Answering a recall: reason codes and the answer clock
A recall is a request, but the answer is owed on a clock and in a code: what the beneficiary's bank must say, when, and what silence becomes.
L1–L4 are part of the Pro pass
L0 Explain simply
When you ask a shop to take back a parcel you sent by mistake, the shop cannot just stay silent. It owes you an answer, by a set day, with a reason you can read.
A bank payment works the same way. A recall is one bank asking another bank to give back a payment that has already settled. The bank that receives the request must reply, because silence is not a reply.
Take Riya, who pays her rent to Arjun twice by mistake. Bank Alfa sends a recall to Nordbank. Nordbank cannot take money out of Arjun's account on its own, so it asks Arjun. He is away and never answers.
Riya, Arjun, Bank Alfa and Nordbank are this site's teaching cast, and this story is SYNTHETIC / TRAINING ONLY.
The clock keeps running anyway. When the time is up, Nordbank still answers Bank Alfa. The answer is a no, and it carries a short code meaning my customer never replied. That code is NOAS.
A no that says why is more useful than a silence that says nothing. Every no carries a code like this, so the bank that asked knows what to tell its customer. The rest of this lesson covers those codes, the clock, and where the three euro schemes differ.
PICTURE IT
A shop that must answer a take-back request
Picture a shop that sold a parcel to a customer. The shop's head office gets a note from another shop: please ask your customer to give the parcel back, it was sent twice by mistake. The head office cannot take the parcel from the customer's house. It can only ask.
A rule says the head office must answer the other shop by a set day. If the customer says yes, the parcel goes back with a slip that says it follows your request. If the customer says no, the head office writes back with a short code that says why.
If the customer never answers, the day still arrives. The head office then writes back with a code that means no reply from the customer. A different drawer of codes is used when the other shop asks whether a parcel ever arrived, and that drawer has its own rules.
THE REAL JOB A recall answer gives the asking bank a clear, timely and coded reply, so it can tell its own customer what happened.
- A recall arrives from the originator's bank
- The bank asks its customer
- Customer agrees:
pacs.004(payment return) with reasonFOCR - Customer refuses:
camt.029(resolution of investigation) with a reason code - No reply by the deadline:
camt.029(resolution of investigation) withNOAS
HOW THE PICTURE MAPS
| In the picture | In the payment |
|---|---|
| The note from the other shop | A recall, the request for a settled payment back |
| The head office that must answer | The beneficiary's bank, which has to reply in the scheme's window |
| The customer who holds the parcel | The beneficiary, whose consent the bank needs |
| The parcel sent back with a follow-your-request slip | A pacs.004 return with the reason FOCR |
| The written no with a short code | A camt.029 (resolution of investigation) with a negative reason code |
| The code meaning no reply from the customer | The code NOAS |
| The other drawer of codes for did-it-arrive questions | RJNR and its precise reasons, which answer a claim of non-receipt |
WHERE THIS PICTURE STOPS
- A head office can choose its own day to answer. A bank cannot. The answer window comes from the scheme, and missing it is a breach of the rulebook.
- A shop answers by letter. A bank answers with a message in a set format, and the code must come from the scheme's code list. A free-text note is not enough.
- The picture has one scheme. Each of the three euro schemes has its own code guidance. The lists are not the same.
- A code can stand in for another. In some countries data protection rules lead a bank to use
CUSTwhereAM04is the plain reason. A code does not always show what the customer said. - The picture cannot show the money. In a real recall the funds sit in the customer's account, and only the customer's consent, or a law, moves them.
HOOK
A recall is never left unanswered.
REMEMBER IT THIS WAY
A rule of thumb: if you see this, think that.
Every recall gets an answer: yes is a return, no is a coded refusal, and silence becomes .
| In the trick | What it stands for |
|---|---|
| Yes is a return | a pacs.004 (payment return) with the reason FOCR |
| No is a coded refusal | a camt.029 (resolution of investigation) with a reason code such as CUST |
| Silence becomes NOAS | a negative answer with the no-response code when the customer never replies |
In the SEPA Credit Transfer guidance the codes RJNR, RNPR and ARJT sit in the answer to a claim of non-receipt, not a recall, so this rule does not cover them.
