TOPIC 07/1616 MINNOT STARTED

MT-to-MX translation and truncation

What happens when rich ISO 20022 data must fit MT fields and back — truncation, address handling, and one-to-many mappings.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: a long form and a short telegram. Translating between — message type, the older Swift format — and means moving between a detailed multi-page form and a telegram with fixed-size boxes. Neither direction is comfortable, and they are uncomfortable for opposite reasons.

Going from telegram to form, the problem is that the information was never labelled. You have to guess which parts of a run-together line are the name and which are the street. Guessing usually works. Usually is not always, and nothing marks the times it did not.

Going from form to telegram, the problem is room. Long names get cut short. Separately labelled boxes get squashed onto shared lines. The labels themselves disappear, because a telegram has nowhere to put them.

Both directions can be done carefully, and rulebooks exist for how to do them. Neither direction guarantees that every source detail survives. A particular conversion can preserve all the data it carries, while another loses structure or cuts off a value. Check the actual mapping and output rather than assume either complete preservation or inevitable loss.

So the questions that matter here are not really about formats at all. They are about who finds out what was lost, and when. (SYNTHETIC / TRAINING ONLY — every person and firm named in this topic is invented.)

PLAIN WORDS · 1 in this section
rulebooks
the official documents that set out the rules to follow

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the payment.

THE REAL JOB Translation lets a payment move between the older Swift (message type) format and ISO 20022, so each system can read it.

  1. The original message holds the party data whole
  2. Translation crosses between ISO 20022 and the older Swift format
  3. Going to the older format: the tail of a long name is cut and labels are squeezed together
  4. Going to ISO 20022: the lines never had labels, so parts are guessed
  5. The receiver gets only what survived the crossing
  6. The investigator asks for the original message
One translated message, read in order, from original to investigator

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The detailed multi-page form with a label on every partAn ISO 20022 message such as the pacs.008, with separate labelled elements
The telegram with fixed-size boxesA Swift message type (MT) such as the MT103, with short free-text lines
A long name cut short to fit a boxInto the older Swift format: the name is cut off if the field is shorter
Several labelled boxes squeezed onto one shared line, with the labels left offTranslating to the older format: elements share lines, and the element names do not travel
Guessing which part of a run-together line is the name and which is the streetTranslating to ISO 20022: lines with no labels are guessed apart or kept as text
Someone downstream working with whatever survived the squeezeScreening, archives and investigators reading the translated message

WHERE THIS PICTURE STOPS

  • The picture has two ends and one crossing. A real payment may be translated on one leg, one step of its route, and not on another. So the same payment can exist in both shapes at once. The UETR, the unique end-to-end transaction reference, is what ties the two shapes together, and the picture has no place for it.
  • The picture covers two difficulties: labels that disappear and room that runs out. A third is hidden: one MT (message type) field feeds several ISO 20022 elements, or several elements share one field. A bigger box would not fix that, because it is about meaning.
  • In the picture, the squeezed copy replaces the form. In a payment the original message still exists with the bank that sent it, so an investigator can ask for it. The translated copy is derived data and the original is the evidence.
  • The picture shows loss as a surprise. Real translation follows written mapping rules. Going to the older MT (message type) format, a cut is flagged where those conventions are followed. Going to ISO 20022, nothing marks a wrong guess. The process gives no promise that nothing is lost, and the shape alone does not tell you what was.

HOOK

Translated means derived: when in doubt, ask for the original.

REMEMBER IT THIS WAY

A contrast: two neighbours told apart by one test.

Ask which way it crossed. Going to the older Swift format (), ask what was cut or squeezed; going to ISO 20022, ask what was guessed.

What each part of the trick stands for
In the trickWhat it stands for
Going to MT, what was cut or squeezedfield length forces truncation of long names, and labelled elements share lines without their labels
Going to ISO 20022, what was guessedlines with no labels are split by guesswork or kept as unstructured text, and nothing marks a wrong guess
Then check the originaltranslated output is derived data, a copy that may have lost something, so the original message is the evidence

It needs you to know which way the message crossed, and institutions translate a little differently.

TELL A FRIEND

A move between the older Swift format and ISO 20022 can lose information: names get cut one way, labels get guessed the other. When a name looks cut, jumbled or too tidy, trust the original message.

OFTEN MIXED UP WITH CBPR+: ISO 20022 for cross-border payments. Cross-Border Payments and Reporting Plus () is a set of usage guidelines for the ISO 20022 side of a payment. They restrict messages and tighten address rules. Translation is the crossing between that shape and the older Swift shape, where detail can be lost. CBPR+ says what good data looks like. Translation asks what survived the crossing.

CURRENT AS CHECKED

8 FIGURES
  • Swift MT (message type) charges messages MT190, MT191, MT290, MT291 and their ISO 20022 counterparts

    Swift's (Cross-Border Payments and Reporting Plus) roadmap pairs (message type) 190 and MT 290 (advice of charges) with camt.105, and MT 191 (request to pay charges) and MT 291 with camt.106. The registered end of coexistence for payment instructions is not a retirement date for these four MT messages.

