The ISO 20022 migration timeline

How the move from MT to ISO 20022 runs as a dated schedule — coexistence, domestic cut-overs, the end of MT, and structured addresses — not a single switch.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: renovating a house you still live in. Switching the world's payment messages from — message type, the older Swift format — to is less like flipping a switch and more like a home renovation you cannot move out for.

You cannot empty the building for a night, because people need water and light tomorrow morning. So you redo one room at a time, keeping the old plumbing running until the new plumbing is proven.

So for years the two systems run side by side. That overlap has a name — coexistence — and it is why a payment can leave in the old format and arrive in the new one without anything having gone wrong.

Only once every room is converted, and everyone has learned to use it, do the builders finally disconnect the old pipes.

The migration timeline is simply the published schedule of which room is finished when.

Why does a schedule need teaching at all? Because the commonest mistake is to treat it as one date. It is not one date. Different message types, different countries and different systems each have their own, set by different organisations. A team that learns one milestone and applies it everywhere will be wrong about most of its own traffic.

PLAIN WORDS · 2 in this section
renovating
repairing and improving an old building
redo
do again

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the payment.

THE REAL JOB The timeline tells each team which message, on which payment route (the network or system it travels over), changes format on whose published date.

  1. Coexistence: old and new formats run side by side
  2. CHIPS (a private US high-value payment system) and Fedwire (the US Federal Reserve's funds transfer service) finish their own rooms
  3. Cross-border coexistence ends, for payment instructions only
  4. Reporting, initiation and investigation follow their own plans
  5. Address rules: Swift and the European Payments Council each deferred, no new dates named yet
A schedule of separate milestones, each with its own owner

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
One room refitted at a timeOne message type on one payment route moves on its own schedule
Old plumbing kept runningCoexistence: old MT (message type) and new ISO 20022 messages run side by side
Builders disconnect the old pipes of one roomOld MT (message type) payment instructions retired for that cross-border traffic
The list of which room is finishedThe migration timeline: a schedule, not one date
Different people own different roomsEach milestone has its own publisher, such as Swift or the Federal Reserve

WHERE THIS PICTURE STOPS

  • Disconnected pipes stay disconnected for the whole house. Retiring MT (message type) payment instructions on one network does not retire every MT message. Reporting, initiation and investigation messages follow their own plans. Contingency conversion is a temporary backup service that converts a message from one format to the other. It is a stopgap, not coexistence carrying on.
  • A house is refitted to one plan. In the migration no single body sets every date, so a team must find the owner of each one.
  • A date can also move. Swift deferred its CBPR+ (Cross-Border Payments and Reporting Plus) address date, the date after which fully free-text addresses stop being accepted. The European Payments Council separately delayed its own address deadline. Neither has a new date named yet, so check each owner's current publication.
  • A room is either finished or not. A message type can be finished on one route while another route treats it differently. So the picture cannot say where a given message stands.
  • The EPC’s next board decision and Swift’s partial-release activation are different events, and neither is a replacement address-retirement deadline. Read each authority’s latest dated announcement for its scope and date.

HOOK

Someone says we are done: done for which message, on which route?

REMEMBER IT THIS WAY

A rule of thumb: if you see this, think that.

Before you quote a date, fill three blanks: message, route, owner.

What each part of the trick stands for
In the trickWhat it stands for
messagea payment instruction has its own milestone, while statement, reporting, initiation and investigation messages follow separate plans
routeCHIPS (Clearing House Interbank Payments System), Fedwire and cross-border traffic each moved on a different date
ownereach milestone belongs to the body that publishes it, such as Swift or the European Payments Council, and that body says when it moves

The blanks only point to the document to read, because exception lists and dates a day apart can change which traffic a date covers.

TELL A FRIEND

The move from (message type) to ISO 20022 is many separate dates with different owners, not one switch. So say what is finished, on which route.

