TOPIC 04/1015 MINNOT STARTED

How long can you be down before it matters (operational resilience, DORA)

Supervisors stopped asking whether you had a control and started asking how long your service can be down before it does real harm — and who else is delivering it for you.

L1–L4 are part of the Pro pass

L0 Explain simply

Riya's rent is due today. She opens her banking app, and the service is down: it will not load.

Ten minutes later it still will not load. She calls the bank, and so does everybody else.

(SYNTHETIC / TRAINING ONLY — Riya, her bank and this outage are invented.)

Now ask what a supervisor should want to know. One question is whether the bank has the right controls and recovery arrangements: a second data centre, a tested recovery plan, a named owner for every server. Those are good questions, and they miss something.

They ask whether the bank was careful. They do not ask whether Riya can pay her rent.

The newer question is the second one. Not whether you had a control, but whether you can keep delivering the service — and how long you can be down before it matters. That is a different thing to prove, and it starts from the customer rather than from the equipment.

There is a harder half. Riya's bank may be running perfectly and the app may still be dark, because the thing that failed belongs to somebody else: a cloud provider, a card processor, a messaging network. And that somebody is very likely serving her bank's competitors too.

So the rest of this topic answers three questions. What a firm has to name and measure before anything breaks. What a severe but plausible scenario is, and why testing against one is not a fire drill. And what happens when hundreds of firms lean on the same handful of providers.

PLAIN WORDS · 1 in this section
outage
a time when a service is not working

PICTURE IT

A school canteen and the one depot that supplies it

Picture a school that promises every child a hot lunch. The head teacher does not start from the ovens. She starts from the child: lunch must reach the table, and if it is later than a certain time the children are harmed. She writes that limit down in a calm week. Then she lists what lunch depends on, down to the depot that delivers the food. She tests the plan with a day when that depot is shut. Many schools use the same depot, so the town's inspector can visit it directly.

THE REAL JOB makes a firm show it can keep a customer's service running through a disruption, within a limit it set in advance.

  1. Name the important business service
  2. Set its impact tolerance
  3. Map the dependencies, including suppliers
  4. Test severe but plausible disruption
The firm’s four tasks; supplier oversight is separate

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
Hot lunch reaching the childrenAn important business service, named from the customer's side rather than as a system
The latest time lunch can arrive before children are harmedThe impact tolerance, a length of time set before anything goes wrong
The written list of cooks, kitchen, food and depotThe mapping of people, premises, technology, information and third parties the service depends on
A rehearsal day when the depot is shutA severe but plausible scenario, harsh enough to teach and realistic enough to happen
One depot serving many schoolsA critical third party (UK) or critical information and communication technology provider (EU)
The town's inspector visiting the depot itselfSupervisors examining the provider directly, with a Lead Overseer in the European Union
The school still owes lunch when the depot failsThe firm still owes customers the service; naming the supplier is no excuse

WHERE THIS PICTURE STOPS

  • A school has one lunch. A firm names many important business services, and each gets its own tolerance, so there is no single limit for the whole firm.
  • Being late is the only measure in the picture. A firm sets a length of time and other measures that fit. Harm can also mean risk to the financial system.
  • The head teacher decides alone who inspects the depot. In real life a named authority designates providers. In the United Kingdom the authorities write the rules but HM Treasury chooses the providers. So a rule in force does not mean a provider is yet supervised.
  • The picture is about food arriving. It does not show the check a firm owes before it signs with a provider, such as whether the provider would be easy to replace.
  • These service/tolerance terms describe the UK framework; DORA has its own definitions and scoped duties. Business continuity also includes maintaining service, not only recovery after failure.

HOOK

A tolerance is the edge, not the target.

REMEMBER IT THIS WAY

A sequence: the real steps, in order.

Name the service, set its tolerance, map dependencies, test disruption.