    CHECKED 2026-10-11RECHECK BY 2026-12-31

    Sources & standards — 2 sources
    1. Scheme-specific ruleJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Message pairing of MT 190, 290, 191 and 291 with camt.105 and camt.106 (search excerpt, page not opened; several roadmap editions returned, the one titled September 2026 listed first and carrying this pairing in the excerpt, currency of edition not opened)

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

    2. Market practiceSwift ID5026472, updated11September2024

      Swift camt.105/camt.106 CBPR+ usage notice — hosted by NatWest ↗ — Swift; public copy hosted by NatWest · camt.105 and camt.106 usage guidelines exist (search excerpt, page not opened)

      Swift SR2024 four single/multiple camt.105/camt.106.001.02 guidelines, RMA and single-only in-flow translation. At that release camt.106 had no MT191field57 equivalent and could not state a pay-to account. This is a profile-specific limitation, not absence of every account element in the base schema. · Checked 2026-11-06

      All3pages downloaded and read in V10 audit; supersedes earlier search-only access note. The 2024 notice does not establish all current2026 usage rules. SR2026 vendor version labels remain separate from the deferred rollout schedule.

  • Swift CBPR+ postal-address usage

    Swift has deferred the requirement to use hybrid or fully structured postal addresses, previously due to start 14 November 2026, after community readiness concerns. No replacement date has been set. Swift has said it will consult industry and communicate revised timing by December 2026 at the latest.

    Checked 6 November 2026: the live campaign/FAQ still display the original date, but the dated 27 August announcement updated 21 September records the deferral. The 12 June 2027 partial release covers other stated message changes; it is not the address-retirement date. The ’s separate by February 2027 decision horizon does not set Swift’s date.

    CHECKED 2026-11-06RECHECK BY 2027-01-05

    Sources & standards — 3 sources
    1. Official requirement

      Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Deferral of SR2026 payments changes, including the structured-address requirement, and the promised update by December 2026

      Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

      Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

      Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

    2. Official requirement

      Unstructured address data is being removed ↗ — Swift · The original requirement now under deferral: hybrid/structured formats and message exceptions

      Original CBPR+ postal-address scope, including the minimum town-and-country requirement, hybrid or fully structured formats, and explicit message exceptions. The 14 November 2026 start date this page names is superseded; see swift-sr2026-controlled-extension-2026. · Checked 2026-11-06

      This is a CBPR+ rule, not a universal ISO 20022 rule. EPC schemes publish their own address dates and scope. The BIC-only option for agents is stated on the companion FAQ (swift-unstructured-address-faq), not on this campaign page. Superseded on the date question only: Swift deferred this requirement on 27 August 2026 with no replacement date set (swift-sr2026-controlled-extension-2026). The scope and format description above is unaffected.

      Follow-up 6 November 2026: current campaign and FAQ still display the original 14 November 2026 date. The dated 27 August announcement updated 21 September separately defers address migration. Keep the format/message-scope guidance distinct from that superseded date. The 12 June 2027 partial-release date and EPC’s by February 2027 decision horizon are not replacement CBPR+ address deadlines.

    3. Official requirement

      Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · 27 August 2026 announcement updated 21 September: address timing remains separate; 12 June 2027 partial release scope is not the address-retirement date.

      Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

      Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

      Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

  • Swift CBPR+ FI-to-FI payment instructions

    Swift coexistence for in-scope -to-FI payment instructions ended on 22 November 2025; that deadline did not retire every MT reporting, initiation, investigation or correspondence message.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 2 sources
    1. Official requirement

      ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence — 22 November 2025

      Describes current CBPR+ adoption, the 22 November 2025 end of coexistence for in-scope FI-to-FI payment instructions, later migration work and the structured-address milestone. That milestone was previously due in November 2026 and has since been deferred (see swift-sr2026-controlled-extension-2026). · Checked 2026-07-18

      Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.

    2. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Message-specific roadmap beyond November 2025

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  • Swift FIN (Swift's messaging network) MT104 and MT107 direct debit messages

    Swift's (Cross-Border Payments and Reporting Plus) roadmap treats the messages MT104 and MT107 apart from the 22 November 2025 payment-instruction deadline. Versions read as search excerpts plan their end of coexistence for the 2028 standards release. They say enforcement depends on how widely firms adopt pain.008 (customer direct debit order) and pacs.003.

    The September 2026 version says the roadmap is under review after Swift postponed its 2026 release. The roadmap lists , , pacs.003, pacs.010 and pain.008 together as direct debit and margin collection.

