TOPIC 10/2122 MINNOT STARTED

Four plans of one payments system: process, function, application and technical

How a payments system is drawn in four plans, which question each plan answers, and how a platform stays up when a part fails.

L1–L4 are part of the Pro pass

L0 Explain simply

Bank Alfa is changing how it sends euro payments. Before anyone writes a line of code, the team draws the service. (SYNTHETIC / TRAINING ONLY. Bank Alfa, Nordbank, Riya, Arjun and Maya Chen are invented.)

Maya Chen works in payments operations at Bank Alfa. She joins the design review and holds up one drawing. Her question is plain. If Riya's rent payment to Arjun stops halfway, where does she look?

No single drawing can tell her. A drawing shows some things well and leaves the rest out. So the team draws the payment service in four plans. A restaurant needs the same set. It needs a plan of who serves whom and a list of its jobs. It needs a map of its equipment and a plan of its power, gas and spare parts.

The shows the steps of a payment, who does each step, and who hands it to whom. The lists the jobs the platform must do, such as checking a payment or sending it. It names the part that owns each job. The application plan shows the computer systems and how they talk to each other. The technical plan shows where those systems run, and what keeps them running when a machine or a line fails.

Each plan answers a different question. Who does what, and in what order? What must the platform do, and who owns each job? Which systems exist, and how do they connect? Where do they run, and what happens when one breaks?

Maya's question needs two of them. The process plan names the step and its owner. The names the machine.

Kept simple: banks draw these plans in many styles, and no scheme rule fixes them. This topic teaches one common way to split them.

The rest of this topic asks four things. What does each plan show for one real payment? How do systems pass work to each other? How do the plans fit together? And how does a payment platform keep going when a part fails?

PICTURE IT

A restaurant's four drawings

A restaurant owner keeps four drawings in the back office. The first shows the path of one order. The waiter takes it, the kitchen cooks it, the runner carries it out and the cashier bills it. The second lists the restaurant's jobs and names the station that owns each one. The third shows the equipment and the lines between it: the ordering tablets, the kitchen printer, the till and the card machine. The fourth shows the gas, the power, the water and the spare generator.

When a dish is late, the owner reads the first drawing to see who holds the order. When the card machine stops, the owner reads the third and the fourth. No single drawing helps with both.

THE REAL JOB A payments platform is described in four plans, and each plan answers one question about the platform.

  1. Who does what?
  2. What must it do?
  3. Which systems talk?
  4. Where do they run?
From a question to the plan that answers it

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The path of one orderThe process plan: steps, owners and hand-offs
The list of jobs and their stationsThe functional plan: jobs, with one owner each
Tablets, printer, till and the lines between themThe application plan: systems and interfaces
Gas, power and the spare generatorThe technical plan: servers, networks and spares
A second card machineA spare system that takes over when one fails
The owner who picks the right drawingThe reader who matches the question to the plan

WHERE THIS PICTURE STOPS

  • A restaurant is small, and one owner sees all four drawings. A payments platform has many teams, and a plan can fall out of date without anyone noticing.
  • An order is cooked in one building. A payment also crosses systems that other firms run, such as a clearing system, and those sit outside every plan of the bank.
  • A generator starts when someone flips a switch. A payment platform must switch to its spare within a time that the payment system sets.

HOOK

One question, one plan.

TELL A FRIEND

A payments platform is drawn in four plans. Each plan answers one question, and a payment can be followed through all four.

OFTEN MIXED UP WITH Payment engines and hub architecture. That topic opens one system and names its parts. This topic gives four ways to draw the whole service and says which question each way answers.

Sources & standards — 1 source
  1. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal · Bank Alfa, Nordbank, Riya, Arjun and Maya Chen are invented for teaching. The restaurant is a teaching picture.