OFTEN MIXED UP WITH CBPR+: ISO 20022 for cross-border payments. , Cross-Border Payments and Reporting Plus, is the set of usage guidelines that narrows ISO 20022 for . The migration timeline is the schedule of when each part of that change applies, and who published the date. Ask what the rules are for one, and when they start for the other.

CURRENT AS CHECKED

5 FIGURES
  • Eurosystem TARGET Services — the November 2026 release date and the temporary unstructured-address measure in T2

    As checked 12 November 2026, the Eurosystem’s 4 September 2026 news item still confirms that the November 2026 release package proceeds with deployment shifted to 28 November 2026, not the originally planned 14 November 2026. The package covers , T2S, TIPS and ECMS. That package date is not a single identical cutover instant for every service.

    Service-specific milestone sheets differ. The Bundesbank T2 R2026.NOV pack schedules production deployment for 28 November 2026. The main-milestones sheet schedules deployment start 23 November 2026 and live in production on 27 November 2026, with the outbound schema switch completed by about 18:35. Do not flatten those TIPS instants into the package’s 28 November wording, or the reverse.

    T2 also carries a temporary measure that lets fully unstructured postal addresses continue in its settlement messages for a limited period. The Eurosystem presented it as a response to market discussion about readiness for structured addresses. These remain published plans until the cutovers are observed.

    CHECKED 2026-11-12RECHECK BY 2026-11-28

    Sources & standards — 3 sources
    1. Regulatory guidance

      November 2026 TARGET Services releases confirmed with deployment shifted to 28 November 2026 ↗ — European Central Bank / Eurosystem (TARGET Services) · ECB news 4 September 2026 re-checked 12 November 2026: TARGET Services R2026.NOV package deployment shifted to 28 November 2026; covers T2/T2S/TIPS/ECMS; temporary unstructured-address measure in T2.

      The Eurosystem's own confirmation that the November 2026 release for TARGET Services proceeds on 28 November 2026 rather than the originally planned 14 November 2026. The release covers T2 (the euro RTGS system), T2S (securities settlement), TIPS (instant payments) and the Eurosystem Collateral Management System (ECMS). It attributes the shift to the need for all four services to release together as one coordinated package rather than independently.

      T2 will also carry a temporary measure allowing fully unstructured postal addresses in RTGS messages to continue for a limited period, which the notice frames as a response to European-market discussion about readiness for the structured-address migration. Cited here for the confirmed deployment date, the coordinated-release reason for the shift, the existence of the temporary measure, and its readiness rationale. · Checked 2026-11-12

      Corroborated against the Eurosystem's own 28 August 2026 'Reassessment of timeline for November 2026 TARGET Services releases' notice (ecb.mipnews260828), also on ecb.europa.eu.

      Not opened: ecb.europa.eu could not be reached, the same limitation already recorded on other entries in this registry.

      Verified from web-search excerpts of the ECB's own press pages, cross-checked across those two dated notices. Both converge on the same 28 November 2026 date, the same coordinated-release rationale for the shift, and the same description of the temporary unstructured-address measure and its readiness rationale.

      The underlying User Requirements Document for the temporary measure is dated 3 September 2026 (ecb.t2cr260903_T2-0188-SYS-Allow-fully-unstructured-postal-address-format-in-RTGS-messages).

      This entry does not corroborate any causal link to Swift's or the Federal Reserve's own deferral decisions. Those are separate, independently sourced items in this registry; this notice is cited only for the ECB's own confirmed date, reasoning and measure.

      Second-pass web recheck 12 November 2026: package deployment still described as 28 November 2026; service-specific milestone sheets give different TIPS/T2 instants.

    2. Regulatory guidance

      TARGET Service T2 Information on T2 R2026.NOV Release ↗ — Deutsche Bundesbank · T2 R2026.NOV pack: production deployment planned 28 November 2026; UTEST ended 11 November 2026.

