The domestic leg: MT205 and MT205 COV
A same-country hop of an MT (message type)-era cover payment. A refused hop is loud at Meridian Bank. An not linked hop is silent at Nordbank.
L1–L4 are part of the Pro pass
L0 Explain simply
Use case: Asha Traders pays USD 250,000.00 to Northstar Components, a supplier abroad. Northstar Components banks with Nordbank. The money has not reached the bank account that backs the payment. Which short leg went wrong?
A sends the details and the money by two routes. The details go straight to Nordbank in an MT103 ( is short for Message Type), the Swift message that carries the customer's payment details. The money goes through banks in the dollar country. Its first leg is an MT202 COV, the bank-to-bank message that carries the funding. COV is short for cover. SYNTHETIC — TRAINING ONLY: Asha Traders, the banks and the people in this lesson are made up.
This lesson is about one short leg of the money, the final one in this story. Meridian Bank gets the cover from Bank Alfa. Nordbank keeps its dollar account at Cassia Bank, and Cassia Bank is in the same country as Meridian Bank. So Meridian Bank passes the cover on inside that country with an MT205 COV, a same-country onward cover message. It belongs to the older Swift message format. Since coexistence ended, it can still go through Swift's paid .
The leg is short and easy to overlook. If it is refused, nothing moves and the sender is told at once. If it goes through without its link back to the payment, money arrives and nobody can say whose it is. Both are holds, and a hold is the control doing its job.
Simplified: in the cover flow on this site, Cassia Bank is the . Here it services Nordbank's dollar account instead, an extra leg added for teaching. This lesson shows one refused leg and one not linked leg. A real bank follows the live Swift rules and its agreements. Refused and not linked are this academy's teaching names, not standard terms.
Check yourself. Meridian Bank's onward message was refused by the network. Has any money reached Cassia Bank? No. The first fact to check is which message was refused, and here it was the onward leg.
PICTURE IT
A parcel handed across town to the depot
A parcel arrives at a depot in a big town. The depot that serves the shop is across town, so a courier carries it there. The order slip is stapled to the parcel at every hand-off. The slip carries the order number of the first delivery note. That depot checks the slip against the note it already holds. A parcel with no slip is turned away at the door.
THE REAL JOB The MT205 COV carries a across the same-country hop and keeps the customer details and the link to the payment.
- The customer payment message goes straight to the beneficiary's bank
- The
MT202 COVreaches the first dollar bank - The
MT205 COVgoes across the same country :21:names the transfer being carried out- The beneficiary's bank joins the credit to the customer payment message
HOW THE PICTURE MAPS
| In the picture | In the payment |
|---|---|
| The courier carrying the parcel across town | The MT205 COV, the same-country onward cover message |
| The order slip stapled to the parcel | Sequence B, the group of fields with the customer details |
| The order number on the slip | The related reference :21:, which names the transfer being carried outWho: Meridian Bank |
| The delivery note held at the depot | The MT103, the customer payment message, held by the beneficiary's bankWho: Nordbank |
| The depot across town | The bank that services the beneficiary bank's accountWho: Cassia Bank |
| A parcel turned away at the door for having no slip | A NAK, the network's refusal, shown to the sender of the message |
WHERE THIS PICTURE STOPS
- A parcel can sit in a van. Here nothing travels. The money moves when an account is credited, and the picture cannot show whether that has happened.
- A slip is read by eye. A real bank screens the customer names with a system, and the checks differ by bank.
- The same-country rule and the cover flag rest on one reference site. The picture cannot show them and they need checking against the live Swift rules.
HOOK
Short hop, same slip: carry the link across.
TELL A FRIEND
A same-country hop of an old-format must carry the customer details and point back to the payment it serves. A refused hop is seen at once; one with no link shows up only at the far end.
OFTEN MIXED UP WITH MT2xx: moving the bank's own money. The plain MT205 carries a bank's own onward transfer with no customer payment behind it. The MT205 COV carries the cover for a customer payment and repeats the customer details in .
CURRENT AS CHECKED
2 FIGURES
Swift CBPR+ FI-to-FI payment instructions
Swift coexistence for in-scope -to-FI payment instructions ended on 22 November 2025; that deadline did not retire every MT reporting, initiation, investigation or correspondence message.
CHECKED 2026-10-11RECHECK BY 2027-01-05
Sources & standards — 2 sources
- Official requirement
ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence — 22 November 2025
Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.
- Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only
CBPR+ roadmap beyond November 2025 ↗ — Swift · Message-specific roadmap beyond November 2025
Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.
