps, and chapters 7–8 people and change.

  9. Market practice

    International Software Testing Qualifications Board (ISTQB) Certified Tester Expert Level Improving the Testing Process Syllabus (CTEL-ITP) — 2011 release ↗ — International Software Testing Qualifications Board (ISTQB) · Improving the Testing Process, 2011 release, §3.3.1–3.3.2; full PDF opened 2026-10-24. Synthetic Daily List application.

    Selected Expert Level test-improvement concepts and their exact chapter references. Supports learning explanations and synthetic exercises; does not establish complete syllabus coverage, accreditation or a certified maturity level. · Checked 2026-10-23

    Opened the complete 75-page PDF through the official International Software Testing Qualifications Board (ISTQB) download page on 2026-10-23. Cover and revision history identify the 2011 release, 1 November 2011. Checked 2.4.2 Initiating, Diagnosing, Establishing, Acting and Learning (IDEAL). Also checked 3.1.2 staged/continuous views, 3.3 Test Process Improvement Next and Test Maturity Model integration. Checked 3.4 Systematic Test and Evaluation Process / Critical Testing Process. Checked 4.3 Goal-Question-Metric, chapter 6 improvement steps, and chapters 7–8 people and change.

  10. Market practice

    Test Process Improvement (TPI) Next: Test Maturity Matrix tool, User Manual v1.2.1 ↗ — Sogeti Nederland B.V. · User manual v1.2.1, printed p. 17 / file page 19, figure 21 visually read; §§3.1–3.2 and 4.8. English PDF opened 2026-10-24.

    Historical Expert syllabus study and synthetic test-improvement exercises. Provides model detail, not accreditation or current mandatory practice. · Checked 2026-10-24

    2013-01-10 English manual downloaded and read. Printed p. 17, file page 19, matrix rendered and visually read for all sixteen key areas. Sections 3.1–3.2 and 4.8 read for checkpoints, exclusions and dependencies. Upload path is not publication date.

  11. Market practice

    International Software Testing Qualifications Board (ISTQB) Certified Tester Expert Level Improving the Testing Process Syllabus (CTEL-ITP) — 2011 release ↗ — International Software Testing Qualifications Board (ISTQB) · Improving the Testing Process, 2011 release, §3.1–3.3; 6.3; full PDF opened 2026-10-24. Synthetic Daily List application.

    Selected Expert Level test-improvement concepts and their exact chapter references. Supports learning explanations and synthetic exercises; does not establish complete syllabus coverage, accreditation or a certified maturity level. · Checked 2026-10-23

    Opened the complete 75-page PDF through the official International Software Testing Qualifications Board (ISTQB) download page on 2026-10-23. Cover and revision history identify the 2011 release, 1 November 2011. Checked 2.4.2 Initiating, Diagnosing, Establishing, Acting and Learning (IDEAL). Also checked 3.1.2 staged/continuous views, 3.3 Test Process Improvement Next and Test Maturity Model integration. Checked 3.4 Systematic Test and Evaluation Process / Critical Testing Process. Checked 4.3 Goal-Question-Metric, chapter 6 improvement steps, and chapters 7–8 people and change.

  12. Market practice

    Test Maturity Model Integration Framework, Release 1.0 ↗ — TMMi Foundation · Release 1.0 (2012), Level 2 and Level 3 areas; printed pp. 79–80 and area definitions. Historical companion, not the current framework.

    Historical Expert syllabus study and synthetic test-improvement exercises. Provides model detail, not accreditation or current mandatory practice. · Checked 2026-10-24

    2012 release opened. Level 2 and Level 3 area definitions and goal summaries consulted. Historical companion to the 2011 Expert syllabus; not a claim that this is the current framework or that a small informal exercise earns a rating. Downloaded PDF and read all Level 2 and Level 3 specific-goal summaries, printed pp. 24–128.

  13. Market practice

    Improve your test process, improve your life (Qualitest blog on TPI NEXT) ↗ — Qualitest · Sixteen key areas; clusters and enablers (search excerpt, page not opened)

    Describes TPI NEXT as sixteen key areas, with clusters and enablers added to make it business driven. Practitioner overview, not the model text. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  14. Market practice

    Test Process Improvement with TPI NEXT: what the model does not tell you but you should know (SQA Days 2013 slides) ↗ — Tapani Aaltio, conference slides · 157 checkpoints in this deck and 156 in one older deck (search excerpt, page not opened)

    Conference slides giving sixteen key areas in three groups, four maturity levels and 157 checkpoints. One older Russian-language Sogeti-derived deck gives 156. Not an official page. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  15. Market practice

    TPI NEXT Foundation sample exam, June 2016 (EXIN exam, hosted by DIT) ↗ — EXIN, via DIT · Checkpoints answered yes or no; reporting as a key area with improvement suggestions (search excerpt, page not opened)

    Sample questions show checkpoints as statements answered yes or no, and reporting as a key area with its own improvement suggestions. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  16. Market practice

    TPI NEXT Foundation exam (EXIN certification page) ↗ — EXIN · The TPI NEXT Foundation exam is no longer available after the end of 2023 (search excerpt, page not opened)