TELL A FRIEND
A bank that is asked for money back must answer by a set day. Yes sends the money back, no comes with a code, and a customer who says nothing still gets a no with its own code.
OFTEN MIXED UP WITH R-transactions: reject, return, recall. The R-transactions lesson shows the three families and says a recall may be refused. This lesson is about the refusal itself: its codes, its clock and the answer a silent customer produces. It also keeps the claim-of-non-receipt codes apart from the recall codes.
Sources & standards — 1 source
- Scheme-specific ruleversion 4.1 (EPC131-17)
Clarification paper on SEPA Credit Transfer and SEPA Instant Credit Transfer rulebooks ↗ — European Payments Council · Beneficiary bank must send a negative answer with the no-response reason when the customer does not reply within the answer window
Current EPC landing page and PDF opened on 5 November 2026. Version 4.1 applies to the 2025 SCT and SCT Inst rulebooks. Only section 2.7 changed the address deadline. Section 2.13 covers transfer back; section 3.1 is specifically the ordinary SCT return clarification.
CURRENT AS CHECKED
3 FIGURES
EPC SEPA Credit Transfer scheme — R-transaction time limits
Under the scheme rulebook a reject travels at the latest on the next banking business day. A return is sent by the beneficiary's bank within three banking business days after settlement. A recall citing duplicate sending or a technical problem has a shorter initiation window, which the sources read give as ten banking business days of execution, while a fraud-motivated recall and the separate request-for-recall procedure reach back thirteen months. The beneficiary's bank must answer a recall, with funds or a refusal, within fifteen banking business days.
Every count runs in banking business days, so closing days stretch each deadline in real time. Conflicting excerpts disagree on which rulebook version the ten and fifteen banking business day recall windows come from. An October 2025 EPC clarification paper gives ten banking business days for a duplicate or technical-problem recall. A page on the instant scheme says the 2025 rulebook extended that from ten to fifteen. The excerpts do not settle which figure applies to which scheme, so check the current EPC SEPA Credit Transfer rulebook before relying on those two figures.
CHECKED 2026-10-11RECHECK BY 2026-11-30
Sources & standards — 2 sources
- Scheme-specific rule2025 version 1.2 (EPC125-05)
2025 SEPA Credit Transfer rulebook version 1.2 (EPC125-05) ↗ — European Payments Council · Section 4.3.2 — reject, return and recall time limits, and the separate request-for-recall procedure
Version 1.2 formally replaced version 1.1 at its publication on 30 September 2026 (the European Payments Council's wording, seen as a search excerpt; the page was not opened). Its change is limited to the address-message elements: the previously planned end date for unstructured addresses is delayed, unstructured addresses remain supported beyond 15 November 2026, and the EPC will set a new end date later. The EPC states that version 1.2 makes no other business or operational rule changes compared with version 1.1.
Follow-up 7 November 2026 for shared authored sponsor flow only: actual current publication page read plus selected v1.2 PDF printed pages 23–29 (sections 3.1–3.6, 4.2 and 4.3.1). Intermediaries do not modify scheme PSP obligations; bilateral/CSM arrangements and cutoff boundaries are distinct. This is not a complete 150-page read or visual/field-profile certification.
- Scheme-specific rule2025 version 1.2 (EPC004-16)
2025 SEPA Instant Credit Transfer rulebook version 1.2 (EPC004-16) ↗ — European Payments Council · Exception handling — cited for the Recall and the Request for Recall by the Originator, which the instant scheme also has, not for the reject or return limits this statement gives for SCT; not opened (the publisher's host is blocked), and whether the instant rulebook has a Return at all is recorded as undetermined in sourcing negative epc-sct-inst-return-procedure
Version 1.2 formally replaced version 1.1 at its publication on 30 September 2026 (the European Payments Council's wording, seen as a search excerpt; the page was not opened). The change is limited to address-message elements and delays the previously planned end date for unstructured addresses. The EPC states that no other business or operational rules changed compared with version 1.1.