    Swift’s coexistence table, as a search excerpt, labels the direct debit group (MT104, MT107, ) “End of Life - (negative acknowledgement)”. How these fit with the 2028 target was not established. Whether either message is refused today was not established either.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 1 source
    1. Scheme-specific ruleJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Direct debit rows and end-of-coexistence planning note across roadmap versions; read as search excerpts, page not opened

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  • Swift MT (message type) cheque messages MT110, MT111, MT112 and their ISO 20022 partners

    Bank documents pair the Swift (message type) cheque messages with messages: MT110 with camt.107, MT111 with camt.108 and MT112 (status of a cheque stop request) with camt.109. Swift runs a training course named for the three camt messages. Read from search excerpts, pages not opened.

    One search excerpt of a Swift equivalence table lists no (the ISO 20022 message format) equivalent available for these three, so sources disagree.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 4 sources
    1. Market practice

      J.P. Morgan, ISO 20022 messaging for Swift users: adoption schedule ↗ — J.P. Morgan · MT110, MT111 and MT112 paired with camt.107, camt.108 and camt.109; the MT111 asks the drawee to refuse settlement when the cheque is presented (search excerpt, page not opened)

      A bank's public ISO 20022 adoption schedule. A search excerpt pairs MT110 (advice of a cheque) with camt.107, MT111 with camt.108 and MT112 (status of a cheque stop request) with camt.109. Says the stop request asks the drawee to refuse settlement when the cheque is presented. The excerpt gave no field-level rules. · Checked 2026-10-11

      Known only from search excerpts; the page was not opened. Only the code pairing and the plain job are used.

    2. Market practice

      ISO 20022 Migration FAQs ↗ — Citibank, N.A. (Treasury and Trade Solutions) · Citi ISO 20022 migration FAQ table pairs MT110 with camt.107, MT111 with camt.108 and MT112 with camt.109 (search excerpt, page not opened; a later timeline passage in the same excerpt names other camt numbers that do not match)

      A correspondent bank's public migration FAQ, carrying a table headed "MT messages and their MX equivalent" that runs from MT 101 to MT 999 and gives each MT one ISO 20022 message.

      Cited on the MT104 to pacs.003 table as the second independent statement of that pairing: the row reads MT 104, Direct Debit and Request for Debit Transfer Message, pacs.003. It is the narrower of the two readings in the market, because it gives MT104 a single destination where Swift's own scope table gives it two. And the table names it beside the Swift deck so a reader can see the disagreement rather than inherit one side of it. · Checked 2026-08-23

      Downloaded and read from the publisher's own domain on the access date: HTTP 200, 377,456 bytes, converted with pdftotext -layout, so nothing cited from it rests on a search excerpt.

      A readiness FAQ rather than a mapping guide. Its equivalence table states which MT becomes which MX and nothing about fields, so it is cited for the pairing only; every element path and presence flag on the table it supports is read from the published schema.

      The same bank's public migration webinar deck gives MT104 both pain.008 and pacs.003, which is the reading Swift's own scope table takes. Where this FAQ's single-destination row and that deck differ, this site treats the two-destination reading as the fuller one and says so in the table's caveats.

      Undated in the body. It describes one bank's position in a migration whose milestones move; check again before using a date from it in delivery planning.

    3. Scheme-specific rule

      Swift training catalogue — Cheques Management (camt.107, camt.108, camt.109) ↗ — Swift · Swift training course titled Cheques Management (camt.107, 108, 109) (search excerpt, page not opened)

      Swift's own training module on the three cheque messages. Cited for their names and purpose only: camt.107 (cheque presentment notification) Cheque Presentment Notification, camt.108 Cheque Cancellation or Stop Request, camt.109 Cheque Cancellation or Stop Report, and for the statement that cheque management messages enable agents to present, stop and cancel cheques. Registered once and shared by the camt.107, camt.108 and camt.109 topics.

      Not cited for versions, fields, codes, timing, or which bank sends or receives each message. · Checked 2026-10-11

      Known from a web-search excerpt (search excerpt, page not opened). The excerpt lists the module as advanced and about 20 minutes. Another Swift adoption list was reported by search to call camt.108 a Cancellation or Stop Notification, so names are checked against the ISO 20022 catalogue before field-level use. A search excerpt also lists a Swift Smart 'Cross-Border Payments and Reporting Plus (CBPR+) - Cheques management' curriculum.

    4. Scheme-specific rule

      Swift, Standards MT (message type) - MT and MX (the ISO 20022 message format) Equivalence Tables ↗ — Swift · Swift Standards MT, MT and MX Equivalence Tables lists no MX equivalent available for MT110, MT111 and MT112 (search excerpt, edition not identified, page not opened)

      Swift's table of which MX (the ISO 20022 message format) message matches each MT (message type) message. A search excerpt says it lists none available as the MX equivalent of MT110 (advice of a cheque), MT111 and MT112, which conflicts with bank documents that pair them with camt.107 to camt.109 (cheque cancellation or stop report). Another search excerpt lists the confirmation message MT300 against the trade instruction message fxtr.014, and the guarantee message MT760 against the undertaking issuance message tsrv.001, at message level only. Swift says the field-by-field translation sits in its Translation portal. · Checked 2026-10-11

      Known only from a search excerpt; the PDF was not opened and the edition was not identified. Used only to show that sources disagree on the pairing. The message-level pairs were read in excerpts. No row for the credit message MT700 was seen.