    States that the TPI NEXT Foundation certification is no longer available after 31 December 2023. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  17. Market practice

    TMMi Documents (TMMi Foundation) ↗ — TMMi Foundation · Model v2.0 with Agile and DevOps in the model; release notes from Release 1.3; summaries add the new level 2 area Implementation and Habit and the renamed level 3 area Test Process and Integration (search excerpt, page not opened)

    Current model2.0, companion documents and Professional syllabus2.3 are listed separately from historical modelR1.3/syllabus2.2. Old training/exams/retakes not available after1August2027. · Checked 2026-11-06

    Actual Foundation documents page reviewed6November2026, including version-specific retirement notices. Do not replace historical R1.3 citations with unqualified model2.0 facts.

  18. Market practice

    TMMi certification (GASQ) ↗ — Global Association for Software Quality · End of Release 1.3 assessments and exams; both exams offered during the transition (search excerpt, page not opened)

    Exam provider page for TMMi Professional: 40 multiple-choice questions, a 65 percent pass mark, 60 or 75 minutes, model v2.0 and syllabus v2.3, and the end of Release 1.3 exams. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  19. Market practice

    TMMi in the Agile world, version 1.4 (Italian edition, iSQI copy) ↗ — TMMi Foundation · Companion guide TMMi in the Agile world, version 1.4 (search excerpt, page not opened)

    Companion document to the TMMi model on reading TMMi in Agile teams. Version 1.4 is copyright 2020 and an earlier version 1.3 exists in other languages. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  20. Market practice

    A roadmap for understanding and implementing the Test Maturity Model integration (RMG) ↗ — RMG · Levels 4 and 5 and the rule that a level needs the process areas of the levels below it (search excerpt, page not opened)

    Consultancy page that describes Test Maturity Model integration (TMMi) levels and how to start an assessment. Practitioner guidance, not a standard. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  21. Market practice

    What is TMMi in software testing (TestFort) ↗ — TestFort · Level 4 and level 5 process areas as listed by a secondary article (search excerpt, page not opened)

    Vendor page that lists Test Maturity Model integration (TMMi) level 2 process areas such as test policy and strategy, test planning, test monitoring and control, test design and execution, and test environment. Practitioner guidance, not a standard. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  22. Market practice

    TPI Next (Test Process Improvement Next): optimising test processes (Russian-language slide deck) ↗ — SlideShare (conference deck) · The sixteen key areas in three groups of six, five and five: stakeholder relations, test management and test profession (conference slides, search excerpt, page not opened)

    Slides that list the sixteen key areas in three groups. Stakeholder relations holds stakeholder commitment, degree of involvement, test strategy, test organization, communication and reporting. Test management holds test process management, estimating and planning, metrics, defect management and testware management. Test profession holds methodology practice, tester professionalism, test case design, test tools and test environment. A conference deck, not an official page. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  23. Market practice

    Test Process Improvement (TPI) paper by Andersin ↗ — University of Helsinki (course paper) · The original TPI model places a process at a level when it passes all checkpoints of that level; this is the earlier model, not TPI NEXT (search excerpt, page not opened)

    Describes the original TPI model, which came before TPI NEXT: each checkpoint is a requirement, and a process that passes all checkpoints of a level is classified at that level. It is about the original model, not TPI NEXT. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  24. Market practice

    ISTQB Certified Tester Advanced Level Test Management (CTAL-TM) v3.0, certification page ↗ — International Software Testing Qualifications Board (ISTQB) · Mirror copy of the publisher PDF (ISTQB syllabus CTAL-TM v3.0, 3 May 2024), read in full text: Appendix C, release notes, lists the parts on Improving the Test Process CTP and STEP among the sections deleted from the CTAL TM 2012 syllabus; v3.0 is described as a major update based on the 2012 Test Manager syllabus

    Says Certified Tester Advanced Level Test Management (CTAL-TM) v3.0 covers managing test activities (planning, monitoring, control, completion), test strategy, risk-based testing and tool support decisions. Named as a public overview page only; the syllabus text is not quoted. · Checked 2026-11-07

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Version 3.0. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail. A second search on 2026-10-20 returned the page at this address, which replaces the shorter address held before; the page was still not opened (search excerpt, page not opened).

    V52 opened and read the actual current certification page substantive content 7 November 2026; the earlier excerpt-only access above is historical.

  25. Market practice

    Critical Testing Processes: A Non-Prescriptive Framework for Test Process Improvement ↗ — Rex Black Inc. · Names the Critical Testing Processes framework for test process improvement; full author-hosted article read 2026-10-24

    Historical Expert syllabus study and synthetic test-improvement exercises. Provides model detail, not accreditation or current mandatory practice. · Checked 2026-10-24

    Full author-hosted article read 2026-10-24, labelled updated April 2026. Supports twelve processes and quantitative/qualitative assessment. Its description of Test Process Improvement (TPI) Next as a five-stage model is not adopted: the 2011 syllabus and Sogeti manual define its four named levels and continuous representation.

