TOPIC 15/2126 MINNOT STARTED

Practice: control flow, data flow and maintainability analysis, as they are asked

Practise counting cyclomatic complexity, spotting anomalies in control flow and in the order of actions on a variable, and proposing maintainability fixes.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: proofreading a route plan. Before a delivery driver sets out, a planner checks the plan on paper. Does any road lead nowhere? Is there a loop with no exit? Does the plan say to drop off a parcel before it is picked up? No one needs to drive to find these faults. A planner also notes when two routes repeat the same stretch, which can be merged.

Tom is practising the Technical Test Analyst questions on . All three kinds are at the level called K3, which means apply. Some give a small graph or a list of decisions and ask for the . Some give the actions on a variable and ask which pattern is an anomaly. Some give a tool report and ask for a proposal to make the code easier to maintain. Mei, the test lead on the Daily List team, says to work them on paper. Daily List is a made-up to-do app.

This is practice only. It is not a certification from the board that sets the syllabus. It cannot predict a pass.

The picture has a limit. A route plan is short, but a program can be millions of lines.

(SYNTHETIC / TRAINING ONLY: Daily List and every person named in this lesson are invented.)

PLAIN WORDS · 3 in this section
proofreading
reading closely to find mistakes before printing
cyclomatic
a count of the independent paths through code
syllabus
the list of topics a course covers

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the software.

THE REAL JOB Proofreading a delivery route plan: roads that lead nowhere, loops with no exit, parcels dropped off before pickup, and repeated stretches.

  1. Dead end and routes
  2. Wrong order
  3. Repeated stretch
A route plan

HOW THE PICTURE MAPS

How each part of the picture matches the software
In the pictureIn the software
A road that leads nowhereUnreachable code
A count of separate routes through the townCyclomatic complexity
Dropping off a parcel before picking it upA data flow anomaly
Two routes sharing a stretchRepeated code to merge

WHERE THIS PICTURE STOPS

  • A route plan is short, but a program can be millions of lines.
  • A planner sees every road, but a tool may not know whether a path is possible.
  • Count graph outdegree and short-circuit conventions. A multiway node is not the same as one binary decision.

HOOK

Dead end, routes, wrong order, repeat.

TELL A FRIEND

Think of proofreading a route plan: dead ends, a count of routes, a parcel dropped off before pickup and repeated stretches.

OFTEN MIXED UP WITH Static analysis: control flow, data flow and maintainability. The earlier lesson teaches the three kinds of analysis. This lesson shows how they are counted and asked.

PRACTISE AND KEEP

Sources for this topic — 5 sources
  1. Market practice4.0, 30 June 2021

    ISTQB CTAL-TTA syllabus ↗ — International Software Testing Qualifications Board · 4.0, 30 June 2021; publisher source opened 7 November 2026; Operative chapters1–6 selected full topic-related sections, printed pp11–53; front matter/legal/LO lists. Not every introductory/bibliographic page or external referenced work read.

    Keep 2021 terminology and illustrative IEC61508 table edition; do not imply medical-device approval. MC/DC usually N+1 decision executions; exact independence needed. · Checked 2026-11-07

    Operative chapters1–6 selected full topic-related sections, printed pp11–53; front matter/legal/LO lists. Not every introductory/bibliographic page or external referenced work read. Independent source review completed before implementation. No figure reproduction rights inferred. See V48 Phase1 source ledger.

  2. Market practice4.0, 30 June 2021

    ISTQB CTAL-TTA syllabus ↗ — International Software Testing Qualifications Board · 4.0, 30 June 2021; publisher source opened 7 November 2026; Operative chapters1–6 selected full topic-related sections, printed pp11–53; front matter/legal/LO lists. Not every introductory/bibliographic page or external referenced work read.

    Keep 2021 terminology and illustrative IEC61508 table edition; do not imply medical-device approval. MC/DC usually N+1 decision executions; exact independence needed. · Checked 2026-11-07

    Operative chapters1–6 selected full topic-related sections, printed pp11–53; front matter/legal/LO lists. Not every introductory/bibliographic page or external referenced work read. Independent source review completed before implementation. No figure reproduction rights inferred. See V48 Phase1 source ledger.

  3. Market practice4.0, 30 June 2021

    ISTQB CTAL-TTA syllabus ↗ — International Software Testing Qualifications Board · 4.0, 30 June 2021; publisher source opened 7 November 2026; Operative chapters1–6 selected full topic-related sections, printed pp11–53; front matter/legal/LO lists. Not every introductory/bibliographic page or external referenced work read.

    Keep 2021 terminology and illustrative IEC61508 table edition; do not imply medical-device approval. MC/DC usually N+1 decision executions; exact independence needed. · Checked 2026-11-07

    Operative chapters1–6 selected full topic-related sections, printed pp11–53; front matter/legal/LO lists. Not every introductory/bibliographic page or external referenced work read. Independent source review completed before implementation. No figure reproduction rights inferred. See V48 Phase1 source ledger.

  4. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: Daily List and the people are invented. The items are original and are not taken from any real or sample paper.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

  5. Market practiceAugust1996 with attached errata

    NIST SP500-235 Structured Testing ↗ — National Institute of Standards and Technology · August1996 with attached errata; Front matter/errata and §4.1 printedpp23–25 (PDF42–44), binary/multiway/short-circuit counting; selected multiway discussion.

    Binary p+1 not decision-statement+1 universally. Multiway contributes outdegree−1; chosen graph scope matters. · Checked 2026-11-07

    Front matter/errata and §4.1 printedpp23–25 (PDF42–44), binary/multiway/short-circuit counting; selected multiway discussion. Independent source review completed before implementation. No figure reproduction rights inferred. See V48 Phase1 source ledger.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.