What each part of the trick stands for
In the trickWhat it stands for
Nameidentify the important business service from the customer’s perspective
Toleranceset how much disruption the service can tolerate
Dependenciesmap people, premises, technology, information and third parties
Testuse severe but plausible disruption scenarios

This recalls the firm’s work; direct oversight of critical providers is a separate regulatory responsibility.

TELL A FRIEND

asks how long a service can be down before customers are harmed, a limit the firm sets before anything breaks. The rules also reach shared providers, because one failing supplier can hit many firms at once.

OFTEN MIXED UP WITH The day the rail does not come back (contingency and recovery). Contingency and recovery is what operations do on the day a rail or hub is down. They declare an incident and work the backlog. is what a firm shows beforehand. It names the service that matters, how long it can fail, and what it depends on.

CURRENT AS CHECKED

3 FIGURES
  • United Kingdom operational resilience requirements for firms in scope of the FCA's and the PRA's 2021 policy

    The transitional period under the 's rules and the PRA's supervisory statement ended on 31 March 2025.

    By 31 March 2022 firms had to identify their important business services and set an for each. Mapping and scenario testing were required by that date only to the level of complexity needed to do those two things and to identify vulnerabilities.

    SYSC TP 10 then gave firms until 31 March 2025 to continue mapping and testing with a view to remaining within impact tolerances. From the end of the transition they must be able to remain within those tolerances through severe but plausible disruption. Reading the 31 March 2022 milestone as the completion date pulls that work three years early.

    CHECKED 2026-08-25RECHECK BY 2027-02-13

    Sources & standards — 1 source
    1. Regulatory guidance

      PS21/3 — Building operational resilience: feedback to CP19/32 and final rules ↗ — Financial Conduct Authority · The transitional provision SYSC TP 10 — mapping and scenario testing by 31 March 2022 only to the level of sophistication needed to identify important business services, set impact tolerances and identify vulnerabilities, and until 31 March 2025 to continue with a view to remaining within those tolerances; and the instrument's own commencement date of 31 March 2022

      The policy statement that introduced the United Kingdom's operational resilience regime for the firms the FCA supervises. It was published in March 2021 alongside the Bank of England's and the Prudential Regulation Authority's own statements and a shared policy summary.

      Cited for the framework's moving parts. Identify your important business services, and set an impact tolerance for each — the maximum tolerable disruption to that service. Map the resources it depends on, and test to the point of being able to stay inside the tolerance through a severe but plausible disruption. And for the dates by which firms had to have done each.

      Never cited for any firm's own tolerance, which is the firm's to set. · Checked 2026-08-24

      A policy statement records a decision and the rules made under it. The binding text is the authority's own handbook. There, an important business service is a service provided to clients which, if disrupted, could cause intolerable levels of harm to any one or more of them. It is also one that could pose a risk to the soundness, stability or resilience of the UK financial system or the orderly operation of the financial markets. And an impact tolerance is the maximum tolerable level of disruption to such a service.

      The authority's guidance is explicit that a recovery time objective is not an impact tolerance and should sit well inside it.

      Cited for the regime rather than as the obligation itself, which is why every citation to it here carries the regulatory-guidance label.

      This entry absorbs fca-operational-resilience, which registered the same policy statement at the same URL under a second id, a shorter title and a coarser publication date. Two ids for one document split its citations, so a correction lands on one and misses the other. The id kept is the one that names the document rather than the topic, because the FCA publishes more than one thing on operational resilience.

      The date is now the page's own: first published 29 March 2021, last updated 31 March 2022. The previous notes on both entries said the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). It can: the page was read at HTTP 200 on the access date, and the policy statement behind it carries the title above on its cover.

  • United Kingdom critical third parties oversight regime — Bank of England, PRA and FCA rules

    The United Kingdom's rules for critical third parties took effect on 1 January 2025, and they reach a provider only while an designation order is in force for it. Three authorities write the requirements; the designation that switches them on is a government decision, so a rulebook in force is not the same thing as any provider being supervised under it.