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: Banks draw architecture in many styles. The four plans are a common teaching split and not a rule of any scheme or framework.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

CURRENT AS CHECKED

2 FIGURES
  • 2025 SCT Inst Rulebook version 1.2

    The 2025 Rulebook, in version 1.2 (published 30 September 2026 and still the edition in effect as checked 20 November 2026), sets a five-second target . It also sets a seven-second time-out for the confirmation to reach the CSM, and receipt of the confirmation by the originator PSP by the ninth second. Ten seconds is the outer deadline under the amended SEPA Regulation. If no confirmation has arrived at ten seconds, the originator PSP restores the payer account. A later positive or negative confirmation can still arrive and must be communicated.

    The timeline was set in version 1.0 and carried through version 1.1. The European Payments Council says version 1.2 has no impact on other business or operational rules compared with version 1.1. The rulebook page and the version 1.2 PDF cover were re-checked on 20 November 2026. The next regular SCT Inst rulebook is now due for publication in the second quarter of 2027 and takes effect no earlier than the end of the third quarter of 2028.

    CHECKED 2026-11-20RECHECK BY 2026-12-31

    Sources & standards — 1 source
    1. Scheme-specific rule2025 version 1.2 (EPC004-16)

      2025 SEPA Instant Credit Transfer rulebook version 1.2 (EPC004-16) ↗ — European Payments Council · 2025 v1.2 cover/effective 30 Sep 2026; sections 1.4 and 4.2.3 timing model; re-checked 20 November 2026: still in effect, no operational-rule change claimed vs 1.1; EPC SCT Inst page: next regular rulebook published Q2 2027, in effect end Q3 2028 at the earliest.

      Governs the SCT Inst scheme: execution time targets, timeout handling, round-the-clock availability, and r-transaction rules for instant euro credit transfers. · Effective 2026-09-30 · Checked 2026-11-12

      Version 1.2 formally replaced version 1.1 at its publication on 30 September 2026 (the European Payments Council's wording, seen as a search excerpt; the page was not opened). The change is limited to address-message elements and delays the previously planned end date for unstructured addresses. The EPC states that no other business or operational rules changed compared with version 1.1.

      Selected primary follow-up7November2026: actual EPC004-16 2025v1.2 PDF, issued/effective30September2026, operative4.2.1–3A–D/fn14,4.3.1 and4.3.2.1–4 read. Successful checks require reservation; formal debit follows Originator PSP receipt of positive confirmation; beneficiary availability follows certainty of delivery to its CSM. Restoration lifts the reservation while settlement certainty continues until confirmation; late-positive notice is required and further action is outside the Scheme.

      Recall and RFRO have distinct grounds and authorisation rules. Not all142pages, AnnexIII, licensed implementation guidelines, private CSM profiles or reproduction permission. Prior search-only release-history note remains historical.

      Re-checked 12 November 2026: 2025 SCT Inst rulebook version 1.2 remains the edition in effect; published/effective 30 September 2026; unstructured-address end date removed with no replacement yet.

  • European Payments Council (EPC) Single Euro Payments Area (SEPA) Credit Transfer (SCT) Inst scheme: availability and planned non-availability

    The Single Euro Payments Area () Instant rulebook makes its services available 24 hours a day on all calendar days, subject to the payment initiation channel. There is no cut-off time for a SEPA Credit Transfer (SCT) Inst transaction. A payment service provider may still set planned periods of non-availability, for example for planned maintenance or downtime.

    This wording was seen as a search excerpt of the rulebook only, and the rulebook page was not opened.

    CHECKED 2026-10-04RECHECK BY 2027-04-04

    Sources & standards — 1 source
    1. Scheme-specific rule2025 version 1.2 (EPC004-16)

      2025 SEPA Instant Credit Transfer rulebook version 1.2 (EPC004-16) ↗ — European Payments Council · Services available 24 hours a day on all calendar days, no cut-off time for a Single Euro Payments Area (SEPA) Credit Transfer (SCT) Inst transaction, and provider-set planned periods of non-availability for maintenance (search excerpt, page not opened)

      Governs the SCT Inst scheme: execution time targets, timeout handling, round-the-clock availability, and r-transaction rules for instant euro credit transfers. · Effective 2026-09-30 · Checked 2026-11-12

      Version 1.2 formally replaced version 1.1 at its publication on 30 September 2026 (the European Payments Council's wording, seen as a search excerpt; the page was not opened). The change is limited to address-message elements and delays the previously planned end date for unstructured addresses. The EPC states that no other business or operational rules changed compared with version 1.1.