  26. Market practice

    Systematic Software Testing, book listing (Agile Connection) ↗ — Agile Connection · The book Systematic Software Testing by Craig and Jaskiel is the source of the STEP method, Systematic Test and Evaluation Process (search excerpt, page not opened)

    Cited only to tie the STEP method (Systematic Test and Evaluation Process) to the book Systematic Software Testing by Rick Craig and Stefan Jaskiel. A book listing, not the book. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  27. Market practice

    Testing Maturity Model (Wikipedia) ↗ — Wikipedia · The Testing Maturity Model was developed at the Illinois Institute of Technology in 1996 as a complement to the Capability Maturity Model, with five levels and an assessment model, and is replaced by TMMi (search excerpt, page not opened)

    Overview of testing maturity models. Encyclopedia page. Practitioner guidance, not a standard. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  28. Market practice

    Software Testing Process Models Benefits and Drawbacks: a Systematic Literature Review (arXiv 1901.01450) ↗ — arXiv · A systematic review describes the TMM structure: five levels with maturity goals, smaller goals, activities, tasks and responsibilities; an assessment model with a maturity questionnaire and procedure; a level is reached when the goals of that level and all lower levels are met (search excerpt, page not opened)

    Cited for the structure of the Testing Maturity Model: five levels, maturity goals and smaller goals, activities, tasks and responsibilities, and an assessment model. A secondary review, not the original model papers. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  29. Market practice

    Improve your test process, improve your life (Qualitest blog on TPI NEXT) ↗ — Qualitest · Requirements for each level are written as checkpoints that must be answered positively to qualify for that level (search excerpt, page not opened)

    Describes TPI NEXT as sixteen key areas, with clusters and enablers added to make it business driven. Practitioner overview, not the model text. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  30. Market practice

    TMMi certification (GASQ) ↗ — Global Association for Software Quality · The TMMi Professional certificate is a multiple-choice exam on the model, now on model v2.0 and syllabus v2.3 (search excerpt, page not opened)

    Exam provider page for TMMi Professional: 40 multiple-choice questions, a 65 percent pass mark, 60 or 75 minutes, model v2.0 and syllabus v2.3, and the end of Release 1.3 exams. · Checked 2026-10-25

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  31. Market practice

    ISTQB Certified Tester Advanced Level Test Management Syllabus v3.0 (PDF) ↗ — International Software Testing Qualifications Board (ISTQB) · Section 1.5.2 (printed page 39): TMMi has five maturity levels and, except for level 1, test process areas, goals and practices; TPI NEXT has 16 key areas with four maturity levels each, checkpoints and a maturity matrix; model-based improvement can focus on project-level areas such as test planning and test design; version 3.0 of 2024-05-03, mirror copy of the publisher PDF, version checked against front matter, opened

    Version 3.0 syllabus (3 May 2024), read in full text. Used for the objective ids and levels, risk-based testing, the project test strategy, reporting, defect management, the four areas of competence and the cost of quality. It has no section on outsourced or distributed testing. Paraphrased, not quoted. · Checked 2026-11-07

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CTAL-TM v3.0, 3 May 2024), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    V52 opened the actual publisher PDF7 November 2026: version 3.0,3 May 2024 front matter,§§0.5–0.11, all substantivechapters 1–3/48 learning objectives and selectedreferences throughprintedp 71. Not every appendix or cited book. Earlier mirror access above is historical. Copyright does not establish unrestricted commercial figure copying.

  32. Market practice

    TMMi Guidelines for Test Process Improvement — Model 2.0 ↗ — TMMi Foundation · TMMi Model 2.0, June 2026,169-page primary PDF opened 6 November 2026 via normal web: §§2–3 and process areas 2.6/3.3/4.1–4.2/5.1–5.3; currentarea distribution 6/5/2/3. HistoricalR 1.0 examples remain separately scoped.

    TMMi Model 2.0, June 2026,169-page primary PDF opened 6 November 2026 via normal web: §§2–3 and process areas 2.6/3.3/4.1–4.2/5.1–5.3; currentarea distribution 6/5/2/3. HistoricalR 1.0 examples remain separately scoped. · Checked 2026-11-06

    Publisher primary source opened 6 November 2026. Model 2.0 was opened as 169-page PDF through normal web after a directdownload challenge; June 2026 is documentrelease month, not an invented exact release day. Source facts are paraphrased; no publisher image is redistributed.

  33. Market practice

    TMMi Documents — Model 2.0 and Release 1.3 retirement notice ↗ — TMMi Foundation · TMMi Foundation documents page, opened 6 November 2026: Model 2.0 and release notes; assessments/certifications based on Release 1.3 unavailable after 1 August 2027. Professional syllabus 2.2 training/exams notice is separate.

    TMMi Foundation documents page, opened 6 November 2026: Model 2.0 and release notes; assessments/certifications based on Release 1.3 unavailable after 1 August 2027. Professional syllabus 2.2 training/exams notice is separate. · Checked 2026-11-06

    Publisher primary source opened 6 November 2026. Version/date and use are scoped in applicability; fictional values remain labelled synthetic.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.