    CHECKED 2026-08-13RECHECK BY 2027-02-13

    Sources & standards — 1 source
    1. Regulatory guidance

      PS16/24 (FCA PS24/16) — Operational resilience: critical third parties to the UK financial sector ↗ — Bank of England, Prudential Regulation Authority and Financial Conduct Authority · PS16/24 and FCA PS24/16, published 12 November 2024: rules effective 1 January 2025, applying to a designated provider regardless of which firms and financial market infrastructures it serves

      The joint policy statement establishing the United Kingdom's oversight regime for critical third parties. Those are providers whose services large numbers of firms and financial market infrastructures depend on, and whose disruption or failure could threaten the stability of the UK financial system.

      Cited for the regime's shape: the requirements are made by the three authorities, the designation that switches them on is made by HM Treasury, and they apply to a provider regardless of which particular firms it serves. · Checked 2026-08-13

      Published on 12 November 2024 as PRA PS16/24 and FCA PS24/16, with a joint supervisory statement and three separate rule instruments, one from each authority. The rules took effect on 1 January 2025 and reach a provider only while a designation order is in force.

      The stated reason for the regime is concentration: firms and infrastructures have come to rely on a small number of third parties, and a regulator reading one firm's contracts cannot see that.

      Search excerpts only, page not opened: verified from web-search excerpts on the access date.

  • Regulation (EU) 2022/2554 — designation and oversight of critical ICT third-party service providers

    has applied since 17 January 2025. On 18 November 2025 the European Supervisory Authorities published a first list of 19 critical technology providers. Each of those providers now has a able to request information, investigate and inspect the provider directly, rather than its resilience being reachable only through each financial entity's own contract with it.

    CHECKED 2026-08-13RECHECK BY 2027-02-13

    Sources & standards — 2 sources
    1. Official requirement

      Regulation (EU) 2022/2554 on digital operational resilience for the financial sector (DORA) ↗ — European Union (EUR-Lex) · Application from 17 January 2025; Articles 31 onwards — designation of critical ICT third-party service providers, the Lead Overseer, and its powers of information, investigation and inspection

      The EU law that turns information and communication technology risk into a directly applicable obligation for financial entities, in application since 17 January 2025 across banks, insurers, investment firms, crypto-asset service providers and their technology suppliers.

      Its five subjects are ICT risk management, incident reporting, resilience testing, third-party risk and information sharing. Under them it requires an ICT risk-management framework, an ICT business continuity policy carried through documented response and recovery plans, and backup policies and restoration procedures.

      Cited here for the continuity half — Article 11 on response and recovery and Article 12 on backup and restoration — and for the testing frequencies attached to them.

      Cited too for the concentration assessment a firm owes before it contracts, and for the oversight framework that applies to providers the European Supervisory Authorities designate as critical. · Checked 2026-08-24

      A regulation rather than a directive, so it applies in the same words in every member state with no national transposition; the penalties for breaching it are still set by each member state's own law.

      It was published in the Official Journal on 27 December 2022, at OJ L 333. It enters into force on the twentieth day after publication, which is 16 January 2023, and its closing article states that it applies from 17 January 2025.

      The third-party chapter begins at Article 28. Article 29 makes a financial entity weigh, before contracting, whether the provider would be easy to swap and whether it already holds several arrangements with the same or closely connected providers. Articles 31 onwards carry the designation of critical providers and the Lead Overseer that follows it, with powers to request information, investigate and inspect the provider itself.

      The detail of threat-led penetration testing sits in a delegated regulation rather than in DORA itself, and is not quoted here.

      This entry absorbs eu-dora-regulation, which registered the same Regulation under a second id at the language-neutral form of the same ELI. One document registered twice splits its citations, so a correction lands on one copy and silently misses the other. The id kept is the bare short form, following eu-mica, which is how this registry names an acronym-titled EU instrument.

      The previous notes on both entries said the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). It can: the English text was read at HTTP 200 on the access date, and every claim above is read from it.