      Bundesbank information pack for T2 R2026.NOV after Swift SR2026 deferral. Timeline shown: UTEST start 9 October 2026; UTEST end 11 November 2026; production deployment 28 November 2026. Confirms current production messages since R2026.JUN are on ISO MR 2024 (with named RTGS core payment exceptions still on MR 2019) and that R2026.NOV is not yet the production baseline before that deployment date. · Checked 2026-11-12

      Opened via web search 12 November 2026. Planned schedule, not observed cutover.

      Second-pass 12 November 2026: T2 production deployment still planned 28 November 2026.

    3. Regulatory guidance

      Main Milestones TIPS Release R2026.NOV ↗ — European Central Bank / Eurosystem · TIPS milestones: deployment start 23 November; live in production 27 November with outbound schema switch by 18:35 — distinct from the package 28 November date.

      Eurosystem TIPS R2026.NOV main milestones: user testing 9 October–11 November 2026; MIB production approval 11 November 2026; deployment start 23 November 2026; release live in production 27 November 2026 with outbound schema switch completed by 18:35. Distinct from the 4 September 2026 TARGET Services news item that describes a package shift to 28 November 2026 — use the TIPS-specific milestones for TIPS cutover wording. · Checked 2026-11-12

      PDF opened via web search 12 November 2026. Planned milestones, not confirmation of completed production cutover.

      Second-pass 12 November 2026: still planned milestones only; no separate public MIB-approval notice found beyond the milestone sheet listing 11 November.

  • Swift CBPR+ FI-to-FI payment instructions

    Swift coexistence for in-scope -to-FI payment instructions ended on 22 November 2025; that deadline did not retire every MT reporting, initiation, investigation or correspondence message.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 2 sources
    1. Official requirement

      ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · End of coexistence — 22 November 2025

      Describes current CBPR+ adoption, the 22 November 2025 end of coexistence for in-scope FI-to-FI payment instructions, later migration work and the structured-address milestone. That milestone was previously due in November 2026 and has since been deferred (see swift-sr2026-controlled-extension-2026). · Checked 2026-07-18

      Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.

    2. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Message-specific roadmap beyond November 2025

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  • Swift post-November-2025 contingency processing

    After coexistence, treatment differs by : some instructions are NAKed and selected messages can enter temporary , chargeable since 1 January 2026. This is not continued normal MT-MX coexistence.

    CHECKED 2026-10-11RECHECK BY 2027-01-05

    Sources & standards — 1 source
    1. Official requirementJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · Post-coexistence NAK and contingency-conversion treatment

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  • Swift CBPR+ postal-address usage

    Swift has deferred the requirement to use hybrid or fully structured postal addresses, previously due to start 14 November 2026, after community readiness concerns. No replacement date has been set. Swift has said it will consult industry and communicate revised timing by December 2026 at the latest.

    Checked 6 November 2026: the live campaign/FAQ still display the original date, but the dated 27 August announcement updated 21 September records the deferral. The 12 June 2027 partial release covers other stated message changes; it is not the address-retirement date. The ’s separate by February 2027 decision horizon does not set Swift’s date.

    CHECKED 2026-11-06RECHECK BY 2027-01-05

    Sources & standards — 3 sources
    1. Official requirement

      Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Deferral of SR2026 payments changes, including the structured-address requirement, and the promised update by December 2026

      Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

      Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

      Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

    2. Official requirement

      Unstructured address data is being removed ↗ — Swift · The original requirement now under deferral: hybrid/structured formats and message exceptions

      Original CBPR+ postal-address scope, including the minimum town-and-country requirement, hybrid or fully structured formats, and explicit message exceptions. The 14 November 2026 start date this page names is superseded; see swift-sr2026-controlled-extension-2026. · Checked 2026-11-06

      This is a CBPR+ rule, not a universal ISO 20022 rule. EPC schemes publish their own address dates and scope. The BIC-only option for agents is stated on the companion FAQ (swift-unstructured-address-faq), not on this campaign page. Superseded on the date question only: Swift deferred this requirement on 27 August 2026 with no replacement date set (swift-sr2026-controlled-extension-2026). The scope and format description above is unaffected.