  • Swift Cross-Border Payments and Reporting Plus (CBPR+) free-format MT199 (free-format message) and MT299 (free-format message) non-investigation use

    Swift's roadmap for Cross-Border Payments and Reporting Plus (), in its June 2026 download, moves some free-format notes to a new message. Non-investigation use of (free-format message) and MT299 (free-format message) goes to admi.024 (notification of correspondence) by November 2027. Investigation use goes to camt.110 (investigation request) and camt.111 (investigation response). Swift deferred the 2026 payments changes in August 2026 and promised new dates, so this date may move.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 2 sources
    1. Scheme-specific ruleJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · June 2026 roadmap: non-E&I MT199/MT299 use to admi.024 by November 2027 (read through an archive copy, per the registry entry)

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

    2. Official requirement

      Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Deferral of SR2026 payments changes with new dates promised by the end of 2026

      Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

      Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

      Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

  • Swift FIN (Swift's messaging network) formatted MT (message type) n92, n95 and n96 messages used for exceptions and investigations

    Swift says that from November 2027 the formatted (message type) messages for payment cancellations (MT n92 and n96) are removed from the network. So are those for exceptions and investigations (MT ).

    Cancellations then use (bank-to-bank payment cancellation request) and through Stop and Recall. Investigations use camt.110 (investigation request) and camt.111 through Case Management.

    Swift postponed the mandate from November 2026 to November 2027, so both formats can be exchanged between banks until then. Swift's pages differ on the free-format , so check the live page before planning.

    CHECKED 2026-10-11RECHECK BY 2027-02-01

    Sources & standards — 1 source
    1. Scheme-specific rule

      ISO 20022: Exceptions and Investigations — frequently asked questions ↗ — Swift · Exceptions and Investigations FAQ and Swift news items: formatted MT n92, n95 and n96 removed from November 2027; Stop and Recall mandate postponed to November 2027 (search excerpt, page not opened, 2026-10-11; the FAQ excerpt says free-format MT n99 stays available but should not be used for exceptions and investigations, while the Case Management page excerpt says it will be retired for that use)

      Swift's own FAQ on the exceptions-and-investigations migration, cited for four statements it makes in plain words.

      Which messages replace which: camt.110 as the investigation request and camt.111 as the investigation response, against the MT n95 queries and MT n96 answers, with camt.056 and camt.029 taking the cancellations.

      That camt.110 and camt.111 can only be exchanged through the Case Orchestrator and cannot be exchanged bilaterally, which is the difference between them and every FIN message they replace.

      That from November 2026 every institution must be able to receive a camt.110 carrying an in-flow translation with an embedded MT 199 inside it, and that in-flow translation for non-instruction messages remains free of charge.

      And the sentence the free-format decision rests on. From November 2027 the formatted MT messages for cancellations and for exceptions and investigations are removed, while "Free format messages (MT n99) will still be available but should not be used for E&I purposes". · Checked 2026-08-23

      swift.com does not respond — requests to it time out rather than returning a status. So the page was read through the Internet Archive's copy of the publisher's own URL, snapshot 20260822215634, HTTP 200, 163,796 bytes, and the text extracted from that HTML. The words are the publisher's; only the route to them is the archive's.

      It is a service FAQ, not a message definition. Its scope is the cross-border payment categories, so it names the Category 1 and Category 2 members — MT 195/198/295/298 and MT 199/299 — and does not mention the Category 9 members at all. The Category 9 pairings are sourced from Swift's CBPR+ coexistence deck instead. It does not mention admi.024.

      Every presence flag and element address on the tables it supports is read from the published schema rather than from here.

      Undated as a page. Its milestones are dated and will move; recheck the live page before using one in delivery planning.

  • Swift CBPR+ (Cross-Border Payments and Reporting Plus) reporting messages: MT940, MT941, MT942, MT950 and the MT920 request

    Swift's (Cross-Border Payments and Reporting Plus) roadmap treats (message type) reporting messages on a separate timeline from payment instructions. Search excerpts say receiving camt statements is expected from November 2027. Banks are strongly encouraged to be able to send camt messages by then.

    The end of coexistence for statements and reporting messages is planned for November 2028. Swift adds that its ability to enforce the end of coexistence will depend on community adoption.

    One bank, J.P. Morgan, gives November 2028 for the same milestone in its own FAQ, citing current Swift communication. Read that as one bank repeating the roadmap, not as a second source.

