Cheques and direct debits beside the credit: MT110-MT112 (status of a cheque stop request), MT256, MT104, MT107
Three side paths of the legacy corporate lifecycle: stop a cheque, learn a truncated cheque was not paid, and see how a debit is collected and why it needs a mandate.
L1–L4 are part of the Pro pass
L0 Explain simply
Use case — Asha Traders pays a supplier by cheque and then changes its mind, or a supplier collects money from Asha's account. Which older Swift messages deal with that, and what happens to the money?
A normal supplier payment is a push. The payer tells its bank to send money out. This topic covers two other things. A cheque is a paper promise to pay, so the money moves later, when the paper is presented. A is a pull. The person owed money asks to take it from the payer's account. SYNTHETIC / TRAINING ONLY: Asha Traders, Bank Alfa, Nordbank and Northstar Components are fictional.
Banks tell each other about these through Swift, the network that carries bank messages. Each message has a code. These codes belong to the older (Message Type) family. Bank-to-bank payment instructions have moved to , the newer message standard. Cheque and direct debit messages were not all retired at the same moment, so a reader can still meet them.
Cheque advice and stop. Bank Alfa issues a cheque for Asha. It tells the bank the cheque is drawn on, here Nordbank, with an MT110 (advice of cheque). If the cheque is lost, Bank Alfa sends an MT111 (request to stop payment). Nordbank answers with an MT112 (status of a request to stop paying a cheque).
Cheque not paid. Northstar Components pays in a cheque that is cleared as an image. Nordbank sends its details to Bank Alfa in an MT206 (). If Bank Alfa does not pay, it tells Nordbank with an MT256 (advice of non-payment of cheques).
Direct debit. Northstar asks its bank, Nordbank, to collect from Asha with an MT104 (direct debit). Nordbank orders the debit from Bank Alfa with an MT107 (). In this lesson Bank Alfa wants a mandate, the payer's saved permission, on file before it debits. With none, Asha's account is not touched.
A stop or a refusal to pay is a control working, not a system breaking. Each path leaves the money in a clear place. The rest of this topic names that place for every path, and links to the topics that explain each message in full.
PICTURE IT
A parcel counter with a notice board
A sender posts a notice to a parcel counter: a numbered parcel is coming. The sender may later ask the counter to hold it back. The counter answers whether it did. A parcel left at a drop-off point may be sent on to the counter. The counter may send word back that it was not accepted. Someone who arrives to collect a parcel for another person must show a signed permission slip that the counter already holds. A spoken claim is not enough.
THE REAL JOB These messages let banks tell each other about a cheque, ask to stop it or pull money, while the paying bank decides.
MT110informs: this cheque existsMT111asks: please refuse itMT112answers: here is what I didMT256reports to the truncated-cheque sender (MT206): it was not paidMT107(direct debit order) pulls: only if the mandate exists
HOW THE PICTURE MAPS
| In the picture | In the payment |
|---|---|
| The notice posted before the parcel | An MT110: the issuing bank tells the paying bank a cheque existsWho: Bank Alfa |
| A request to hold the parcel back | An MT111: a request to stop payment of the chequeWho: Bank Alfa |
| The counter says what it did with the request | An MT112: the paying bank reports the status of the stop requestWho: Nordbank |
| Word sent back that a parcel was not accepted | An MT256 telling the MT206 (cheque truncation message) sender the cheque was not paidWho: Bank Alfa |
| Someone arrives to collect for another person | An MT104 request to Nordbank, then an MT107 (direct debit message) order to Bank AlfaWho: Nordbank |
| The signed slip already held at the counter | The mandate: the payer's saved permission, which Bank Alfa wants on file in this lessonWho: Bank Alfa |
WHERE THIS PICTURE STOPS
- A counter can usually hold a parcel for as long as it likes. A bank can stop a cheque only if the stop arrives before the cheque is paid. A late stop is refused, and a recovery step starts.
- A parcel is a physical thing that sits in one place. A cheque is a promise on paper. The customer's money may have left the account when the cheque was issued, so money and paper are in two places.
- The picture shows no reason for the notice of non-payment. No source found lists the fields or a reason code of the
MT256(advice of non-payment of cheques), so the picture shows none.
HOOK
A stop is a request. A mandate is the proof.