      Selected primary follow-up7November2026: actual EPC004-16 2025v1.2 PDF, issued/effective30September2026, operative4.2.1–3A–D/fn14,4.3.1 and4.3.2.1–4 read. Successful checks require reservation; formal debit follows Originator PSP receipt of positive confirmation; beneficiary availability follows certainty of delivery to its CSM. Restoration lifts the reservation while settlement certainty continues until confirmation; late-positive notice is required and further action is outside the Scheme.

      Recall and RFRO have distinct grounds and authorisation rules. Not all142pages, AnnexIII, licensed implementation guidelines, private CSM profiles or reproduction permission. Prior search-only release-history note remains historical.

      Re-checked 12 November 2026: 2025 SCT Inst rulebook version 1.2 remains the edition in effect; published/effective 30 September 2026; unstructured-address end date removed with no replacement yet.

SEE THE PAYMENT MOVE

PICTURE THE JOURNEY

A tour office, a chalk board and a paper rollOpen to read the picture, how it matches the payment and where it stops.

PICTURE IT

A tour office, a chalk board and a paper roll

Asha Traders keeps a travel budget with a tour office. On the office wall hangs a board with one row for each company. Every row shows two figures: money booked and free to spend. The free figure is written in chalk and can be wiped. The booked figure changes only when the board keeper adds a numbered line to a paper roll. This morning the Asha Traders travel desk sends a list of staff trips to a trade fair abroad. A supplier abroad is paid for each trip. (SYNTHETIC / TRAINING ONLY: Asha Traders is invented.)

At the front desk, a receptionist checks that the list really came from the Asha Traders travel desk. The receptionist then copies each trip onto the office's one standard order card. After that, the front desk is finished. One booking clerk takes every card from there.

The clerk first checks that the card is complete: names, dates and every box filled. A card with a date that does not exist goes to a fix-it tray, where a person corrects it. Most are typing slips, so the card is held, not thrown away. If the same trip is already on the pile, the clerk refuses the second copy and tells Asha Traders. Nothing has been done yet, so this costs little.

Next the clerk checks the traveller and the partner office against the do-not-serve list. This comes before the board is touched. A close match sends the card to a review tray, where an officer decides. Nothing has been set aside, so waiting costs nothing to undo.

If the trip is priced in another country's money, the clerk converts it at the office's rate and writes the rate on the card. Then the board keeper wipes the free figure down in chalk, so the same money cannot be promised twice. The booked figure does not change. The chalk can be wiped off again with no line to cancel.

The clerk then works out the office's commission and writes who carries it: Asha Traders, the supplier abroad, or both. Only now does the keeper add a numbered line to the roll. The booked figure falls by the trip price plus the commission. The trip price goes to the office's payout row. The commission goes to the office's own earnings row. One line out, two lines in, and they balance.

Last, the clerk puts the card, with its commission note and rate, in the outgoing tray at the front door. The order goes to a partner office abroad, which passes it on to the supplier. The partner reads the commission note to see whether it may deduct its own cut.

THE REAL JOB Inside a bank, the checks, screens, converts, reserves, charges and posts a corporate payment before it sends any message.