    CHECKED 2026-10-11RECHECK BY 2027-04-11

    Sources & standards — 1 source
    1. Scheme-specific ruleJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Reporting messages: the November 2027 and November 2028 milestones and the note that enforcement depends on community adoption. Seen in web-search excerpts of swift.com roadmap files on the access date; the page was not opened. No scheduled event anchors the review date, so it is a plain six-month check.

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

SEE THE PAYMENT MOVE

PICTURE THE JOURNEY

Two supply counters, a supply house and a postal serviceOpen to read the picture, how it matches the payment and where it stops.

PICTURE IT

Two supply counters, a supply house and a postal service

Picture a toy-shop owner paying an overseas toy maker. Each keeps credit at a different supply counter, and both counters keep a page at one supply house. This invented case uses that shared house; other routes can have more intermediaries.

Her counter checks her order and lowers her credit. It posts a payment letter to the supply house. The postal service checks and carries the envelope; delivery itself changes nobody's credit. The house checks the instruction and available credit, then lowers her counter's page and raises the other counter's page. It sends a credit notice and an onward payment letter. The receiving counter checks the evidence and credits the toy maker.

The six forks have explicit assumptions. An agreed handling fee reduces the amount arriving; a shared-cost label alone does not authorize every deduction. An agreed conversion applies because the recipient's account accepts only another currency. A review pauses this case without an automatic report, but silence alone cannot identify the cause. In the duplicate fork, controls fail and the books actually show two transfers and two recipient credits; merely receiving two letters would not prove that outcome. Recovery needs a valid basis, authority and available credit, followed by a separate return. This case assumes the customer's agreement. The invalid-account fork assumes a full return through the same house. The late fork assumes the next eligible processing day, subject to calendars, funding and checks.

SYNTHETIC / TRAINING ONLY: the shops, counters, fee and conversion terms are invented; the historical message example is not a current universal service rule.

THE REAL JOB This historical serial MT103 example relays payment instructions while one changes its own account balances.

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The toy-shop owner, who asks her counter to pay abroadThe ordering customer, who instructs Bank Alfa to pay a supplier abroad
Her local supply counter, which holds her creditBank Alfa, the ordering bank, which has no account with Cassia BankWho: Bank Alfa
The counter checks the order and names, then lowers her creditBank Alfa validates and screens, then debits the payer's account
The postal service: checks the envelope layout, keeps it safe, delivers itSwift FIN, the message network, validates, stores and delivers; it settles nothing
The payment letter that her counter posts to the supply houseThe MT103, a customer payment message, goes first to Meridian Bank
The supply house, where both counters keep a credit pageMeridian Bank, the correspondent that holds accounts for both banksWho: Meridian Bank
It checks the letter, the names, and that her counter's page holds enoughMeridian Bank screens the payment itself and checks Bank Alfa's account holds enoughWho: Meridian Bank
A minus on her counter's page, a plus on the other'sBook transfer: Meridian Bank debits Bank Alfa's account and credits Cassia Bank'sWho: Meridian Bank
A credit notice posted to the toy maker's counterThe MT910, which tells Cassia Bank its account at Meridian Bank was credited
An onward payment letter relays the instruction to the receiving counterAn onward MT103 relays the instruction to Cassia Bank in this historical example
The toy maker's counter, which checks the letter and the noticeCassia Bank, the beneficiary bank, validates and screens before it creditsWho: Cassia Bank
The toy maker, whose credit risesThe beneficiary, credited by Cassia Bank
An agreed handling fee reduces the credit arriving at the other counterAn agreed intermediary fee is assumed; SHA alone does not authorize every deduction
His account accepts another currency and the agreed conversion appliesCassia uses agreed automatic FX for this euro-only account; other arrangements differ
A review pauses this letter; no automatic report is assumed hereThis case has a compliance hold; silence alone does not establish the cause
Her counter posts a short query note to the supply houseMT199, a free-format query message, asks a person at Meridian Bank to look
Controls fail; the books confirm two transfers and two recipient creditsDuplicate control failure and actual double posting are explicit assumptions, not message-arrival consequences
A recovery request needs authority; a separate return follows permitted customer recoveryHistorical MT192 requests recovery; MT196 answers, but neither alone moves the returned funds
An invalid account leads to a separate return through the same house hereThis invalid-account case assumes a full return via Meridian; actual routes and fees vary
The late letter waits until the next eligible processing day in this caseActual cutoff, calendar, funding and checks govern processing; next-day value is not universal