REMEMBER IT THIS WAY
A contrast: two neighbours told apart by one test.
Ask whose account is asked to give, and who said yes. If the payer said yes in the message, it is a push; if the saved mandate said yes, it is a pull.
| In the trick | What it stands for |
|---|---|
| Push | the MT101 (request for transfer) and MT103 (customer credit transfer): the payer's side moves first |
| Pull | the MT104 and MT107 (both direct debit messages): the collecting side moves first, and the mandate is held outside the message |
A cheque is a paper promise, so the MT110 (advice of cheque), MT111 (stop request) and MT112 (stop status) follow the paper.
TELL A FRIEND
A is only a request until the paying bank says what it did. A is only a claim until the payer's saved permission is found.
OFTEN MIXED UP WITH MT101: the request for transfer. An MT101 is the payer asking its own bank to push money out, so the permission is the payer's own instruction. An MT104 is the person owed money asking to pull it, so the permission is a mandate held outside the message. Test question: whose account is being asked to give, and who said yes?
CURRENT AS CHECKED
4 FIGURES
Swift CBPR+ FI-to-FI payment instructions
Swift coexistence for in-scope -to-FI payment instructions ended on 22 November 2025; that deadline did not retire every MT reporting, initiation, investigation or correspondence message.
CHECKED 2026-10-11RECHECK BY 2027-01-05
Sources & standards — 2 sources
- Official requirement
ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence — 22 November 2025
Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.
- Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only
CBPR+ roadmap beyond November 2025 ↗ — Swift · Message-specific roadmap beyond November 2025
Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.
The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.
Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.
The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.
Swift post-November-2025 contingency processing
After coexistence, treatment differs by : some instructions are NAKed and selected messages can enter temporary , chargeable since 1 January 2026. This is not continued normal MT-MX coexistence.
CHECKED 2026-10-11RECHECK BY 2027-01-05
Sources & standards — 1 source
- Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only
CBPR+ roadmap beyond November 2025 ↗ — Swift · Post-coexistence NAK and contingency-conversion treatment
Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.
The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.
Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.
The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.
Swift FIN interbank MT101 relay
Swift's roadmap was due to discontinue the interbank (request for transfer) relay over (Swift's messaging network) by 14 November 2026. A CBPR+ (Cross-Border Payments and Reporting Plus) pain.001 relay was to replace it.
On 27 August 2026 Swift deferred that migration, alongside the rest of that year's payments changes, with no replacement date set. Swift has said an update is to follow; a bank page gives December 2026. Once coexistence ends, a single MT101 goes through chargeable and a multiple MT101 is NAKed.
The company-to-bank MT101 is a separate question. Corporates on (Swift's service for corporates) or a were never in that FIN deadline.
CHECKED 2026-08-27RECHECK BY 2027-01-05
Sources & standards — 2 sources
- Official requirement
Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Deferral of SR2026 payments changes, including the interbank MT101 relay retirement, and the promised update by December 2026
Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.
Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.
- Official requirement
Swift Standards MT (annual standards releases) ↗ — Swift · The original requirement now under deferral: interbank MT101 relay retirement date
Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.
Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.
Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.
Swift MT (message type) cheque and direct debit messages after the end of CBPR+ (Cross-Border Payments and Reporting Plus) coexistence
A May 2025 bank update found by search lists the messages (, MT107, MT204) and the cheque messages (MT110, MT111, MT112) as supported until a date defined by Swift. An October 2024 sheet from the same bank said no end date had been announced. A later search excerpt of the same bank update repeated the statement. A vendor blog (
ACI Worldwide) also reports no retirement date.A search excerpt of a Swift (Cross-Border Payments and Reporting Plus) roadmap places cheques and direct debits on a later timeline than payment instructions. No firm end date for these messages could be read from it. Pages were not opened.
CHECKED 2026-10-11RECHECK BY 2027-01-05
Sources & standards — 1 source
- Market practice
BNY (a large correspondent bank), Update on ISO 20022 end of co-existence (May 2025) ↗ — BNY · Cheque and direct debit messages continue to be supported until a date is defined by Swift (search excerpt, page not opened)
Known only from a search excerpt; the PDF was not opened. One bank, written before the November 2025 deadline. No newer Swift date was found.
SEE THE PAYMENT MOVE
PICTURE THE JOURNEY
A frame shop, a glass factory and a ledger hall with one card per officeOpen to read the picture, how it matches the payment and where it stops.