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The travel desk sends a list of staff tripsAsha Traders, a business customer, sends a payment file of instructionsWho: Asha Traders
The receptionist checks who sent the listA channel such as the Electronic Banking Internet Communication Standard (EBICS) proves the sender
The one standard order card for each tripA structured instruction, one shape for parties, amount, currency and date
The booking clerk who takes every card through the stagesBank Alfa's payment engine, which runs each stage in turnWho: Bank Alfa
The clerk checks the card is completeValidation: mandatory fields and account formats are checked first
A card with an impossible date goes to the fix-it trayHeld for repair: an operator corrects the field, then validation runs again
A second copy of a trip already on the pile is refusedDuplicate caught: rejected before anything is screened, reserved or posted
The do-not-serve list is checked before the board is touchedSanctions screening comes before any funds are reserved
The review tray where an officer decides a close matchScreening hold: nothing moves further until the screening lifecycle answers
Converting a foreign price at the office's rateConversion between two currency codes; the rate rides in the message's exchange-rate field
The board keeper, who alone changes the boardThe core banking ledger, the bank's own book of accounts
Wiping the free-to-spend figure down in chalkEarmark: available balance falls, ledger balance stays, and no entry is needed to undo it
Working out the commission and who carries itFee calculation: the charge bearer is the payer, the payee or both
A numbered line on the roll lowers the booked figurePosting: debit the customer's account for the amount plus the fee
The trip price goes to the payout rowCredit the nostro (the bank's account at another bank) or clearing account for the amount
The commission goes to the earnings rowCredit the bank's charge income account for the fee
The outgoing tray at the front doorThe network gateway, where the bank's message leaves for the network
The card with its commission note and rateA pacs.008 payment message carrying the charge bearer, charges and exchange rate
The partner office abroad and the supplier it paysThe next bank and the payee, both beyond this flow's last step

WHERE THIS PICTURE STOPS

  • The picture shows one fixed order. No regulator or scheme publishes an order for these stages. Banks differ, for example in when they reserve funds and when they work out the fee.
  • A line on the roll is only the office's own bookkeeping, and an order leaving the front door settles nothing. Settlement, its finality and the money used are set by the scheme's own rules, which the picture cannot show. Taking an order back after it leaves needs a recall, which the picture does not draw.
  • The list check in the picture is a quick look. Real screening is its own lifecycle with its own set of answers, set out in the transaction-screening workflow. A hold there is the control working, not the payment breaking.
  • One clerk walks the card through every stage. A real bank splits these stages across several software parts, and many banks run more than one payment engine.
  • The commission note is one field on the message. Each later bank reads it to know whether to take its own cut, so one partner office understates a real chain of banks.

HOOK

Do the easy-to-undo steps first; the message leaves last.

REMEMBER IT THIS WAY

A rule of thumb: if you see this, think that.

Count the lines in a posting: one debit, two credits, and they balance.

What each part of the trick stands for
In the trickWhat it stands for
one debitdebit the customer's account for the amount plus the fee
first creditcredit the nostro or clearing account for the amount
second creditcredit the bank's charge income account for the fee

It misleads when the charge bearer is the payee or both, because the customer may not carry the whole fee.

TELL A FRIEND

Inside Bank Alfa, Asha Traders' payment is checked, screened, converted, reserved, charged and posted. Only then does a pacs.008 payment message leave for the network.

OFTEN MIXED UP WITH Payment engines and hub architecture. That topic asks how a bank builds its payment engines, as one hub or many. This flow follows one payment through the stages of a single engine.

PRACTISE AND KEEP

Sources for this topic — 10 sources
  1. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal · Bank Alfa, Nordbank, Riya, Arjun and Maya Chen are invented for teaching. The amount, the systems and their names are invented.

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: The four plans, the four engine shapes and the order of calls are this site's teaching model. No scheme rule or framework fixes them, and real banks name and split their systems in many ways.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

  2. Market practice

    The TOGAF Standard — Introduction: Definitions ↗ — The Open Group · The framework divides enterprise architecture into four domains (business, data, application, technology); an architecture view is a representation of a system from the perspective of a related set of concerns (search excerpts, page not opened)

    The Open Group's public definitions page for its enterprise architecture framework, TOGAF (The Open Group Architecture Framework). Cited for four points. The framework divides enterprise architecture into four domains: business, data, application and technology. An architecture view is a representation of a system from the perspective of a related set of concerns. A viewpoint sets the conventions for one kind of view. The word architecture has more than one meaning in the standard. Not cited for any rule that binds a bank. · Checked 2026-10-18

    Search excerpt, page not opened: returned by WebSearch on 2026-10-18. WebFetch could not reach the publisher from the authoring environment. Two searches returned the page. The current standard's wording differs from older versions, so the page and not this summary governs.