WHERE THIS PICTURE STOPS

  • This case uses one shared correspondent's commercial-bank ledger: the account balances are claims on Meridian Bank, not central-bank money. There is no clearing house in this illustration; other serial routes can involve several intermediaries and settlement arrangements.
  • A delivered instruction or credit advice is message evidence, not independent proof that the relevant settlement or customer credit occurred. Reconcile the applicable account entries and status evidence; the advice and settlement are distinct.
  • An original settled entry remains recorded. A cancellation or recovery request is not a debit authority or completed return. Recovery depends on a valid basis, authority and available funds; customer consent is an explicit assumption in this positive example, not the only possible legal basis everywhere.
  • The late fork assumes the next eligible processing day. Actual currency calendars, cutoffs, funding, checks and account arrangements determine processing and value dates; a late message does not universally get tomorrow's value date.
  • Names are only a simplified picture of applicable validation and screening controls. A hold does not prove wrongdoing, and silence does not prove a compliance hold. Reporting can use automated or manual channels; this fork merely assumes no automatic report.
  • The illustration's fee deduction and automatic currency conversion require its agreed terms. Shared charge allocation does not itself authorize every deduction, and a different account currency does not establish a universal conversion policy or rate.
  • This is a historical MT103 example. Normal in-scope cross-border FI-to-FI coexistence has ended: native CBPR+ instructions use the applicable ISO 20022 profile over FINplus. Selected MT conversion contingency is distinct, and other MT services were not globally retired. Current private message profiles were not reviewed here.

HOOK

Trace the instruction; verify the actual account entries.

REMEMBER IT THIS WAY

A sequence: the real steps, in order.

In this shared-correspondent case, trace instructions separately from the actual ledger postings.

What each part of the trick stands for
In the trickWhat it stands for
Message paththe MT103 goes first to Meridian Bank, which holds accounts for both banks
Book transferMeridian Bank debits Bank Alfa's account and credits Cassia Bank's
Advicethe MT910 tells Cassia Bank its account at Meridian Bank was credited

TELL A FRIEND

This serial example relays instructions through Meridian, which holds both banks’ accounts. Messages and advice describe the journey; actual ledger entries establish what was posted, including any duplicate.

OFTEN MIXED UP WITH Serial versus cover routing. Serial relays the customer instruction along the intermediary chain; cover separates the customer-instruction route from its funding route. This historical example uses MT103; current message and settlement rules depend on the applicable service and profile.

MESSAGES INVOLVED

PRACTISE AND KEEP

IMPLEMENTATION RESOURCES

67 RESOURCES

EVIDENCE AT ARM'S REACH

Apply the base message definition first, then the scheme or infrastructure profile that governs this topic.

An XSD checks XML structure. A usage guideline adds profile rules, conditional fields, code restrictions, and business controls. XSD-valid does not mean scheme-compliant.

XSD + definitionBase ISO 20022

ISO 20022 message definitions and XSDs

OPEN OFFICIAL SOURCE
Usage guidelineCBPR+

CBPR+ usage guidelines

OPEN OFFICIAL SOURCE
Usage guidelineHVPS+

HVPS+ usage guidelines

OPEN OFFICIAL SOURCE
Usage guidelineCBPR+

PMPG correspondent-payment and reporting market practice

OPEN OFFICIAL SOURCE
RulebookSEPA SCT

SEPA Credit Transfer rulebook

OPEN OFFICIAL SOURCE
Usage guidelineSEPA SCT

SEPA Credit Transfer implementation guidelines

OPEN OFFICIAL SOURCE
RulebookSEPA SCT Inst

SEPA Instant Credit Transfer rulebook

OPEN OFFICIAL SOURCE
Usage guidelineSEPA SCT Inst

SEPA Instant Credit Transfer implementation guidelines and XSDs

OPEN OFFICIAL SOURCE
Usage guidelineT2

T2 functional specifications, validation rules, and binding XSDs

OPEN OFFICIAL SOURCE
Usage guidelineTIPS

TIPS release specifications and professional-use documentation

OPEN OFFICIAL SOURCE
Usage guidelineCHAPS

CHAPS and RTGS ISO 20022 handbook and schema access

OPEN OFFICIAL SOURCE
Usage guidelineFedwire

Fedwire Funds Service ISO 20022 implementation and technical documents

OPEN OFFICIAL SOURCE
Usage guidelineCHIPS

CHIPS ISO 20022 usage-guideline resources and rules

OPEN OFFICIAL SOURCE
Teaching sampleIllustrative; no scheme profile checked

MT103 customer credit transfer — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

pacs.008 FI-to-FI credit transfer — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

pacs.008 cover announcement — COVE — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT103 rejection convention — raw FIN