Selected primary follow-up7November2026: actual EPC004-16 2025v1.2 PDF, issued/effective30September2026, operative4.2.1–3A–D/fn14,4.3.1 and4.3.2.1–4 read. Successful checks require reservation; formal debit follows Originator PSP receipt of positive confirmation; beneficiary availability follows certainty of delivery to its CSM. Restoration lifts the reservation while settlement certainty continues until confirmation; late-positive notice is required and further action is outside the Scheme.
Recall and RFRO have distinct grounds and authorisation rules. Not all142pages, AnnexIII, licensed implementation guidelines, private CSM profiles or reproduction permission. Prior search-only release-history note remains historical.
Re-checked 12 November 2026: 2025 SCT Inst rulebook version 1.2 remains the edition in effect; published/effective 30 September 2026; unstructured-address end date removed with no replacement yet.
SCT scheme inquiry and Recall response windows—current reviewed rulebook, not every customer remedy
The actual 2025 Rulebook v 1.2, issued/effective 30 September 2026, requires the beneficiary to answer the specified SCT inquiry within 10 Banking Business Days of receiving it. Under the same rulebook, the beneficiary PSP has 15 Banking Business Days to answer a Recall, counted from receipt of that Recall. The relevant claimed debit date must fall within 13 months before the originator submits the inquiry to its PSP. Nonreceipt, value-date correction and the specified status reminder have distinct conditions. Optional handling fees apply only to the stated positive nonreceipt/value-date responses. The rulebook’s inquiry/datasets do not by themselves certify every current ISO wire mapping.
CHECKED 2026-11-06RECHECK BY 2026-11-30
Sources & standards — 1 source
- Scheme-specific rule2025 version 1.2 (EPC125-05)
2025 SEPA Credit Transfer rulebook version 1.2 (EPC125-05) ↗ — European Payments Council · 2025 SCT Rulebook v1.2, issued and effective 30 September 2026: §4.4.1–4.4.4 and DS09–11 (AT-Q001–Q012) for inquiries; §4.3.2.3 for Recall responses.
Version 1.2 formally replaced version 1.1 at its publication on 30 September 2026 (the European Payments Council's wording, seen as a search excerpt; the page was not opened). Its change is limited to the address-message elements: the previously planned end date for unstructured addresses is delayed, unstructured addresses remain supported beyond 15 November 2026, and the EPC will set a new end date later. The EPC states that version 1.2 makes no other business or operational rule changes compared with version 1.1.
Follow-up 7 November 2026 for shared authored sponsor flow only: actual current publication page read plus selected v1.2 PDF printed pages 23–29 (sections 3.1–3.6, 4.2 and 4.3.1). Intermediaries do not modify scheme PSP obligations; bilateral/CSM arrangements and cutoff boundaries are distinct. This is not a complete 150-page read or visual/field-profile certification.
EPC SCT, SCT Inst and OCT Inst - the recall answer window and the no-response answer
Under the scheme guidance, the must answer a Recall, or a Request for Recall by the Originator, within fifteen banking business days, counted from the banking business day after it receives the recall. For SCT and SCT Inst the guidance says a bank that does not answer in that window is in breach of the rulebook.
For (OCT Inst) the guidance sets fifteen banking business days after the recall is received. If the beneficiary has not responded to its own bank within the window, the beneficiary's bank must send a negative answer with the reason for no response, coded NOAS. The SCT figure is also recorded in the SCT time-limits fact; this fact adds the instant schemes and the no-answer rule. The excerpts read disagree on whether ten or fifteen banking business days applies to which recall and which rulebook version, as the SCT time-limits fact records, so confirm the current figure with the European Payments Council (EPC) before relying on it.
CHECKED 2026-10-11RECHECK BY 2027-03-31
Sources & standards — 3 sources
- Scheme-specific ruleversion 4.1 (EPC131-17)
Clarification paper on SEPA Credit Transfer and SEPA Instant Credit Transfer rulebooks ↗ — European Payments Council · Clarification paper on the SCT and SCT Inst rulebooks - fifteen banking business days and the no-response negative answer (search excerpt, page not opened)
Current EPC landing page and PDF opened on 5 November 2026. Version 4.1 applies to the 2025 SCT and SCT Inst rulebooks. Only section 2.7 changed the address deadline. Section 2.13 covers transfer back; section 3.1 is specifically the ordinary SCT return clarification.