The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.
Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.
The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.
Swift post-November-2025 contingency processing
After coexistence, treatment differs by : some instructions are NAKed and selected messages can enter temporary , chargeable since 1 January 2026. This is not continued normal MT-MX coexistence.
CHECKED 2026-10-11RECHECK BY 2027-01-05
Sources & standards — 1 source
- Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only
CBPR+ roadmap beyond November 2025 ↗ — Swift · Post-coexistence NAK and contingency-conversion treatment
Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.
The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.
Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.
The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.
SEE THE PAYMENT MOVE
PICTURE THE JOURNEY
A gift of orange crates, two posted notes and a hub's tally boardsOpen to read the picture, how it matches the payment and where it stops.
PICTURE IT
A gift of orange crates, two posted notes and a hub's tally boards
A woman wants to give a large gift of crates of oranges to her sister, who lives in another country. She cannot carry them, so she asks her local packer to send them. The packer looks over the order and checks both names against a banned list. It then takes the crates from her store and counts them in its own stock.
Both packers keep their stock in one big cold store run by a hub firm. The hub keeps a tally board for each packer. Crates in this store never leave it. Giving crates from one packer to the other means the hub changes two numbers.
The woman's packer now posts two notes, and they take different roads. A post office holds each note safely and passes it on with the next van. The first note goes straight to the sister's packer. It names the giver and the sister, says how large the gift is, and carries an order number. It holds no crates.
The second note goes to the hub. It asks the clerk to lower one packer's tally and raise the other's by the same amount, for that order number. It repeats the two names, so the clerk can check them against a banned list as well.
The clerk changes the two numbers. No crate moves. The clerk then sends the sister's packer a slip, by the same post office. It says its tally went up for that order number.
At the sister's packer, a goods-received desk now holds the first note and the slip. It checks that the order number, the size of the gift and the names agree. Normally the packer hands the crates to the sister only then. The first note alone is not enough.
Some days go differently. The slip can arrive before the first note, so the desk keeps the new tally in an unnamed pile until the note turns up. The hub can keep a small handling share, so the slip shows fewer crates than the note. The desk then hands over only what arrived.
The order number can be missing from the slip, so the desk asks the sending packer which order it belongs to. The desk can also hand over crates before any slip arrives, but then it lends its own stock. Or the second note can be refused on the way, so the desk asks and the sending packer posts it again.
Suppose the woman finds out the order was a mistake or a trick. Her sister already has the crates, so her packer can only ask for them back. It sends a request to the sister's packer and another to the hub. If both agree, the crates come back by a fresh move, not by rubbing out the first.
THE REAL JOB A sends details straight to the and money through a correspondent; the bank matches both before it credits.
HOW THE PICTURE MAPS
| In the picture | In the payment |
|---|---|
| The woman who gives the gift | The ordering customer, who asks the bank to pay abroad |
| Her packer, who checks the order, screens the names and takes the crates | Bank Alfa validates, screens and debits the customer, then sends both messagesWho: Bank Alfa |
| The post office that stores and carries every note and the slip | Swift FIN, the network that stores each message and forwards it |
| The first note, posted straight to the sister's packer | The MT103 customer payment message, sent direct; it carries no money |
| The second note, asking the hub to change two tallies | The MT202 COV cover message, which asks the correspondent to move the money |
| The two names repeated on the second note | Sequence B of the MT202 COV copies customer names for every bank to screen |
| The hub, with a tally board for each packer | Meridian Bank, the correspondent that holds an account for each bankWho: Meridian Bank |
| The clerk changing two numbers while no crate moves | The book transfer: two balances change on the correspondent's books, and no cash travels |
| The slip saying the sister's packer's tally went up | The MT910 credit advice, which tells the beneficiary bank the money side is done |
| The goods-received desk that checks note, slip and order number | Cassia Bank, the beneficiary's bank, matches the payment message MT103 with the coverWho: Cassia Bank |
| The sister, who normally gets the crates only after the match | The beneficiary, normally credited only once instruction and money have matched |
| The slip comes first, so the tally rise waits in an unnamed pile | Cover first: funds wait as unapplied funds until the message MT103 clears repair |
| The hub keeps a handling share, so the slip shows fewer crates | A charge on the cover leg makes it short; the bank credits what arrived |
| The order number is missing from the slip | The cover does not quote the payment's reference, so the banks confirm by MT299 |
| The desk hands over crates before any slip arrives | Early credit: the beneficiary bank lends its own money until the cover settles |
| The second note was refused on the way, so the first note waits | Cover missing: the bank holds, asks by MT195, and the cover is reissued |
| The packer asks for the gift back with a request to each side | Recall: MT192 for the payment message MT103, MT292 for the cover leg |
WHERE THIS PICTURE STOPS
- The crates stand for balances. In the real payment no cash or goods travel. The correspondent changes two entries on its own books, and a message carries no value.
