TOPIC 34/5118 MINNOT STARTED

Planning and running a performance test round

Turn what stakeholders want into test objectives and a plan, explain it to business and technical readers, prepare a close copy of production, then run the load with care.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: a dress rehearsal for a big event. Before a concert, the crew plans the night. They write down what the show must achieve, how many people will arrive and what the sound must do. They explain the plan to the owner of the hall and to the engineers in different words. Then they set up the hall as close to the real one as they can, and check each cable. Only then do they run the show, watch the clock and stop it if something goes wrong.

Daily List is a to-do list app. Nina, the product owner, expects ten times more users after a big advert. Mei, the test lead, plans a round of performance testing. This means testing how fast and how steadily the app works under load.

Tom, the tester, learns that the plan comes first. After the plan comes a talk with each kind of stakeholder, then the set-up, and last the run. Skipping a step wastes the expensive run.

The picture has a limit. A rehearsal has one stage. A performance test copies a whole system, with data, servers and networks, and the copy is never perfect.

(SYNTHETIC / TRAINING ONLY: Daily List and every person named in this lesson are invented.)

PLAIN WORDS · 1 in this section
stakeholder
a person with an interest in the outcome

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the software.

THE REAL JOB Working out the aims, writing the plan, explaining it, preparing a close copy of production and running the load with care.

  1. Set the aims
  2. Write the plan
  3. Prepare the copy
  4. Run and watch
A performance round

HOW THE PICTURE MAPS

How each part of the picture matches the software
In the pictureIn the software
The goals for the night's showUser-based and technical test objectives
The written run sheet for the crewThe performance test plan
A hall set up like the real oneA test copy close to production
Judging the sound once the crowd is inReading results in the steady state

WHERE THIS PICTURE STOPS

  • A rehearsal has one stage, but a test copies servers, data and networks.
  • A hall can be copied exactly, but a test copy is never perfect.

HOOK

Aim, plan, explain, prepare, run.

REMEMBER IT THIS WAY

A contrast: two neighbours told apart by one test.

Aim, plan, explain, prepare, run. Read results in the , not in the ramp.

What each part of the trick stands for
In the trickWhat it stands for
Aim, plan, explainAgree what the test must show before any run
PrepareA close copy of production, with realistic data
Steady stateThe stage to read results from

TELL A FRIEND

Think of a dress rehearsal: set the goals, write the run sheet, build a hall like the real one, then run and watch.

OFTEN MIXED UP WITH Performance test design. The design lesson shows how to build load profiles and scripts. This lesson shows how to plan the round, speak to stakeholders and run it.

PRACTISE AND KEEP

Sources for this topic — 6 sources
  1. Market practice

    ISTQB Certified Tester Performance Testing Syllabus v1.0 (2018) ↗ — International Software Testing Qualifications Board (ISTQB) · Section 3.4: performance testing activities by life cycle; in continuous integration the concerns are an on-demand environment, which tests to automate and creating the tests; Performance Testing syllabus, version 2018 of 9 December 2018, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 2018 syllabus (9 December 2018, ISTQB general release), read in full text. Used for the objective ids and levels, the performance test types, the seven activities, the risk categories, the protocols, transactions, load profiles, script structure and tool types. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-PT Version 2018, 9 December 2018), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual CT-PT2018 front matter and selected workload, design, execution, analysis and tool sections read; exact sections and gaps in Specialist source ledger. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  2. Market practice

    ISTQB Certified Tester Performance Testing Syllabus v1.0 (2018) ↗ — International Software Testing Qualifications Board (ISTQB) · Section 4.1.1: user-based objectives and technical objectives; questions to ask stakeholders about transactions, metrics and expected improvement; Performance Testing syllabus, version 2018 of 9 December 2018, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 2018 syllabus (9 December 2018, ISTQB general release), read in full text. Used for the objective ids and levels, the performance test types, the seven activities, the risk categories, the protocols, transactions, load profiles, script structure and tool types. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-PT Version 2018, 9 December 2018), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual CT-PT2018 front matter and selected workload, design, execution, analysis and tool sections read; exact sections and gaps in Specialist source ledger. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  3. Market practice

    ISTQB Certified Tester Performance Testing Syllabus v1.0 (2018) ↗ — International Software Testing Qualifications Board (ISTQB) · Section 4.1.2: the performance test plan holds the objective, test objectives, system overview, test types, acceptance criteria (SLAs and baseline), test data and system configuration; Performance Testing syllabus, version 2018 of 9 December 2018, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 2018 syllabus (9 December 2018, ISTQB general release), read in full text. Used for the objective ids and levels, the performance test types, the seven activities, the risk categories, the protocols, transactions, load profiles, script structure and tool types. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-PT Version 2018, 9 December 2018), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual CT-PT2018 front matter and selected workload, design, execution, analysis and tool sections read; exact sections and gaps in Specialist source ledger. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  4. Market practice

    ISTQB Certified Tester Performance Testing Syllabus v1.0 (2018) ↗ — International Software Testing Qualifications Board (ISTQB) · Section 4.1.3: communicating with business-focused and technology-focused stakeholders; Performance Testing syllabus, version 2018 of 9 December 2018, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 2018 syllabus (9 December 2018, ISTQB general release), read in full text. Used for the objective ids and levels, the performance test types, the seven activities, the risk categories, the protocols, transactions, load profiles, script structure and tool types. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-PT Version 2018, 9 December 2018), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual CT-PT2018 front matter and selected workload, design, execution, analysis and tool sections read; exact sections and gaps in Specialist source ledger. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  5. Market practice

    ISTQB Certified Tester Performance Testing Syllabus v1.0 (2018) ↗ — International Software Testing Qualifications Board (ISTQB) · Section 4.2.8: set up the system, deploy the environment, set up load generation and monitoring; performance is a non-linear function of the environment; service virtualization; validate before running; Performance Testing syllabus, version 2018 of 9 December 2018, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 2018 syllabus (9 December 2018, ISTQB general release), read in full text. Used for the objective ids and levels, the performance test types, the seven activities, the risk categories, the protocols, transactions, load profiles, script structure and tool types. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-PT Version 2018, 9 December 2018), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual CT-PT2018 front matter and selected workload, design, execution, analysis and tool sections read; exact sections and gaps in Specialist source ledger. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  6. Market practice

    ISTQB Certified Tester Performance Testing Syllabus v1.0 (2018) ↗ — International Software Testing Qualifications Board (ISTQB) · Section 4.3: execution against a load profile, steady state, ramp-up and ramp-down, monitoring, time synchronisation and failure handling; Performance Testing syllabus, version 2018 of 9 December 2018, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 2018 syllabus (9 December 2018, ISTQB general release), read in full text. Used for the objective ids and levels, the performance test types, the seven activities, the risk categories, the protocols, transactions, load profiles, script structure and tool types. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-PT Version 2018, 9 December 2018), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual CT-PT2018 front matter and selected workload, design, execution, analysis and tool sections read; exact sections and gaps in Specialist source ledger. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.