    2. Regulatory guidance

      The European Supervisory Authorities designate critical ICT third-party providers under the Digital Operational Resilience Act ↗ — European Supervisory Authorities (European Banking Authority, EIOPA and ESMA) · The first designation list, published 18 November 2025, and the four criteria applied to reach it

      The first designation of critical technology providers under DORA, published on 18 November 2025. And the four criteria it ran on: the systemic impact of a large-scale operational failure at the provider, the systemic importance of the financial entities relying on it, how concentrated that reliance is across the banking, insurance and securities sectors. And how easily the provider's services could be swapped.

      Cited for the fact of designation and for the criteria. Never cited for any named provider's arrangements. · Checked 2026-08-13

      The designation was assembled from the registers of information that financial entities have to keep under DORA, which is the mechanism that turns thousands of separate supplier relationships into a sector-wide picture of where reliance has piled up.

      An authorities' announcement rather than the rule: the designation power and its criteria are in the Regulation, and this document records that the power has been used and against how many providers.

      Search excerpts only, page not opened: verified from two independent web-search excerpts on the access date.

PRACTISE AND KEEP

Sources for this topic — 5 sources
  1. Regulatory guidance

    PS21/3 — Building operational resilience: feedback to CP19/32 and final rules ↗ — Financial Conduct Authority · Important business services, impact tolerances, mapping, and testing against severe but plausible disruption scenarios

    The policy statement that introduced the United Kingdom's operational resilience regime for the firms the FCA supervises. It was published in March 2021 alongside the Bank of England's and the Prudential Regulation Authority's own statements and a shared policy summary.

    Cited for the framework's moving parts. Identify your important business services, and set an impact tolerance for each — the maximum tolerable disruption to that service. Map the resources it depends on, and test to the point of being able to stay inside the tolerance through a severe but plausible disruption. And for the dates by which firms had to have done each.

    Never cited for any firm's own tolerance, which is the firm's to set. · Checked 2026-08-24

    A policy statement records a decision and the rules made under it. The binding text is the authority's own handbook. There, an important business service is a service provided to clients which, if disrupted, could cause intolerable levels of harm to any one or more of them. It is also one that could pose a risk to the soundness, stability or resilience of the UK financial system or the orderly operation of the financial markets. And an impact tolerance is the maximum tolerable level of disruption to such a service.

    The authority's guidance is explicit that a recovery time objective is not an impact tolerance and should sit well inside it.

    Cited for the regime rather than as the obligation itself, which is why every citation to it here carries the regulatory-guidance label.

    This entry absorbs fca-operational-resilience, which registered the same policy statement at the same URL under a second id, a shorter title and a coarser publication date. Two ids for one document split its citations, so a correction lands on one and misses the other. The id kept is the one that names the document rather than the topic, because the FCA publishes more than one thing on operational resilience.

    The date is now the page's own: first published 29 March 2021, last updated 31 March 2022. The previous notes on both entries said the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). It can: the page was read at HTTP 200 on the access date, and the policy statement behind it carries the title above on its cover.

  2. Regulatory guidance

    PS16/24 (FCA PS24/16) — Operational resilience: critical third parties to the UK financial sector ↗ — Bank of England, Prudential Regulation Authority and Financial Conduct Authority · The UK critical third parties regime: rules made by three authorities, designation made by HM Treasury

    The joint policy statement establishing the United Kingdom's oversight regime for critical third parties. Those are providers whose services large numbers of firms and financial market infrastructures depend on, and whose disruption or failure could threaten the stability of the UK financial system.

    Cited for the regime's shape: the requirements are made by the three authorities, the designation that switches them on is made by HM Treasury, and they apply to a provider regardless of which particular firms it serves. · Checked 2026-08-13

    Published on 12 November 2024 as PRA PS16/24 and FCA PS24/16, with a joint supervisory statement and three separate rule instruments, one from each authority. The rules took effect on 1 January 2025 and reach a provider only while a designation order is in force.