- Scheme-specific ruleversion 4.0 (EPC059-18), as shown in a search-result address dated October 2022
Guidance on reason codes for SEPA (Single Euro Payments Area) Instant Credit Transfer R-transactions ↗ — European Payments Council · Beneficiary PSP is in breach if it does not answer a Recall or RFRO within fifteen banking business days (search excerpt, page not opened)
Not opened. The European Payments Council's domain cannot be fetched from this authoring environment, and this session's web-search allowance was spent before this entry was written.
The address, title and version were taken from search results already recorded in this repository by a web-search check of 1 October 2026. That check recorded an excerpt saying AC03, invalid creditor account number, is a request for recall by the originator where the originator sent an instant payment to a wrong account number. Another repository note names version 7 of this guidance, so version 4.0 is probably not the latest.
A later version of the guidance may exist. Treat this entry as a route to the document, not as a reading of it.
- Scheme-specific ruleEPC237-22 version 2.1 (seen as a search excerpt; versions 1.0 and 2.0 also listed)
Guidance on reason codes for One-Leg Out Instant Credit Transfer R-transactions (EPC237-22) ↗ — European Payments Council · OCT Inst recall answer period of fifteen SEPA banking business days (search excerpt, page not opened)
Seen only as search excerpts from the publisher's domain; the PDF was not opened (host blocked). Label at most scheme-specific-rule.
PRACTISE AND KEEP
IMPLEMENTATION RESOURCES
68 RESOURCES
EVIDENCE AT ARM'S REACH
Apply the base message definition first, then the scheme or infrastructure profile that governs this topic.
An XSD checks XML structure. A usage guideline adds profile rules, conditional fields, code restrictions, and business controls. XSD-valid does not mean scheme-compliant.
CBPR+ usage guidelines
HVPS+ usage guidelines
SEPA Credit Transfer rulebook
SEPA Credit Transfer implementation guidelines
SEPA Instant Credit Transfer rulebook
SEPA Instant Credit Transfer implementation guidelines and XSDs
SEPA Direct Debit Core rulebook
SEPA Direct Debit Core implementation guidelines and XSDs
SEPA Direct Debit B2B rulebook
SEPA Direct Debit B2B implementation guidelines and XSDs
T2 functional specifications, validation rules, and binding XSDs
TIPS release specifications and professional-use documentation
CHAPS and RTGS ISO 20022 handbook and schema access
Fedwire Funds Service ISO 20022 implementation and technical documents
CHIPS ISO 20022 usage-guideline resources and rules
pacs.004 payment return — raw XML
camt.056 payment cancellation request — raw XML
camt.029 resolution of investigation — raw XML
MX cancellation, return, reversal, and investigation lifecycle — ZIP pack
MT103 /RETN/ convention → pacs.004 implementation mapping
MT192 → camt.056 implementation mapping
MT196 → camt.029 implementation mapping
MT292 → camt.056 implementation mapping
MT296 cancellation answer → camt.029 implementation mapping
pacs.004 field matrix
camt.056 field matrix
camt.029 field matrix
Payment lifecycle test cases
T2 RTGS implementation pack field and process matrix
T2 RTGS implementation pack test cases
T2 RTGS implementation pack BA checklist
T2 RTGS implementation pack acceptance criteria
T2 RTGS implementation pack migration notes
T2 RTGS implementation pack restricted and release-specific gaps
TIPS instant-settlement implementation pack field and process matrix
TIPS instant-settlement implementation pack test cases
TIPS instant-settlement implementation pack BA checklist
TIPS instant-settlement implementation pack acceptance criteria
TIPS instant-settlement implementation pack migration notes
TIPS instant-settlement implementation pack restricted and release-specific gaps
CHAPS RTGS implementation pack field and process matrix
CHAPS RTGS implementation pack test cases
CHAPS RTGS implementation pack BA checklist
CHAPS RTGS implementation pack acceptance criteria
CHAPS RTGS implementation pack migration notes
CHAPS RTGS implementation pack restricted and release-specific gaps
