Static analysis: control flow, data flow and maintainability
Find control flow and data flow anomalies, work out cyclomatic complexity, and propose ways to make code easier to maintain.
L1–L4 are part of the Pro pass
L0 Explain simply
Analogy: proofreading a map before a trip. You can check a map without driving. You may find a road that leads nowhere, a loop with no exit, or a bridge that is not on any road. You can also find a place where the map shows a rubbish bin used before it was put in place. Nobody had to make the trip to see that.
Daily List is a made-up to-do app. Mei, the test lead, asks Tom to check Leo's new reminder code with a tool before anyone runs it. Tom wants three things from the tool. He wants routes that make no sense, values that are used in the wrong order, and parts that will be hard to change later.
This is . It checks code without running it. The tool or a person looks at its form and structure.
The picture has a limit. A map has no moving parts, but code can behave in ways a read cannot predict.
(SYNTHETIC / TRAINING ONLY: Daily List and every person named in this lesson are invented.)
PLAIN WORDS · 1 in this section
- proofreading
- reading closely to find mistakes before printing
PICTURE IT
The picture is the one the lesson above opens with. The table below shows how each part of it matches the software.
THE REAL JOB Checking a map before a trip: spotting roads that lead nowhere, tools used before they are put out, and a town too tangled to cross.
- Dead ends and routes
- Order of use
- Tangles and repeats
HOW THE PICTURE MAPS
| In the picture | In the software |
|---|---|
| A road that cannot be entered from the starting point | Unreachable code, a control flow anomaly |
| A count of separate routes through a town | Cyclomatic complexity |
| A tool used before it was put out | A data flow anomaly, use before define |
| Two towns that share every road | High coupling; cohesion measures each part’s internal focus separately |
WHERE THIS PICTURE STOPS
- A map has no moving parts, but code can behave in ways a read cannot show.
- A map shows every road, but a tool may not know whether a path is possible.
HOOK
Dead ends, routes, order of use, tangles.
TELL A FRIEND
Think of proofreading a map before a trip: you can spot dead ends and tangles without driving.
OFTEN MIXED UP WITH Static analysis for testers: linters, scanners and quality gates. The earlier lesson shows the tools that run on every change. This lesson shows what the analysis finds and how to read it.
PRACTISE AND KEEP
Sources for this topic — 6 sources
- Market practice
ISTQB Certified Tester Advanced Level Technical Test Analyst (CTAL-TTA) Syllabus v4.0 ↗ — International Software Testing Qualifications Board (ISTQB) · Mirror copy of the publisher PDF (ISTQB syllabus CTAL-TTA v4.0, 30 June 2021), version checked against the document's own front matter, read in full text: section 3.2.1 (TTA-3.2.1, K3) control flow analysis, printed page 22: analysis of a control flow graph, usually by a tool; anomalies (badly designed loops with several entry points or no end, ambiguous call targets, wrong sequencing, unreachable code, uncalled functions)
Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CTAL-TTA v4.0, dated 2021-06-30 in its footer), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.
Specialist review 6 November 2026: Actual CTAL-TTA4.0 §3.3 dynamic-analysis body reviewed; no claim of a full-syllabus review. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.
- Market practice
ISTQB Certified Tester Advanced Level Technical Test Analyst (CTAL-TTA) Syllabus v4.0 ↗ — International Software Testing Qualifications Board (ISTQB) · Mirror copy of the publisher PDF (ISTQB syllabus CTAL-TTA v4.0, 30 June 2021), version checked against the document's own front matter, read in full text: section 3.2.2 (TTA-3.2.2, K3) data flow analysis, printed pages 22-23: the life of a variable (declared, defined, used, destroyed); three atomic actions (define, use, kill); anomalies (definition followed by definition or kill with no use, definition with no kill, use or kill before definition, use or kill after a kill); compilers and separate tools; false reports from infeasible paths; trouble with data structures and shared variables
Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CTAL-TTA v4.0, dated 2021-06-30 in its footer), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.
Specialist review 6 November 2026: Actual CTAL-TTA4.0 §3.3 dynamic-analysis body reviewed; no claim of a full-syllabus review. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.
- Market practice
ISTQB Certified Tester Advanced Level Technical Test Analyst (CTAL-TTA) Syllabus v4.0 ↗ — International Software Testing Qualifications Board (ISTQB) · Mirror copy of the publisher PDF (ISTQB syllabus CTAL-TTA v4.0, 30 June 2021), version checked against the document's own front matter, read in full text: section 3.2.3 (TTA-3.2.3, K3) improving maintainability, printed pages 23-24: poor code is harder to maintain; coding standards for naming, commenting, indentation and modularization; tools raise warnings, not defects; repeated code, coupling and cohesion metrics, class visibility and structural complexity; website tree balance; security checks such as code injection and cross-site scripting
Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CTAL-TTA v4.0, dated 2021-06-30 in its footer), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.
Specialist review 6 November 2026: Actual CTAL-TTA4.0 §3.3 dynamic-analysis body reviewed; no claim of a full-syllabus review. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.
- Market practice
Glossary of testing terms from the International Software Testing Qualifications Board (equivalence partition, equivalence partitioning, boundary value) ↗ — International Software Testing Qualifications Board (ISTQB) · Glossary entries for static analysis, cyclomatic complexity and data flow analysis (search excerpt, page not opened)
Seen as a search excerpt; the page was not opened. The authoring container could not resolve this publisher's host name when a fetch was tried on 12 October 2026 for related hosts, so this is a reachability gap and not a statement about the publisher. The glossary has an older and a newer version of the entry for equivalence partitioning; the newer one defines the partition rather than the technique.
- Simplified educational illustration
Payments Signal editorial teaching models — Payments Signal
What this simplifies: Daily List and its code are invented. Real tools use many more rules and report many more warnings.
Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.
- Market practice
ISTQB CTAL-TTA syllabus v 4.0 ↗ — International Software Testing Qualifications Board · ISTQB CTAL-TTA v4.0, 30 June 2021; publisher download opened 6 November 2026. Sections 2.4–2.8 and 3.2. Syllabus guidance does not substitute for a safety standard or the delivered build evaluation policy.
Version 4.0, 30 June 2021; front matter checked. Official download opened 6 November 2026. Paraphrased for teaching; no licence claim.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.