TOPIC 17/2124 MINNOT STARTED

Practice: where non-functional tests fit and the defects they find, as they are asked

Place non-functional tests in the life cycle, name the defects each test type finds, and give reasons to include three test types. Practice cannot predict a pass.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: building inspections during a house build. Some inspections come early, such as checking the plans for strength. Some come when the walls are up, such as checking the wiring. Some come at the end, such as running every tap at once. Each inspection looks for its own kind of fault. A fault of one kind is not caught by an inspection built for another.

Tom is practising two kinds of question on the quality characteristics for technical testing. The first asks at which stage of the a test type usually fits. The second gives a scenario and asks which defect a test type is expected to find. The scenario questions are at the level called K3, which means apply. Mei is the test lead on the Daily List team. She says the syllabus has no table of defect types. So they are read from what each test checks. Daily List is a made-up to-do app.

This is practice only. It is not a certification from the board that sets the syllabus. It cannot predict a pass.

The picture has a limit. A house is inspected once, but software is tested again after each change.

(SYNTHETIC / TRAINING ONLY: Daily List and every person named in this lesson are invented.)

PLAIN WORDS · 1 in this section
syllabus
the list of topics a course covers

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the software.

THE REAL JOB Planning inspections during a house build: early plan checks, wiring checks when the walls are up, and an all-taps test at the end.

  1. Plans early: static checks
  2. Taps last: whole system tests
  3. Shared pipe: coexistence
House inspections

HOW THE PICTURE MAPS

How each part of the picture matches the software
In the pictureIn the software
Checking the plans for strength before buildingStatic maintainability and portability reviews
Running every tap at once at the endReliability and performance tests on the whole system
A fault the tap test finds, such as low pressureA defect type expected from a test type
A neighbour on the same pipeCoexistence on a shared machine

WHERE THIS PICTURE STOPS

  • A house is inspected once, but software is tested again after each change.
  • A tap test shows pressure, but an app has many resources.

HOOK

Plans early, taps last, fault type, shared pipe.

TELL A FRIEND

Think of house inspections: plans early, wiring when walls are up and an all-taps test at the end.

OFTEN MIXED UP WITH Maintainability, portability and coexistence: why include each test. The earlier lessons teach each test type. This lesson shows how the stage, the defects and the reasons are asked.

PRACTISE AND KEEP

Sources for this topic — 3 sources
  1. Market practice4.0, 30 June 2021

    ISTQB CTAL-TTA syllabus ↗ — International Software Testing Qualifications Board · 4.0, 30 June 2021; publisher source opened 7 November 2026; Operative chapters1–6 selected full topic-related sections, printed pp11–53; front matter/legal/LO lists. Not every introductory/bibliographic page or external referenced work read.

    Keep 2021 terminology and illustrative IEC61508 table edition; do not imply medical-device approval. MC/DC usually N+1 decision executions; exact independence needed. · Checked 2026-11-07

    Operative chapters1–6 selected full topic-related sections, printed pp11–53; front matter/legal/LO lists. Not every introductory/bibliographic page or external referenced work read. Independent source review completed before implementation. No figure reproduction rights inferred. See V48 Phase1 source ledger.

  2. Market practice4.0, 30 June 2021

    ISTQB CTAL-TTA syllabus ↗ — International Software Testing Qualifications Board · 4.0, 30 June 2021; publisher source opened 7 November 2026; Operative chapters1–6 selected full topic-related sections, printed pp11–53; front matter/legal/LO lists. Not every introductory/bibliographic page or external referenced work read.

    Keep 2021 terminology and illustrative IEC61508 table edition; do not imply medical-device approval. MC/DC usually N+1 decision executions; exact independence needed. · Checked 2026-11-07

    Operative chapters1–6 selected full topic-related sections, printed pp11–53; front matter/legal/LO lists. Not every introductory/bibliographic page or external referenced work read. Independent source review completed before implementation. No figure reproduction rights inferred. See V48 Phase1 source ledger.

  3. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: Daily List and the people are invented. The items are original and are not taken from any real or sample paper.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.