    The stated reason for the regime is concentration: firms and infrastructures have come to rely on a small number of third parties, and a regulator reading one firm's contracts cannot see that.

    Search excerpts only, page not opened: verified from web-search excerpts on the access date.

  3. Official requirement

    Regulation (EU) 2022/2554 on digital operational resilience for the financial sector (DORA) ↗ — European Union (EUR-Lex) · Chapter V — the concentration assessment before contracting, the designation of critical ICT third-party service providers, and the Lead Overseer

    The EU law that turns information and communication technology risk into a directly applicable obligation for financial entities, in application since 17 January 2025 across banks, insurers, investment firms, crypto-asset service providers and their technology suppliers.

    Its five subjects are ICT risk management, incident reporting, resilience testing, third-party risk and information sharing. Under them it requires an ICT risk-management framework, an ICT business continuity policy carried through documented response and recovery plans, and backup policies and restoration procedures.

    Cited here for the continuity half — Article 11 on response and recovery and Article 12 on backup and restoration — and for the testing frequencies attached to them.

    Cited too for the concentration assessment a firm owes before it contracts, and for the oversight framework that applies to providers the European Supervisory Authorities designate as critical. · Checked 2026-08-24

    A regulation rather than a directive, so it applies in the same words in every member state with no national transposition; the penalties for breaching it are still set by each member state's own law.

    It was published in the Official Journal on 27 December 2022, at OJ L 333. It enters into force on the twentieth day after publication, which is 16 January 2023, and its closing article states that it applies from 17 January 2025.

    The third-party chapter begins at Article 28. Article 29 makes a financial entity weigh, before contracting, whether the provider would be easy to swap and whether it already holds several arrangements with the same or closely connected providers. Articles 31 onwards carry the designation of critical providers and the Lead Overseer that follows it, with powers to request information, investigate and inspect the provider itself.

    The detail of threat-led penetration testing sits in a delegated regulation rather than in DORA itself, and is not quoted here.

    This entry absorbs eu-dora-regulation, which registered the same Regulation under a second id at the language-neutral form of the same ELI. One document registered twice splits its citations, so a correction lands on one copy and silently misses the other. The id kept is the bare short form, following eu-mica, which is how this registry names an acronym-titled EU instrument.

    The previous notes on both entries said the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). It can: the English text was read at HTTP 200 on the access date, and every claim above is read from it.

  4. Regulatory guidance

    The European Supervisory Authorities designate critical ICT third-party providers under the Digital Operational Resilience Act ↗ — European Supervisory Authorities (European Banking Authority, EIOPA and ESMA) · The first designation and the four criteria behind it: systemic impact of failure, systemic importance of the entities relying on the provider, concentration of that reliance, and substitutability

    The first designation of critical technology providers under DORA, published on 18 November 2025. And the four criteria it ran on: the systemic impact of a large-scale operational failure at the provider, the systemic importance of the financial entities relying on it, how concentrated that reliance is across the banking, insurance and securities sectors. And how easily the provider's services could be swapped.

    Cited for the fact of designation and for the criteria. Never cited for any named provider's arrangements. · Checked 2026-08-13

    The designation was assembled from the registers of information that financial entities have to keep under DORA, which is the mechanism that turns thousands of separate supplier relationships into a sector-wide picture of where reliance has piled up.

    An authorities' announcement rather than the rule: the designation power and its criteria are in the Regulation, and this document records that the power has been used and against how many providers.

    Search excerpts only, page not opened: verified from two independent web-search excerpts on the access date.

  5. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: Riya's outage and Larkpay's scenario are invented, and the scenario is deliberately reduced to one supplier so the point survives one reading; a real firm maps people, premises, technology, information and third parties for every service it has named. The three-part framing — service, tolerance, map — is this site's ordering of a set of obligations that regimes state in different sequences, and the United Kingdom and European Union are compared on one axis only, which leaves out both the incident-reporting and the testing machinery each of them also carries.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.