PICTURE IT
A frame shop, a glass factory and a ledger hall with one card per office
Picture a frame-shop owner who must pay a glass factory in another country for a load of glass. She keeps her money at her local cashier office. The glass factory keeps its money at a different cashier office abroad. The two offices have no direct dealings. Each keeps a balance card at a ledger hall, and a relay office carries notes between them.
She signs an order slip and hands it to her cashier office. The slip is only a request. The cashier checks that she may order and that her money is there. It also checks the and that no name is on a banned list. If the slip cannot be carried out, she hears in whatever way she and the office agreed. Otherwise the office takes the amount from her account and gives her a small slip that says one amount has left.
The office then writes the payment letter and hands it to the relay office. The relay office checks that the letter follows the printed form, keeps it safe until the next stop is ready and passes it on. It never touches a balance card. The ledger hall reads the letter and checks the names again for itself. Then it lowers her office's card and raises the glass factory's office's card. That entry is the moment the amount changes hands. The hall sends the glass factory's office a credit slip, and the payment letter follows through the relay office.
The glass factory's office checks the letter, matches it to the credit slip and adds the amount to the glass factory's account. Through the day the frame-shop owner receives a balance sheet and a list of entries, and at close a day statement. The ledger hall also sends each cashier office a copy of its own card, and the office compares that copy with its own book.
Several other turns are possible. If the ledger hall keeps a small handling fee, less glass money arrives. If the hall refuses the letter before it makes any entry, her office puts the amount back in her account. If the glass factory's office finds the account closed, it sends the amount back as a new payment the other way. If an office needs more detail, it posts a query note and waits for the reply. If the two copies of a card disagree, a clerk checks whether an entry is merely late or truly missing. If she asks for the amount back after the glass factory is paid, that is only a request, and the glass factory's office can refuse. (SYNTHETIC / TRAINING ONLY: the frame-shop owner and the glass factory are invented.)
THE REAL JOB A company pays a supplier abroad through its bank in the older Swift message format, with confirmations, reports, queries and returns.
HOW THE PICTURE MAPS
| In the picture | In the payment |
|---|---|
| The frame-shop owner signs an order slip for her cashier office | Asha Traders asks Bank Alfa to pay with the request message MT101Who: Asha Traders |
| The cashier checks her right to order, her money, the cut-off and the names | Bank Alfa validates the authority, funds, cut-off, routing and screeningWho: Bank Alfa |
| The office takes the amount and gives her a small slip | Bank Alfa debits Asha Traders; where agreed, MT900 confirms that one debitWho: Bank Alfa |
| The relay office checks the printed form, keeps the letter safe, passes it on | Swift FIN, the message network, checks the format and forwards messages; it holds no account |
| The payment letter that her office posts to the ledger hall | The customer payment message MT103 is the instruction, not the money |
| The ledger hall reads the letter and checks the names for itself | Meridian Bank validates and screens the payment for itselfWho: Meridian Bank |
| The hall lowers one office's card and raises the other's | Book transfer: Meridian Bank debits Bank Alfa's account and credits Nordbank's accountWho: Meridian Bank |
| A credit slip goes to the glass factory's office | MT910 tells Nordbank that its account at Meridian Bank was credited |
| The glass factory's office matches the letter to the slip, then credits | Nordbank validates, screens and matches the payment before it pays its customerWho: Nordbank |
| The glass factory's account goes up | Northstar Components, the supplier, is credited by NordbankWho: Northstar Components |
| A balance sheet and a list of entries by day, a statement at close | MT941 gives balances, MT942 lists daytime entries and MT940 is the day statement |
| The owner ticks each statement line against her own order slip | Asha Traders matches the MT940 entry to its own request, MT101 |
| The hall sends each office a copy of its own card | MT950 reports the entries on Bank Alfa's account at Meridian BankWho: Meridian Bank |
| A clerk lays two cards side by side and finds an entry on only one | Maya Chen compares Bank Alfa's books with the MT950; a lone entry is a breakWho: Maya Chen |
| An entry written today on one card and tomorrow on the other | A timing difference clears itself; an unmatched entry gets a query, MT199 |
| The cashier cannot carry out the slip and tells her in the agreed way | A rejected request: no MT103 is sent and funds stay with Asha Traders |
| The hall keeps a small handling fee as the letter passes | Shared charges: Meridian Bank takes off a fee, so the supplier receives lessWho: Meridian Bank |
| The hall refuses the letter before it makes any entry | REJT: no value is booked, so Bank Alfa restores the customer balance |
| The glass factory's office finds the account closed and sends the amount back | RETN: Nordbank returns settled funds as a second payment the other wayWho: Nordbank |
| An office posts a query note, and the reply comes back | MT195 asks, MT196 answers; MT199 is the free-text version |
| The owner asks her office to get the paid amount back | Bank Alfa sends MT192, a cancellation request; it asks and reverses nothingWho: Bank Alfa |
| The glass factory's office agrees to hand it back, or refuses | MT196 answers: CNCL accepted, with a return to follow, or RJCR refused |
WHERE THIS PICTURE STOPS
- In the picture the owner could ask her office to get the amount back. In the journey that is a cancellation request,
MT192. It only asks. The beneficiary's bank can refuse it, and the first settlement stands. - The slips and sheets in the picture look like proof that the glass factory was paid. They are not.
