The morning after the bridge closes (writing a post-incident review)
A post-incident review is not a verdict. It is a short document that fixes the facts, lists what lined up to cause the harm, and ends in actions that someone owns.
L1–L4 are part of the Pro pass
L0 Explain simply
Maya Chen is a payments operations analyst at Bank Alfa. (SYNTHETIC / TRAINING ONLY — Maya, Bank Alfa, Nordbank and this night are invented.) Last night a software release left Bank Alfa's outgoing payments to Nordbank waiting in a queue. The ran, the release was rolled back and the queue drained. Service was back by one in the morning.
At nine the next day the work is not over. The team must write down what happened while people still remember it. That document is a , a written look back at an incident.
It has a plain job. It answers three questions. What happened, and in what order? What lined up so that it could happen? What will we change, and who will change it?
It is not a trial. Nobody is asked who to blame. The release was approved by sensible people who knew what they knew at the time. The review asks what made the release look safe, and why the queue alarm stayed quiet for forty minutes.
The result is a few pages: a timeline, a short list of factors and some actions with names and dates. A review that ends with no actions is only a story. A review that ends with owned actions is the start of a fix.
PICTURE IT
Watching the match tape
Picture a football team on the Monday after a lost match. The coach does not point at the player who missed the last pass. The team watches the tape in order, with the clock on screen. They note every moment where the match turned. Then they agree a few drills, with a name against each, for the next training session.
THE REAL JOB A fixes the facts of an incident, lists what lined up to cause the harm, and ends in actions that someone owns.
- Incident ends
- Build the timeline
- List contributing factors
- Write owned actions
- Review and share
- Track actions to done
HOW THE PICTURE MAPS
| In the picture | In the payment |
|---|---|
| The match tape with the clock on screen | The incident timeline, built from logs with one clock |
| The moments where the match turned | The contributing factors, usually several |
| A drill with a name and a date against it | A review action item with one owner and an end state |
| The rule that the tape is not a trial | The blameless approach, which asks why the system allowed it |
| The coach who makes sure the drills happen | The owner of the review, here Maya Chen, a payments operations analyst at Bank AlfaWho: Maya Chen |
| Checking next match that the drill worked | Checking that the action closed and the fault did not return |
WHERE THIS PICTURE STOPS
- A match has one referee and a clear result. A payment incident has no referee, and the harm is often spread over many customers.
- A match tape shows everything that happened. Logs may be missing or in different time zones, so the timeline needs care.
- A team can drop a drill and lose a game. A firm in some places has legal duties to learn from disruption and to tell its supervisor, which the tape picture does not show.
HOOK
Replay the tape, list the moments, name the drills.
REMEMBER IT THIS WAY
A chunk: a long list grouped so it is easier to hold.
Time, factors, actions, track.
| In the trick | What it stands for |
|---|---|
| Time | build the timeline from logs on one clock |
| factors | list the several conditions that lined up, with evidence |
| actions | write each with one owner, a date and an end state |
| track | follow the actions until they close |
The order is a guide: factors are often found while the timeline is still being built.
TELL A FRIEND
After an incident, write down what happened in order, list the several things that lined up, and give every fix an owner and a date.
OFTEN MIXED UP WITH Same fault, third night (problem management, root cause and the known-error record). A review looks back at one incident and lists its factors. A hunts the cause behind a pattern of incidents and stays open until that cause is gone.
CURRENT AS CHECKED
1 FIGURE
Eurosystem TARGET Services — the 27 February 2025 outage
In the incident of 27 February 2025, was unavailable for about 10 hours and T2S for about 8, while TIPS saw partial disruption of about an hour as a consequence. The cause was a hardware component failure affecting application-to-application communication. Contingency measures were activated in T2 to settle critical payments, and the Eurosystem ran crisis calls during the day. T2 resumed normal operation around 18:00, and the number and total value of payments settled that day came out comparable to previous days.
CHECKED 2026-08-13RECHECK BY 2027-08-13
Sources & standards — 1 source
- Market practice
TARGET Services incident of 27 February 2025 ↗ — European Central Bank (Eurosystem) · Duration by service, the hardware cause, the activation of contingency measures, resumption around 18:00, and the day's settled volumes and values
A topical paper in the ECB's market infrastructure and payments series, published in November 2025. It is a post-incident report rather than a rule: it describes one incident and requires nobody to do anything, which is why citations to it here carry the market-practice label.
Search excerpts only, page not opened: verified from web-search excerpts on the access date.
PRACTISE AND KEEP
Sources for this topic — 12 sources
- Market practice
Site Reliability Engineering: How Google Runs Production Systems — "Postmortem Culture: Learning from Failure" (book chapter) ↗ — Google (Betsy Beyer, Chris Jones, Jennifer Petoff, Niall Richard Murphy, eds.) · A review names contributing causes without blaming any individual or team; it starts from the view that everyone involved had good intentions and did the right thing with the information they had; an unreviewed postmortem might as well never have existed, and finished ones go in a shared repository (search excerpt, page not opened)
Freely published by Google at sre.google. Seen as a WebSearch excerpt on the access date; the page was not opened. A second entry, google-sre-book-postmortem-culture, holds the book-update copy of the same chapter.
- Market practice
Site Reliability Engineering: How Google Runs Production Systems — "Example Postmortem" ↗ — Google (Betsy Beyer, Chris Jones, Jennifer Petoff, Niall Richard Murphy, eds.) · A worked example with a minute-by-minute timeline, a cause that combines very high load with a resource leak, and an action-item table marking each item mitigate, prevent or process, with an owner and a bug number (search excerpt, page not opened)
Freely published by Google at sre.google. Seen as a WebSearch excerpt on the access date; the page was not opened.