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

MT103 return convention — raw FIN

PRO PASS
Lifecycle packIllustrative; no scheme profile checked

Corporate MX positive lifecycle — ZIP pack

PRO PASS
Lifecycle packIllustrative; no scheme profile checked

MT legacy and migration lifecycle — ZIP pack

PRO PASS
MappingCBPR+

MT103 → pacs.008 implementation mapping

PRO PASS
MappingCBPR+

MT103 /REJT/ convention → pacs.002 implementation mapping

PRO PASS
MappingCBPR+

MT103 /RETN/ convention → pacs.004 implementation mapping

PRO PASS
MappingCBPR+

MT102 → N × pacs.008 (batch decomposition) implementation mapping

PRO PASS
Field matrixSwift MT

MT103 field matrix

PRO PASS
Field matrixBase ISO 20022

pacs.008 field matrix

PRO PASS
Test packIllustrative; no scheme profile checked

Payment lifecycle test cases

PRO PASS
Migration notesCBPR+

MT to MX migration notes

PRO PASS
Field matrixT2

T2 RTGS implementation pack field and process matrix

PRO PASS
Test packT2

T2 RTGS implementation pack test cases

PRO PASS
BA checklistT2

T2 RTGS implementation pack BA checklist

PRO PASS
Acceptance criteriaT2

T2 RTGS implementation pack acceptance criteria

PRO PASS
Migration notesT2

T2 RTGS implementation pack migration notes

PRO PASS
Coverage gapsT2

T2 RTGS implementation pack restricted and release-specific gaps

PRO PASS
Field matrixTIPS

TIPS instant-settlement implementation pack field and process matrix

PRO PASS
Test packTIPS

TIPS instant-settlement implementation pack test cases

PRO PASS
BA checklistTIPS

TIPS instant-settlement implementation pack BA checklist

PRO PASS
Acceptance criteriaTIPS

TIPS instant-settlement implementation pack acceptance criteria

PRO PASS
Migration notesTIPS

TIPS instant-settlement implementation pack migration notes

PRO PASS
Coverage gapsTIPS

TIPS instant-settlement implementation pack restricted and release-specific gaps

PRO PASS
Field matrixCHAPS

CHAPS RTGS implementation pack field and process matrix

PRO PASS
Test packCHAPS

CHAPS RTGS implementation pack test cases

PRO PASS
BA checklistCHAPS

CHAPS RTGS implementation pack BA checklist

PRO PASS
Acceptance criteriaCHAPS

CHAPS RTGS implementation pack acceptance criteria

PRO PASS
Migration notesCHAPS

CHAPS RTGS implementation pack migration notes

PRO PASS
Coverage gapsCHAPS

CHAPS RTGS implementation pack restricted and release-specific gaps

PRO PASS
Field matrixFedwire

Fedwire Funds Service implementation pack field and process matrix

PRO PASS
Test packFedwire

Fedwire Funds Service implementation pack test cases

PRO PASS
BA checklistFedwire

Fedwire Funds Service implementation pack BA checklist

PRO PASS
Acceptance criteriaFedwire

Fedwire Funds Service implementation pack acceptance criteria

PRO PASS
Migration notesFedwire

Fedwire Funds Service implementation pack migration notes

PRO PASS
Coverage gapsFedwire

Fedwire Funds Service implementation pack restricted and release-specific gaps

PRO PASS
Field matrixCHIPS

CHIPS implementation pack field and process matrix

PRO PASS
Test packCHIPS

CHIPS implementation pack test cases

PRO PASS
BA checklistCHIPS

CHIPS implementation pack BA checklist

PRO PASS
Acceptance criteriaCHIPS

CHIPS implementation pack acceptance criteria

PRO PASS
Migration notesCHIPS

CHIPS implementation pack migration notes

PRO PASS
Coverage gapsCHIPS

CHIPS implementation pack restricted and release-specific gaps

PRO PASS
Profile packCBPR+

CBPR+ implementation pack

PRO PASS
Profile packSEPA SCT

SEPA credit-transfer implementation pack

PRO PASS
Profile packHVPS+

High-value payments implementation pack

PRO PASS
Profile packT2

T2 RTGS implementation pack

PRO PASS
Profile packTIPS

TIPS instant-settlement implementation pack

PRO PASS
Profile packCHAPS

CHAPS RTGS implementation pack

PRO PASS
Profile packFedwire

Fedwire Funds Service implementation pack

PRO PASS
Profile packCHIPS

CHIPS implementation pack

PRO PASS
Sources for this topic — 8 sources
  1. Market practice

    Payments Market Practice Group market practice documents ↗ — Payments Market Practice Group · MT–MX translation market practice

    Global market practice for payment messaging, including guidance on structured party data, cover payments, and the coexistence of MT and ISO 20022 formats. · Checked 2026-07-12

    The PMPG publishes individual papers via the Swift website; its recommendations are market practice, not binding scheme rules, and adoption varies between institutions.

  2. Official requirement

    Cross-Border Payments and Reporting Plus (CBPR+) usage guidelines ↗ — Swift (CBPR+ working group) · address structuring requirements

    Defines how ISO 20022 messages (including pacs.008, pacs.009, pacs.002, pacs.004, and camt investigation messages) are used and validated for cross-border payments on the Swift network. · Checked 2026-07-18

    Full guidelines require MyStandards access. Public guidance had set 14 November 2026 as the date after which fully unstructured addresses would be removed for in-scope CBPR+ traffic. The explicit message exceptions included admi.024, camt.025, camt.052, camt.053, camt.054 and camt.060. Swift has since deferred that requirement and set no replacement date. The current fact swift-cbpr-unstructured-address-removal carries the position.