      Follow-up 6 November 2026: current campaign and FAQ still display the original 14 November 2026 date. The dated 27 August announcement updated 21 September separately defers address migration. Keep the format/message-scope guidance distinct from that superseded date. The 12 June 2027 partial-release date and EPC’s by February 2027 decision horizon are not replacement CBPR+ address deadlines.

    3. Official requirement

      Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · 27 August 2026 announcement updated 21 September: address timing remains separate; 12 June 2027 partial release scope is not the address-retirement date.

      Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

      Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

      Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

  • Bank of England high-value payment systems — the November 2026 standards release and its deferral

    The has deferred in full what would have been its November 2026 release of standards for its real-time gross settlement () service and for CHAPS, the Clearing House Automated Payment System. The release carries the messaging standards for CHAPS payments. It did so to stay in step with Swift's decision of 27 August 2026, and because splitting the changes this late would add risk. Its current expectation is a delay of 12 months. Under that expectation the November 2026 changes, including the removal of unstructured address fields, join the scope of the November 2027 release.

    The Bank described this as subject to confirmation and validation inside the Bank and across its community, including Swift and other market infrastructures.

    This wording was seen only as search excerpts of the Bank's notice, and the page was not opened.

    CHECKED 2026-10-04RECHECK BY 2027-01-05

    Sources & standards — 1 source
    1. Scheme-specific rule

      Delay to the November 2026 RTGS (real-time gross settlement) standards release ↗ — Bank of England · Whole release deferred; expected delay of 12 months into the November 2027 release; subject to confirmation and validation; search excerpt, page not opened

      The Bank of England's notice that it has deferred what would have been its November 2026 release of standards for its real-time gross settlement (RTGS) service. That release carries the messaging standards for CHAPS (the Clearing House Automated Payment System) payments.

      Cited for the deferral of the whole release, the reason given (to keep in step with Swift and avoid splitting the changes late), and the Bank's current expectation of a 12-month delay. Under that expectation the November 2026 changes join the November 2027 release. · Checked 2026-10-04

      Known from web-search excerpts on the access date. The Bank's own domain cannot be fetched from this authoring environment, so the page was not opened.

      The address of the notice is dated August 2026, and a trade report dated 28 August 2026 described it. The exact publication day was not established, so only the month is recorded.

      The excerpts agreed on four points. The release is deferred in full. The reason is to match Swift's decision of 27 August 2026. The expected delay is 12 months. The expectation is subject to confirmation and validation.

PRACTISE AND KEEP

Sources for this topic — 7 sources
  1. Official requirement

    ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · ISO 20022 adoption programme milestones and end of MT-MX coexistence

    Describes current CBPR+ adoption, the 22 November 2025 end of coexistence for in-scope FI-to-FI payment instructions, later migration work and the structured-address milestone. That milestone was previously due in November 2026 and has since been deferred (see swift-sr2026-controlled-extension-2026). · Checked 2026-07-18

    Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.

  2. Official requirement

    Cross-Border Payments and Reporting Plus (CBPR+) usage guidelines ↗ — Swift (CBPR+ working group) · The original address structuring requirement and target message shapes

    Defines how ISO 20022 messages (including pacs.008, pacs.009, pacs.002, pacs.004, and camt investigation messages) are used and validated for cross-border payments on the Swift network. · Checked 2026-07-18

    Full guidelines require MyStandards access. Public guidance had set 14 November 2026 as the date after which fully unstructured addresses would be removed for in-scope CBPR+ traffic. The explicit message exceptions included admi.024, camt.025, camt.052, camt.053, camt.054 and camt.060. Swift has since deferred that requirement and set no replacement date. The current fact swift-cbpr-unstructured-address-removal carries the position.