Fedwire Funds Service implementation pack field and process matrix
Fedwire Funds Service implementation pack test cases
Fedwire Funds Service implementation pack BA checklist
Fedwire Funds Service implementation pack acceptance criteria
Fedwire Funds Service implementation pack migration notes
Fedwire Funds Service implementation pack restricted and release-specific gaps
CHIPS implementation pack field and process matrix
CHIPS implementation pack test cases
CHIPS implementation pack BA checklist
CHIPS implementation pack acceptance criteria
CHIPS implementation pack migration notes
CHIPS implementation pack restricted and release-specific gaps
CBPR+ implementation pack
SEPA credit-transfer implementation pack
SEPA direct-debit implementation pack
High-value payments implementation pack
T2 RTGS implementation pack
TIPS instant-settlement implementation pack
CHAPS RTGS implementation pack
Fedwire Funds Service implementation pack
CHIPS implementation pack
Sources for this topic — 9 sources
- Scheme-specific ruleversion 4.1 (EPC131-17)
Clarification paper on SEPA Credit Transfer and SEPA Instant Credit Transfer rulebooks ↗ — European Payments Council · Answers to a recall; negative answer with the no-response reason; non-binding guidance
Current EPC landing page and PDF opened on 5 November 2026. Version 4.1 applies to the 2025 SCT and SCT Inst rulebooks. Only section 2.7 changed the address deadline. Section 2.13 covers transfer back; section 3.1 is specifically the ordinary SCT return clarification.
- Scheme-specific rule2025 version 1.2 (EPC125-05)
2025 SEPA Credit Transfer rulebook version 1.2 (EPC125-05) ↗ — European Payments Council · Recall answer window and the beneficiary bank's breach
Version 1.2 formally replaced version 1.1 at its publication on 30 September 2026 (the European Payments Council's wording, seen as a search excerpt; the page was not opened). Its change is limited to the address-message elements: the previously planned end date for unstructured addresses is delayed, unstructured addresses remain supported beyond 15 November 2026, and the EPC will set a new end date later. The EPC states that version 1.2 makes no other business or operational rule changes compared with version 1.1.
Follow-up 7 November 2026 for shared authored sponsor flow only: actual current publication page read plus selected v1.2 PDF printed pages 23–29 (sections 3.1–3.6, 4.2 and 4.3.1). Intermediaries do not modify scheme PSP obligations; bilateral/CSM arrangements and cutoff boundaries are distinct. This is not a complete 150-page read or visual/field-profile certification.
- Scheme-specific rule2025 version 1.2 (EPC004-16)
2025 SEPA Instant Credit Transfer rulebook version 1.2 (EPC004-16) ↗ — European Payments Council · 2025 SCT Inst rulebook - Recall and Request for Recall by the Originator
Version 1.2 formally replaced version 1.1 at its publication on 30 September 2026 (the European Payments Council's wording, seen as a search excerpt; the page was not opened). The change is limited to address-message elements and delays the previously planned end date for unstructured addresses. The EPC states that no other business or operational rules changed compared with version 1.1.
Selected primary follow-up7November2026: actual EPC004-16 2025v1.2 PDF, issued/effective30September2026, operative4.2.1–3A–D/fn14,4.3.1 and4.3.2.1–4 read. Successful checks require reservation; formal debit follows Originator PSP receipt of positive confirmation; beneficiary availability follows certainty of delivery to its CSM. Restoration lifts the reservation while settlement certainty continues until confirmation; late-positive notice is required and further action is outside the Scheme.
Recall and RFRO have distinct grounds and authorisation rules. Not all142pages, AnnexIII, licensed implementation guidelines, private CSM profiles or reproduction permission. Prior search-only release-history note remains historical.
Re-checked 12 November 2026: 2025 SCT Inst rulebook version 1.2 remains the edition in effect; published/effective 30 September 2026; unstructured-address end date removed with no replacement yet.