- The picture has one banned list. In the real flow every bank that touches either message screens it for itself, so one payment can be held at more than one point. A hold is the control working.
- The picture treats handing over early as a casual choice. In the real flow, crediting on the customer payment message
MT103alone is a lending decision. It is a bank's own policy choice, set inside an agreed limit, not a rule of the message. - The picture has the two packers simply agree. In the real flow a cancellation is only a request, and the receiving bank can refuse it. Money returns only as a new transfer that settles for itself, and the cover is never deleted.
- The picture has one hub and one route. Real cover chains can use several banks on each side, and a fee can come off along the way. This journey also shows the older Swift form. A companion journey shows the newer pair: the payment message
pacs.008and the cover messagepacs.009 COV.
HOOK
Two roads, one match: normally credit only when note and money meet.
REMEMBER IT THIS WAY
A contrast: two neighbours told apart by one test.
Ask which road a message is on. One road tells the , and the other moves the money through the correspondent.
| In the trick | What it stands for |
|---|---|
MT103 | the customer payment message, sent direct; it carries no money |
MT202 COV | the cover message, which asks the correspondent to move the money |
TELL A FRIEND
A sends the details straight to the and the money by another route. The receiving bank normally pays out only when the two match.
OFTEN MIXED UP WITH Serial versus cover routing. That topic tells serial from cover: in serial the instruction and the money travel together. This journey follows one , whose two halves must be matched, and the turns it can take.
PRACTISE AND KEEP
IMPLEMENTATION RESOURCES
21 RESOURCES
EVIDENCE AT ARM'S REACH
Apply the base message definition first, then the scheme or infrastructure profile that governs this topic.
An XSD checks XML structure. A usage guideline adds profile rules, conditional fields, code restrictions, and business controls. XSD-valid does not mean scheme-compliant.
PMPG correspondent-payment and reporting market practice
MT103 customer credit transfer — raw FIN
MT202 COV cover payment — raw FIN
MT205 financial institution transfer execution — raw FIN
MT910 credit confirmation — raw FIN
MT103 rejection convention — raw FIN
MT103 return convention — raw FIN
MT legacy and migration lifecycle — ZIP pack
MT103 → pacs.008 implementation mapping
MT202 COV → pacs.009 COV implementation mapping
MT205 → pacs.009 implementation mapping
MT103 /REJT/ convention → pacs.002 implementation mapping
MT103 /RETN/ convention → pacs.004 implementation mapping
MT910 → camt.054 implementation mapping
MT103 field matrix
MT202 COV field matrix
MT910 field matrix
MT205 field matrix
Payment lifecycle test cases
MT to MX migration notes
Sources for this topic — 7 sources
- Scheme-specific rule
Swift Standards MT (annual standards releases) ↗ — Swift · Category 2 - MT205 and MT205 COV: fields 20 and 21 mandatory, per a search excerpt of the Swift Category 2 guide (page not opened)
Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.
Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.
Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.
- Scheme-specific rule
MT to ISO 20022 conversion FAQ ↗ — Swift · Post-coexistence treatment: MT200, MT202, MT202 COV, MT205 and MT205 COV in contingency conversion; pacs.009 COV as the equivalent of the cover variants
Read on the access date through the Internet Archive's copy of the publisher's own URL, snapshot of 15 February 2026, at HTTP 200 and 25,816 bytes. That is stated because it matters: swift.com itself still could not be reached outright, returning HTTP 000 with no response at all, so the archive is the only route and the text is as it stood in February.
The previous note said a full-page fetch was unavailable. That half is still true of the live site and is now recorded with the evidence.
Every claim the entry already made survives the archived text, including the list of negatively acknowledged message types, which matches word for word. The set that is converted rather than rejected is added, because the entry named only the rejected half and a reader could reasonably have inferred the rest were unaffected.
One label is dropped. The entry called this the end of CBPR+ coexistence; the page never uses that term, and describes the scope as cross-border institution-to-institution payment instructions. The page's own words are used above.