  3. Market practice

    Wolfsberg Group Payment Transparency Standards ↗ — The Wolfsberg Group · payment transparency expectations for party information

    Industry standards on preserving complete and accurate party information through payment chains, expressed in ISO 20022 terminology. · Checked 2026-07-12

    The 2023 standards replace the 2017 version and are supplemented by separate Wolfsberg guidance on roles and responsibilities in payment chains.

  4. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: The form-versus-telegram analogy and the three-failure-mode framing compress detailed per-field translation rules into a teaching model.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

  5. Market practice1.0

    Structured ordering and beneficiary customer data in payments — market practice guideline ↗ — Payments Market Practice Group (PMPG) · Guideline 2: structured, complete and accurate data is provided where a payment begins (search excerpt, page not opened)

    A guideline from the Payments Market Practice Group, a bank group that advises Swift, on structured ordering and beneficiary customer data. Guideline 2 says good data quality, meaning structured, complete and accurate, must be provided at the source where a payment begins.

    Guideline 3 says to keep the ISO 20022 format along the chain, because turning it back into the older format risks losing or cutting data. Cited for where missing data should be added. · Checked 2026-10-12

    Known from web-search excerpts on the access date, page not opened. The excerpts show version 1.0 of November 2019. A later Group paper on hybrid postal addresses (version 1.12, March 2026) asks for the same care at payment start, but it was not used here. The guideline is market practice, not a rule. It does not say whether a bank should add data in its source system or in a payment hub.

  6. Scheme-specific rule

    Swift, Standards MT (message type) - MT and MX (the ISO 20022 message format) Equivalence Tables ↗ — Swift · Swift MT and MX equivalence tables (search excerpts, pages not opened)

    Swift's table of which MX (the ISO 20022 message format) message matches each MT (message type) message. A search excerpt says it lists none available as the MX equivalent of MT110 (advice of a cheque), MT111 and MT112, which conflicts with bank documents that pair them with camt.107 to camt.109 (cheque cancellation or stop report). Another search excerpt lists the confirmation message MT300 against the trade instruction message fxtr.014, and the guarantee message MT760 against the undertaking issuance message tsrv.001, at message level only. Swift says the field-by-field translation sits in its Translation portal. · Checked 2026-10-11

    Known only from a search excerpt; the PDF was not opened and the edition was not identified. Used only to show that sources disagree on the pairing. The message-level pairs were read in excerpts. No row for the credit message MT700 was seen.

  7. Scheme-specific ruleJune 2026 edition read in full; September 2026 edition seen as search excerpts only

    CBPR+ roadmap beyond November 2025 ↗ — Swift · CBPR+ roadmap rows for direct debits, charges, cheques and free-format messages (search excerpts, pages not opened)

    Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

    Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

    Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

    Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

    The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

    Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

    The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  8. Scheme-specific rule

    MT to ISO 20022 conversion FAQ ↗ — Swift · Which MT messages are refused and which are converted after payment-instruction coexistence

    The operator's own account of what happens to MT payment traffic after the coexistence period ended. That period, for cross-border institution-to-institution payment instructions, ended on 22 November 2025.

    The page separates two groups of message. MT 102, MT 102 STP, MT 103 REMIT, MT 201 and MT 203, sent institution to institution, are removed from the network, negatively acknowledged at once and never delivered. MT 103, MT 103 STP, MT 200, MT 202, MT 202 COV, MT 205 and MT 205 COV are instead put through contingency processing, which validates them and converts them so the receiver gets ISO 20022.

    It also separates four things that are easy to confuse: contingency processing for senders, the in-flow translation service on FINplus, the locally deployable Swift Translator, and Transaction Manager.

    Both contingency processing and in-flow translation are chargeable from 1 January 2026, on converted volume, and are outside the fixed fee.

    The operator states these are short-term measures rather than an alternative to adopting the standard, and promised a roadmap during the second quarter of 2026. · Checked 2026-08-23

    Read on the access date through the Internet Archive's copy of the publisher's own URL, snapshot of 15 February 2026, at HTTP 200 and 25,816 bytes. That is stated because it matters: swift.com itself still could not be reached outright, returning HTTP 000 with no response at all, so the archive is the only route and the text is as it stood in February.

    The previous note said a full-page fetch was unavailable. That half is still true of the live site and is now recorded with the evidence.

    Every claim the entry already made survives the archived text, including the list of negatively acknowledged message types, which matches word for word. The set that is converted rather than rejected is added, because the entry named only the rejected half and a reader could reasonably have inferred the rest were unaffected.

    One label is dropped. The entry called this the end of CBPR+ coexistence; the page never uses that term, and describes the scope as cross-border institution-to-institution payment instructions. The page's own words are used above.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.