FMEA, risk workshops and other formal risk-analysis techniques
List the ways a feature could fail, rate how bad, how often and how hard to catch, and test the worst first. Learn FMEA, the risk priority number, risk workshops and their limits.
L1–L4 are part of the Pro pass
L0 Explain simply
Analogy: a home-safety walk-through. You walk through your home room by room. In each room you ask what could go wrong. A pan could catch fire in the kitchen. A heater could tip over in the hall.
For each worry you ask how bad it would be, how likely it is, and whether you would notice in time. A smoke alarm helps with the last question. Then you fix the worst worry first.
Daily List is a to-do list app. Nina wants reminders to work every time. Mei, the test lead, asks Tom, Leo and Sam to walk through the reminder feature the same way.
They list the ways it could fail. A reminder is never sent. A reminder is sent twice. A reminder comes an hour late after the clocks change. They rate each one and test the worst first. This method is called , or FMEA.
The picture has a limit. A house stays the same from week to week, and the ratings come from careful measurement. Software changes, and the ratings are the team's opinions.
(SYNTHETIC / TRAINING ONLY: Daily List and every person named in this lesson are invented.)
PLAIN WORDS · 1 in this section
- pan
- a wide cooking dish used on a stove
PICTURE IT
The picture is the one the lesson above opens with. The table below shows how each part of it matches the software.
THE REAL JOB Listing the ways a feature can fail, rating each one, and spending test time on the worst first.
- List the ways it can fail
- Rate bad, often and hard to catch
- Sort the table
- Act on the top rows and rate again
HOW THE PICTURE MAPS
| In the picture | In the software |
|---|---|
| Walking through each room | Walking through each part of the feature |
| What could go wrong in this room | A failure mode |
| How bad it would be | The severity rating |
| Whether the smoke alarm would warn you | The detection rating |
| Fixing the worst worry first | Sorting by the risk priority number |
WHERE THIS PICTURE STOPS
- A house stays the same. Software changes from release to release.
- A home check can use real measurements. The ratings in a table are opinions.
- A smoke alarm is one device. Detection in software can be many things at once.
HOOK
Walk each room, rate each worry, fix the worst first.
REMEMBER IT THIS WAY
A contrast: two neighbours told apart by one test.
Same , different risk. When two rows tie, read the severity rating first, because equal numbers can hide different rows.
| In the trick | What it stands for |
|---|---|
| Severity | how bad it would be |
| Risk priority number | Sorting by the risk priority number |
TELL A FRIEND
You walk through your home asking what could go wrong, how bad, how likely and whether you would notice, and you fix the worst first.
OFTEN MIXED UP WITH Risk-based test planning. That lesson is about using risk to plan the testing. This lesson is about the formal ways to find and rate the risks.
PRACTISE AND KEEP
Sources for this topic — 7 sources
- Market practice
failure mode and effects analysis (ISTQB glossary entry, study-site copy) ↗ — softwaretestpilot.com · The glossary entry describes failure mode and effects analysis as a systematic approach to risk identification and analysis of possible modes of failure, with an attempt to prevent them; a study-site copy (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number; read as a search excerpt only. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
How to Perform FMEA: Methodology and Worked Examples ↗ — Reliability magazine (reliamag.com) · Failure modes are rated for severity, occurrence and detection and multiplied into a risk priority number; the number has known weaknesses, and one automotive handbook moved to action priority tables (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number; read as a search excerpt only. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Risk register in testing (Yrkan) ↗ — Yrkan · A testing risk register rates likelihood and impact on small scales and ranks by the product; the scales are one blog's example, not a norm (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number; read as a search excerpt only. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
What is software risk analysis? (New Relic) ↗ — New Relic · A team lists what could go wrong, then sorts by likelihood and impact, with mixed attendance because people hold different mental models (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number; read as a search excerpt only. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Risk Priority Numbers (RPNs) ↗ — ReliaSoft XFMEA help · RPN is severity times occurrence times detection (FMEA) (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
International Software Testing Qualifications Board (ISTQB) Certified Tester Expert Level Test Management Syllabus (CTEL-TM) — 2011 release ↗ — International Software Testing Qualifications Board (ISTQB) · Expert Level 2011 syllabus, §6.3; full PDF opened 2026-10-24. Examples and recommendations are synthetic applications.
Opened the full 81-page PDF hosted by the American Software Testing Qualifications Board. The cover and revision history identify the 2011 release, dated 1 November 2011. Sections 2.3–2.4 support strategy selection and alignment; chapter 4 supports outside testing relationships. This is a study guide, not a claim that this site is accredited.
- Market practice
ISTQB Certified Tester Advanced Level Test Management Syllabus v3.0 (PDF) ↗ — International Software Testing Qualifications Board (ISTQB) · Section 1.3.5 (printed page 31): heavyweight techniques (hazard analysis, cost of exposure, FMEA and variants, fault tree analysis) are formal, with broad stakeholder groups and formulas; lightweight techniques (SST, PRAM, PRISMA) reduce factors to impact and likelihood on ordinal scales; safety-critical systems often use heavyweight techniques; version 3.0 of 2024-05-03, mirror copy of the publisher PDF, version checked against front matter, opened
Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CTAL-TM v3.0, 3 May 2024), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.
V52 opened the actual publisher PDF7 November 2026: version 3.0,3 May 2024 front matter,§§0.5–0.11, all substantivechapters 1–3/48 learning objectives and selectedreferences throughprintedp 71. Not every appendix or cited book. Earlier mirror access above is historical. Copyright does not establish unrestricted commercial figure copying.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.