- Market practice
The Site Reliability Workbook — "Postmortem Culture: Learning from Failure" ↗ — Google (editors Betsy Beyer, Niall Richard Murphy and others) · A good action item has an owner and a tracking number, a priority and a verifiable end state, and the strong example adds preventive fixes; without a formal tracking process action items are often forgotten; rewarding the writing of reviews without rewarding closure risks a poor cycle of reviews left open (search excerpt, page not opened)
Freely published by Google at sre.google. Seen as a WebSearch excerpt on the access date; the page was not opened. The wording of the points above is paraphrased from those excerpts.
- Market practice
Postmortem Action Items: Plan the Work and Work the Plan (login magazine, Spring 2017) ↗ — Magazine of the Advanced Computing Systems Association (written by Google engineers) · Three kinds of action item (mitigate the incident, repair its damage, prevent a repeat); a warning against items that only roll back the one change behind the outage; a prompt to ask whether detection or triage could have happened sooner (search excerpt, page not opened)
Seen as a WebSearch excerpt on the access date; the page was not opened.
- Implementation-specific
The Atlassian Incident Management Handbook — Postmortems ↗ — Atlassian (software company) · One firm's practice: a postmortem is always held for its top two severity levels and optional for minor incidents; one named person is accountable for finishing it; leadership approves it and prioritises its actions; people are referred to by role, and the question is why the system allowed an action (search excerpt, page not opened)
This is how one firm works, so it is cited as implementation-specific practice and not as a standard. Seen as a WebSearch excerpt on the access date; the page was not opened. The web page and the handbook PDF word some points differently; the numeric completion target in the PDF is deliberately not repeated on this site.
- Market practice
A guide from Etsy to running blameless reviews after incidents ↗ — Code as Craft blog of the online marketplace Etsy · A review meeting is a learning exercise and not a fixing exercise; teams arrive with a neat story already in mind and a pull towards a single root cause; the questions a facilitator asks shape what the team learns (search excerpt, page not opened)
A practitioner guide, not a standard. Seen as a WebSearch excerpt on the access date; the page was not opened.
- Market practice
Bank of England publishes independent review of real-time gross settlement (RTGS) outage (March 2015), with the Deloitte review and the Bank's response ↗ — Bank of England · The independent review traced the October 2014 outage to defects introduced in the changes for the liquidity saving mechanism and the contingency solution; a change the Bank treated as routine was not routine; the limits of switching to the contingency service were not widely understood; the Bank accepted all recommendations (search excerpt, page not opened)
An after-the-event report, not a rule, so it carries the market-practice label. Seen as a WebSearch excerpt on the access date; the page was not opened. The Deloitte report itself (a PDF edited for publication, on the Bank's site) was not opened.
- Market practice
TARGET Services incident of 27 February 2025 ↗ — European Central Bank (Eurosystem) · The Eurosystem's post-mortem report on the 27 February 2025 incident: two redundant ports failed at the same time on a storage control unit; the team first suspected a database fault; the contractual recovery time could not be met because extra integrity checks were needed; a 20-item action plan followed (search excerpt, page not opened)
A topical paper in the ECB's market infrastructure and payments series, published in November 2025. It is a post-incident report rather than a rule: it describes one incident and requires nobody to do anything, which is why citations to it here carry the market-practice label.
Search excerpts only, page not opened: verified from web-search excerpts on the access date.
- Market practice
Special Publication 800-61 Revision 3 of the US National Institute of Standards and Technology: Incident Response Recommendations and Considerations for Cybersecurity Risk Management ↗ — National Institute of Standards and Technology (US) · SP800-61r3 April2025: Table2 ID.IM-03 N3 pp19–20 describes recovery-conclusion lessons meetings; Table3 RC.RP-06 R1 p34 recommends an after-action report. Section2.1 also supports continuous learning. Actual sections read6 November2026.
Earlier access record: located through a WebSearch excerpt; the page was not opened in that pass. Its note incorrectly treated the recovery-meeting wording as r2-only.
V34 review, 6 November 2026: actual official r3 PDF§2.1/Figure2,§2.2 roles,§2.3 policies and the specific Table2 ID.IM-03 N3/ Table3 RC.RP-06 R1 entries read. Both continuous learning and formal recovery-conclusion review/report activities are supported. The historical r2 four-phase lifecycle remains separately scoped. Figure2 pixels were inspected privately.
- Scheme-specific rule
Financial Conduct Authority Handbook: Senior Management Arrangements, Systems and Controls, chapter 15A (Operational resilience) ↗ — Financial Conduct Authority · After scenario testing or a real operational disruption a firm in scope must carry out a lessons-learned exercise to find weaknesses, then make improvements that keep it within its impact tolerances, and record the exercise in its self-assessment (31 March 2022 text, search excerpt, page not opened)
Handbook extracts carry different snapshot dates; the excerpt seen was the 31 March 2022 version and the Handbook shows a later update to the chapter. Seen as a WebSearch excerpt on the access date; the page was not opened. Check the current text before relying on exact wording.
- Market practice
Operational resilience: insights and observations one year on ↗ — Financial Conduct Authority · Good practice builds lessons-learned exercises into business as usual from scenario testing and live incidents; a common gap is no recorded remediation actions, owners or target dates (search excerpt, page not opened)
Seen as a WebSearch excerpt on the access date; the page was not opened.
- Simplified educational illustration
Payments Signal editorial teaching models — Payments Signal
What this simplifies: Maya Chen, Bank Alfa, Nordbank, the release and the times in the story are invented. The set of review parts, the advice to keep one clock, the example actions and the questions to ask about a contributing factor are this site's summary of common practice, not text from any one body. Firms name and order the parts differently.
Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.