  3. Market practice3.2

    ArchiMate 3.2 Specification ↗ — The Open Group · Three core layers (business, application, technology) linked by the services one layer offers another (search excerpts of the 3.2 specification, page not opened)

    The Open Group's public page for ArchiMate, its modelling language for enterprise architecture. Cited for two points. The core layers are business, application and technology. The layers are linked by services that one layer offers to another. Not cited for any ArchiMate diagram or notation. · Checked 2026-10-18

    Search excerpt, page not opened: returned by WebSearch on 2026-10-18. WebFetch could not reach the publisher from the authoring environment. The same search returned older versions (1.0, 2.1, 3.0 and 3.1) of the specification, which were not used.

  4. Market practiceEdition 2, November 2022

    Standard 42010:2022 of the International Organization for Standardization (ISO), the International Electrotechnical Commission (IEC) and the Institute of Electrical and Electronics Engineers (IEEE): Software, systems and enterprise — Architecture description ↗ — International Organization for Standardization · An architecture description is organised into views; a viewpoint says which concerns a view is built to answer (ISO catalogue page seen; wording from secondary summaries as search excerpts; the standard was not read)

    The international standard on describing the architecture of systems and software. Cited for the idea that an architecture description is organised into views, and that a viewpoint says which concerns a view is built to answer. Not cited for any clause. · Checked 2026-10-18

    Search excerpt, page not opened: returned by WebSearch on 2026-10-18. WebFetch could not reach the publisher from the authoring environment. The ISO catalogue page was returned. The standard is paid for and was not read. The wording on views, viewpoints and concerns comes from secondary summaries on three outside sites, seen as search excerpts.

  5. Market practice

    Introduction to Integration Styles (Enterprise Integration Patterns) ↗ — Gregor Hohpe and Bobby Woolf · Four integration styles: File Transfer, Shared Database, Remote Procedure Invocation and Messaging; remote calls run in real time and can tie systems closely together, while messaging lets applications exchange data through a shared messaging system (search excerpts, page not opened)

    A page from the Enterprise Integration Patterns catalogue. Cited for the four ways applications can be joined: File Transfer, Shared Database, Remote Procedure Invocation and Messaging. Also cited for two points. Remote calls run in real time and can tie systems closely together. Messaging lets applications exchange data through a shared messaging system. · Checked 2026-10-18

    A book catalogue of patterns, not a standard. Search excerpt, page not opened: returned by WebSearch on 2026-10-18. WebFetch could not reach the publisher from the authoring environment. The Remote Procedure Invocation and Messaging pages of the same catalogue were also returned.

  6. Market practice

    Cloud Load Balancing overview (Google Cloud documentation) ↗ — Google Cloud · A load balancer distributes user traffic across multiple instances of an application; health checks probe backends so that requests go to healthy ones (search excerpts, page not opened)

    One provider's product documentation. Cited for two points. A load balancer distributes user traffic across multiple instances of an application. Health checks probe the servers so that requests go to healthy ones. Used as an example of the idea and not as a rule. · Checked 2026-10-18

    Vendor documentation, not a standard. Search excerpt, page not opened: returned by WebSearch on 2026-10-18. WebFetch could not reach the publisher from the authoring environment. The same search showed that when all servers are unhealthy, some balancers still send traffic to all of them. That behaviour is not used here.