- Scheme-specific rule2025 version 1.2 (EPC158-22)
2025 One-Leg Out Instant Credit Transfer rulebook version 1.2 (EPC158-22) ↗ — European Payments Council · 2025 OCT Inst rulebook - exception transactions on the euro leg
Version 1.2 formally replaced version 1.1 at its publication on 30 September 2026 (the European Payments Council's wording, seen as a search excerpt; the page was not opened). The change is limited to address-message elements and delays the previously planned end date for unstructured addresses. The scheme remains limited to its euro leg; institutions on the non-euro side are not scheme participants.
- Scheme-specific ruleversion 6.0 (EPC135-18), as shown in a search-result address dated November 2024
Guidance on reason codes for SEPA (Single Euro Payments Area) Credit Transfer R-transactions ↗ — European Payments Council · EPC135-18 - RJNR with a precise reason; AM04 and CUST
Not opened. The European Payments Council's domain cannot be fetched from this authoring environment, and this session's web-search allowance was spent before this entry was written.
The address, title and version were taken from search results already recorded in this repository by the web-search verification in the July 2026 audit file. That check quoted the guidance as saying the cancellation request message is used for a recall and for a request for recall by the originator, with a resolution of investigation message as the negative answer and a payment return message as the positive answer. It also quoted the request-for-recall reasons as including a wrong unique identifier of the beneficiary account and a wrong amount.
A later version of the guidance may exist. Treat this entry as a route to the document, not as a reading of it.
- Scheme-specific ruleversion 4.0 (EPC059-18), as shown in a search-result address dated October 2022
Guidance on reason codes for SEPA (Single Euro Payments Area) Instant Credit Transfer R-transactions ↗ — European Payments Council · EPC059-18 - recall answer, breach and NOAS
Not opened. The European Payments Council's domain cannot be fetched from this authoring environment, and this session's web-search allowance was spent before this entry was written.
The address, title and version were taken from search results already recorded in this repository by a web-search check of 1 October 2026. That check recorded an excerpt saying AC03, invalid creditor account number, is a request for recall by the originator where the originator sent an instant payment to a wrong account number. Another repository note names version 7 of this guidance, so version 4.0 is probably not the latest.
A later version of the guidance may exist. Treat this entry as a route to the document, not as a reading of it.
- Scheme-specific ruleEPC237-22 version 2.1 (seen as a search excerpt; versions 1.0 and 2.0 also listed)
Guidance on reason codes for One-Leg Out Instant Credit Transfer R-transactions (EPC237-22) ↗ — European Payments Council · EPC237-22 - OCT Inst reason codes
Seen only as search excerpts from the publisher's domain; the PDF was not opened (host blocked). Label at most scheme-specific-rule.
- Simplified educational illustration
Payments Signal editorial teaching models — Payments Signal
What this simplifies: The shop and parcel picture compresses a recall into a take-back request, and the story uses fictional cast. The reason code details come from search excerpts of EPC guidance papers whose pages were not opened. The countries where data protection limits a code are not named because the excerpts did not name them, and the rulebook text should be read for any live decision.
Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.
- Scheme-specific ruleversion 6.0 (EPC135-18), as shown in a search-result address dated November 2024
Guidance on reason codes for SEPA (Single Euro Payments Area) Credit Transfer R-transactions ↗ — European Payments Council · Negative answers to a recall, including ARDT and LEGL (search excerpt, page not opened)
Not opened. The European Payments Council's domain cannot be fetched from this authoring environment, and this session's web-search allowance was spent before this entry was written.
The address, title and version were taken from search results already recorded in this repository by the web-search verification in the July 2026 audit file. That check quoted the guidance as saying the cancellation request message is used for a recall and for a request for recall by the originator, with a resolution of investigation message as the negative answer and a payment return message as the positive answer. It also quoted the request-for-recall reasons as including a wrong unique identifier of the beneficiary account and a wrong amount.
A later version of the guidance may exist. Treat this entry as a route to the document, not as a reading of it.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.