- Market practice
prowide/prowide-core — a reader, writer and validator for SWIFT MT messages ↗ — Prowide (open source, Apache 2.0) · Generated MT205 and MT205 COV classes at the 2025 standards release: sequence A is the MT205 field list, sequence B is the MT202 COV sequence B
An implementation, not the standard. Swift's own standards releases are the authority and where the handbook and a library disagree, the handbook wins — the same relationship this registry already records for the Nacha, Fedwire and Australian batch-file implementations.
What it does not carry, and what is therefore not published from it: code values — what may legitimately appear in a form-of-credit, confirmation-instruction, partial-shipment or purpose field — and the network-validated rules that bind one field to another. Those live in the handbook, and their absence is the boundary that the login still enforces.
Cross-checked rather than taken alone: an independent bank-published standards-release guide states the same field count and the same count of mandatory fields for the issue-of-a-documentary-credit message, and names the same two fields as that release's additions.
Read again on 2026-10-17 by direct fetch of the raw source files: the header block classes, the trailer field list, the character set helper, the generated field classes 103 to 121 and the generated message classes. Block 1 gives application identifiers F, A and L, service identifiers 01 and 21, a four-character session number and a six-character sequence number. Input block 2 gives priority S, U or N, delivery monitoring 1, 2 or 3, and time limit 003 for urgent and 020 for normal.
Field 103 is named the FINCopy service code. The X, Y and Z lists are the implementation's reading of the User Handbook. These are comments in an implementation, not Swift's handbook. The library notes that, per Swift documentation, the time limit a sender types is ignored by the system. Where the handbook and the library differ, the handbook wins.
On 2026-10-25 the field classes Field22D, Field23S and Field44J were opened and read at raw.githubusercontent.com. So were the message classes MT300 (the foreign exchange confirmation), MT707 (the documentary credit amendment) and MT760 (the guarantee message). They gave these validation patterns: 22D 4!c, 23S 6!a, and for 44J a country code with optional subdivision of 35 and narrative of 65. They also gave the sequence structure of the MT300 (A to F with B1, B2, D1, E1, E1a, E1a1) and of the MT760 (A, B, C). They carry no code lists.
- Market practice
Standard SWIFT (the bank messaging network) ISO15022 — message type MT205 COV (cover) ↗ — iotafinance · MT205 COV scope: only to pass on a transfer tied to a cover-method customer payment, sender and receiver in the same country; COV code in block 3 field 119 (search excerpt, page not opened); corroborated for the MT 202 COV, with 202 and 205 COV validation, by paiementor.com cover-payment analysis and an IBM support note on {119:COV}
Known from a web-search excerpt only; the page was not opened. A third-party site, so every claim from it is single-source until Swift's Category 2 guide is read (see the sourcing negative swift-category-2-mt200-mt205-field-specifications). The search summary said itself that the details come from this site and not from Swift's documentation. That no field-level specification for sequence B of the MT205 COV (cover) was surfaced. Label market-practice at most.
- Market practice
PMPG Cover Payments Market Practice Guidelines — version 4.1.1, April 2026 ↗ — Swift / Payments Market Practice Group · Cover Payments Guidelines v4.1.1 April 2026, operative sections/FAQs read6November2026: per-leg funding/advice, correlation, MPG13 cancellation, early credit/WFSM and FAQ4 principal preservation; application depends on the stated case.
Public PDF opened on 5 November 2026. Edition 4.1.1, April 2026. Section 1.1 p7 distinguishes COV funding from camt.054 credit advice or camt.053 reconciliation at its creditor. Sections 1.1–1.2 distinguish pacs.009.001.08 ADV from COV. Sections 14–16 and FAQ1 explain policy-based early credit and an applicable wait-for-settlement agreement. Section 13 coordinates direct and cover cancellation and its footnote says an additional cover-chain request is not required. Market-practice guidance does not certify any bank implementation or replace effective usage guidelines.
- Official requirement
Swift Standards MT (annual standards releases) ↗ — Swift · FIN system messages - acknowledgements and error codes
Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.
Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.
Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.
- Simplified educational illustration
Payments Signal editorial teaching models — Payments Signal
What this simplifies: The two endings follow the cover flow on this site, with one added same-country hop. In the cover flow, Cassia Bank is the beneficiary's bank; here it services Nordbank's dollar account instead. The banks, the people and the fault are made up. The scope of the MT205 COV (same-country onward hop, never replaced by a plain MT205) rests on one reference site and the site's own MT205 record, because the publisher's Category 2 guide could not be opened. Which ending a real bank sees, which messages it accepts and what it charges follow the live Swift rules and the agreements between the banks. This lesson names no deadline and no fee.
Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.