  7. Market practice

    failover — Computer Security Resource Center glossary ↗ — National Institute of Standards and Technology · The capability to switch over automatically, typically without human intervention or warning, to a redundant or standby system upon the failure or abnormal termination of the previously active system (NIST glossary, citing SP 800-53 Rev. 5; search excerpt, page not opened)

    The glossary entry for failover. Cited for its wording: the capability to switch over automatically, typically without human intervention or warning, to a redundant or standby system upon the failure or abnormal termination of the previously active system. The entry names Special Publication 800-53, Revision 5, of the National Institute of Standards and Technology (NIST), as its source. · Checked 2026-10-18

    Search excerpt, page not opened: returned by WebSearch on 2026-10-18. WebFetch could not reach the publisher from the authoring environment. The glossary says its entries should not be viewed as official or preferred definitions for a given field.

  8. Market practice

    Execute the app as one or more stateless processes (The Twelve-Factor App) ↗ — The Twelve-Factor App methodology (12factor.net) · Processes are meant to hold no state between requests; data that must last belongs in a backing service, usually a database (search excerpts, page not opened)

    A page from a widely cited method for building software that runs as a service. Cited for one point: processes should hold no state between requests, and data that must last belongs in a separate backing service, usually a database. Not a payments source. · Checked 2026-10-18

    A practitioners' method, not a standard. Search excerpt, page not opened: returned by WebSearch on 2026-10-18. WebFetch could not reach the publisher from the authoring environment.

  9. Market practice

    Federal Financial Institutions Examination Council (FFIEC) IT Examination Handbook: Architecture, Infrastructure, and Operations booklet ↗ — Federal Financial Institutions Examination Council · Infrastructure should include resilience for physical and telecommunications elements; telecommunications components and providers should be chosen to help avoid a single point of failure, with route diversity as an example (search excerpts, page not opened)

    The booklet that guides United States bank examiners on architecture, infrastructure and operations, issued on 30 June 2021. Cited for two points. Infrastructure should include resilience for physical and telecommunications elements. Telecommunications components and providers should be chosen to help avoid a single point of failure, with route diversity as an example. · Checked 2026-10-18

    Search excerpt, page not opened: returned by WebSearch on 2026-10-18. WebFetch could not reach the publisher from the authoring environment. The search found no text on load balancing or fail-over in the booklet, so nothing is cited for them.

  10. Scheme-specific rule2025 version 1.2 (EPC004-16)

    2025 SEPA Instant Credit Transfer rulebook version 1.2 (EPC004-16) ↗ — European Payments Council · 2025 SCT Inst rulebook: timing targets and time-outs counted in seconds, and no routine closing time (see the dated facts beside this topic)

    Governs the SCT Inst scheme: execution time targets, timeout handling, round-the-clock availability, and r-transaction rules for instant euro credit transfers. · Effective 2026-09-30 · Checked 2026-11-12

    Version 1.2 formally replaced version 1.1 at its publication on 30 September 2026 (the European Payments Council's wording, seen as a search excerpt; the page was not opened). The change is limited to address-message elements and delays the previously planned end date for unstructured addresses. The EPC states that no other business or operational rules changed compared with version 1.1.

    Selected primary follow-up7November2026: actual EPC004-16 2025v1.2 PDF, issued/effective30September2026, operative4.2.1–3A–D/fn14,4.3.1 and4.3.2.1–4 read. Successful checks require reservation; formal debit follows Originator PSP receipt of positive confirmation; beneficiary availability follows certainty of delivery to its CSM. Restoration lifts the reservation while settlement certainty continues until confirmation; late-positive notice is required and further action is outside the Scheme.

    Recall and RFRO have distinct grounds and authorisation rules. Not all142pages, AnnexIII, licensed implementation guidelines, private CSM profiles or reproduction permission. Prior search-only release-history note remains historical.

    Re-checked 12 November 2026: 2025 SCT Inst rulebook version 1.2 remains the edition in effect; published/effective 30 September 2026; unstructured-address end date removed with no replacement yet.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.