MT900confirms one debit, andMT940lists entries on Asha Traders' own account. Only the credit at Nordbank shows the supplier was paid. - The ledger hall in the picture is one keeper with a card for each office. This journey settles on one correspondent's books. Other routes use more banks or a shared payment system, and the picture cannot show which.
- The picture does not say how current this route is. This journey is the older Swift message format, and a new build does the same job in
ISO 20022. - The handling fee in the picture is small and illustrative. In the journey the charge option, such as
SHAfor shared, decides who bears each bank's fee. The message trail is the only record of what was taken. - The cashier in the picture tells the owner of a failed slip in an agreed way. A real corporate service is agreed bank by bank, so how a failure reaches the customer varies. Swift's rules have the bank send a rejection advice, normally an
MT195(a query), though anMT199(a free-format message) is allowed. TheISO 20022journey uses the structuredpain.002status report.
HOOK
Messages ask, report and query. One ledger entry settles.
REMEMBER IT THIS WAY
A chunk: a long list grouped so it is easier to hold.
Group the account reports by what they hold: MT941 balances, MT942 daytime entries and MT940 the day statement.
| In the trick | What it stands for |
|---|---|
MT941 | gives balances |
MT942 | lists daytime entries |
MT940 | is the day statement |
TELL A FRIEND
In the older Swift message format, one payment brings a request, the payment message, confirmations, reports and queries. The between banks is what settles it.
OFTEN MIXED UP WITH What the network says back (ACK, NAK). That topic teaches the network's accepted-or-refused answer to one message. This journey shows the bank answers, such as debit, credit, reject, return and statement, which arrive as other messages.
PRACTISE AND KEEP
IMPLEMENTATION RESOURCES
13 RESOURCES
EVIDENCE AT ARM'S REACH
Apply the base message definition first, then the scheme or infrastructure profile that governs this topic.
An XSD checks XML structure. A usage guideline adds profile rules, conditional fields, code restrictions, and business controls. XSD-valid does not mean scheme-compliant.
MT101 request for transfer — raw FIN
MT104 request for debit transfer — raw FIN
MT legacy and migration lifecycle — ZIP pack
MT101 → pain.001 implementation mapping
MT104 → pacs.003 implementation mapping
MT104 → pain.008 implementation mapping
MT101 field matrix
MT104 field matrix
MT110 field matrix
MT111 field matrix
MT112 field matrix
MT to MX migration notes
Sources for this topic — 10 sources
- Scheme-specific rule
A third-party catalogue of the older Swift message types ↗ — iotafinance.com · MT110 advice of cheque(s): sent by a drawer bank or a bank acting for it to the drawee bank, with cheque number, date of issue, amount and payee; MT111 stop-payment request to the drawee bank; MT112 status reply (field 76 Answers required) from the drawee bank to the drawer bank; MT104 and MT107 direct debit messages (search excerpts of third-party message catalogue pages, not opened)
A third-party reference, not Swift. It is a lead to the member-only standards guides. Known only from a web-search excerpt; the page was not opened. Read again as a search excerpt on 2026-10-17; the page was still not opened.