  3. Official requirement

    Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Deferral of the address requirement, announced August 2026

    Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

    Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

    Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

  4. Official requirement

    Fedwire Funds Service ↗ — Federal Reserve Financial Services · Fedwire Funds Service ISO 20022 cut-over date

    Describes the Fedwire Funds Service, the US real-time gross settlement system for immediate, final, and irrevocable US dollar funds transfers. · Checked 2026-07-12

    The Fedwire Funds Service completed its ISO 20022 implementation on 14 July 2025.

  5. Scheme-specific rule

    November 2026 TARGET Services releases confirmed with deployment shifted to 28 November 2026 ↗ — European Central Bank / Eurosystem (TARGET Services) · The Eurosystem's confirmation that the November 2026 TARGET Services release moves to 28 November 2026; search excerpt, page not opened

    The Eurosystem's own confirmation that the November 2026 release for TARGET Services proceeds on 28 November 2026 rather than the originally planned 14 November 2026. The release covers T2 (the euro RTGS system), T2S (securities settlement), TIPS (instant payments) and the Eurosystem Collateral Management System (ECMS). It attributes the shift to the need for all four services to release together as one coordinated package rather than independently.

    T2 will also carry a temporary measure allowing fully unstructured postal addresses in RTGS messages to continue for a limited period, which the notice frames as a response to European-market discussion about readiness for the structured-address migration. Cited here for the confirmed deployment date, the coordinated-release reason for the shift, the existence of the temporary measure, and its readiness rationale. · Checked 2026-11-12

    Corroborated against the Eurosystem's own 28 August 2026 'Reassessment of timeline for November 2026 TARGET Services releases' notice (ecb.mipnews260828), also on ecb.europa.eu.

    Not opened: ecb.europa.eu could not be reached, the same limitation already recorded on other entries in this registry.

    Verified from web-search excerpts of the ECB's own press pages, cross-checked across those two dated notices. Both converge on the same 28 November 2026 date, the same coordinated-release rationale for the shift, and the same description of the temporary unstructured-address measure and its readiness rationale.

    The underlying User Requirements Document for the temporary measure is dated 3 September 2026 (ecb.t2cr260903_T2-0188-SYS-Allow-fully-unstructured-postal-address-format-in-RTGS-messages).

    This entry does not corroborate any causal link to Swift's or the Federal Reserve's own deferral decisions. Those are separate, independently sourced items in this registry; this notice is cited only for the ECB's own confirmed date, reasoning and measure.

    Second-pass web recheck 12 November 2026: package deployment still described as 28 November 2026; service-specific milestone sheets give different TIPS/T2 instants.

  6. Scheme-specific rule

    Delay to the November 2026 RTGS (real-time gross settlement) standards release ↗ — Bank of England · The Bank of England's deferral of its November 2026 RTGS standards release; search excerpt, page not opened

    The Bank of England's notice that it has deferred what would have been its November 2026 release of standards for its real-time gross settlement (RTGS) service. That release carries the messaging standards for CHAPS (the Clearing House Automated Payment System) payments.

    Cited for the deferral of the whole release, the reason given (to keep in step with Swift and avoid splitting the changes late), and the Bank's current expectation of a 12-month delay. Under that expectation the November 2026 changes join the November 2027 release. · Checked 2026-10-04

    Known from web-search excerpts on the access date. The Bank's own domain cannot be fetched from this authoring environment, so the page was not opened.

    The address of the notice is dated August 2026, and a trade report dated 28 August 2026 described it. The exact publication day was not established, so only the month is recorded.

    The excerpts agreed on four points. The release is deferred in full. The reason is to match Swift's decision of 27 August 2026. The expected delay is 12 months. The expectation is subject to confirmation and validation.

  7. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: The renovation analogy and the milestone list compress a schedule that different bodies own and revise; exact dates for later retirements are published per operator and market-practice group and have moved before.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.