- Market practice
A 2008 list of Swift messages (slide-sharing site) ↗ — Unnamed uploader on SlideShare · MT256 Advice of Non-Payment of Cheques informs the sender of earlier MT206 messages of non-payment of truncated cheques (search excerpt of a 2008 message list, page not opened; fields, reason codes not found)
Known only from a search excerpt; the page was not opened. A third-party copy of an old list, used for the title and the purpose line only. It may be out of date. Several message lists returned the same wording.
- Market practice
BNY (a large correspondent bank), Update on ISO 20022 end of co-existence (May 2025) ↗ — BNY · Direct debit messages (MT104, MT107, MT204) and cheque messages (MT110, MT111, MT112) continue to be supported until a date is defined by Swift (search excerpt, page not opened; single source)
Known only from a search excerpt; the PDF was not opened. One bank, written before the November 2025 deadline. No newer Swift date was found.
- Scheme-specific rule
Swift Standards MT (annual standards releases) ↗ — Swift · MT message families in Swift Standards MT; the cheque and direct debit message names are taken from a third-party catalogue (search excerpt, Swift page not opened)
Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.
Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.
Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.
- Official requirement
ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence for in-scope FI-to-FI payment instructions (via the registered fact)
Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.
- Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only
CBPR+ roadmap beyond November 2025 ↗ — Swift · Post-coexistence treatment and the MT101 relay (via the registered facts)
Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.
The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.
Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.
The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.
- Simplified educational illustration
Payments Signal editorial teaching models — Payments Signal
What this simplifies: Asha Traders, Bank Alfa, Nordbank, Northstar Components and Maya Chen are fictional. Bank Alfa as the bank that issues the cheque and Nordbank as the bank it is drawn on in path one follows the lifecycle flow and is a teaching choice. The funds states are simplified: real banks differ on when a customer is debited, how a returned cheque is recovered, how a pull is declined and which bank holds and checks the mandate. The fields of the MT256, the reply to a refused collection and how a mandate check is expressed in the MT104 (direct debit request) and MT107 were not found in any source and are not stated.
Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.
- Scheme-specific rule2025 v1.2 (EPC016-06)
2025 SEPA Direct Debit Core rulebook version 1.2 (EPC016-06) ↗ — European Payments Council · SEPA Direct Debit Core rulebook, 2025 version 1.1 text, since replaced by version 1.2 on 30 September 2026 (address elements only): the rulebook does not require the Debtor PSP or the Creditor PSP to check the correct application of the mandate rule, which is an obligation for the Creditor; Debtor PSPs may wish to check the status of the mandate (search excerpt of the 2025 v1.0 text, page not opened)
Version 1.2 formally replaced version 1.1 at its publication on 30 September 2026 (the European Payments Council's wording, seen as a search excerpt; the page was not opened). The EPC states that the change is limited to address-message elements and makes no other business or operational rule changes. Later verification on6November2026 opened and read the official2025v1.2 PDF: sections4.1–4.2,printedpp26–28, mandate custody/data and account-status/limitation controls.
- Scheme-specific rule2025 v1.2 (EPC222-07)
2025 SEPA Direct Debit Business-to-Business rulebook version 1.2 (EPC222-07) ↗ — European Payments Council · SEPA Direct Debit B2B rulebook, 2025 version 1.1 text, since replaced by version 1.2 on 30 September 2026 (address elements only): it is the responsibility of the Debtor PSP to ensure that the Debtor is not a consumer before debiting the account (search excerpt, page not opened). A debtor-bank check of mandate data was not re-confirmed and is not stated
Version 1.2 formally replaced version 1.1 at its publication on 30 September 2026 (the European Payments Council's wording, seen as a search excerpt; the page was not opened). The EPC states that the change is limited to address-message elements and makes no other business or operational rule changes. Later verification on6November2026 opened and read the official2025v1.2 PDF: section4.1,printedpp27–28, creditor-held signed mandate and debtor-PSP mandate-data checks.
- Market practiceLive overview checked6November2026
EPC SEPA Direct Debit: Core and B2B mandate-control differences ↗ — European Payments Council · Live EPC overview opened6November2026, Main differences: Core custody versus B2B debtor confirmation/storage/checks
Complete operative page opened6November2026. Current indexed2025B2B e-mandate IG points to rulebookv1.2 effective30September2026; full rulebook not represented as newly read.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.