TOPIC 02/5118 MINNOT STARTED

Performance test design

Plan a load test from real traffic: who does what, how often, with what pauses, how fast the load climbs and what counts as a pass.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: planning a for a bridge. Before you test a bridge, you ask how many cars cross, how fast, for how long, and what you will measure. You do not just park a thousand trucks on it and see what happens.

Daily List is a to-do list app. Every Monday at eight, many people open it to see their day. Mei asks Tom to plan a test for that rush. Tom does not pick a round number such as one hundred users. He looks at real numbers from last Monday.

He finds how many people are on the app at once. He finds what they do, and how long they pause between taps. He writes it down as a plan for the test. The plan says how fast the test load should climb, how long it should stay, and what counts as a pass.

This is performance test design: deciding what load to send, how to send it and how to judge the result.

The picture has a limit. A bridge is one object with one load. An app has many kinds of action, and each one loads a different part.

(SYNTHETIC / TRAINING ONLY: Daily List and every person named in this lesson are invented.)

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the software.

THE REAL JOB Planning a load from real traffic, with human pauses, a gentle climb and a clear pass rule.

  1. Count the traffic
  2. Space the actions
  3. Climb gently
  4. Judge by agreed rules
Count, space, climb, judge

HOW THE PICTURE MAPS

How each part of the picture matches the software
In the pictureIn the software
Cars crossing the bridgePretend users on the app
Counting the cars at rush hourReading real traffic from the busiest hour
Gaps between the carsThink time
Letting the traffic build upRamp-up

WHERE THIS PICTURE STOPS

  • A bridge carries one kind of load. An app has many kinds of action.
  • Cars never choose to stop and think. Users do.
  • A bridge test is done once. A load test is repeated.

HOOK

Count, space, climb, judge.

REMEMBER IT THIS WAY

A chunk: a long list grouped so it is easier to hold.

Copy three things from real Monday traffic: how many people are on at once, what they do, and how long they pause.

What each part of the trick stands for
In the trickWhat it stands for
How manyhow many people are on the app at once
What they domany kinds of action
How long they pausepause between taps

TELL A FRIEND

Planning a bridge test: count the cars, set the gaps between them, let the load build and agree what counts as a pass.

OFTEN MIXED UP WITH Reading performance results. The reading lesson explains the numbers a run gives. This lesson plans the run that makes them.

PRACTISE AND KEEP

Sources for this topic — 4 sources
  1. Market practice

    A Proof for the Queuing Formula: L = lambda W (J. D. C. Little, Operations Research 9(3), 1961) ↗ — INFORMS · The mean number in a stable system equals the arrival rate times the mean time spent in it (search excerpt, page not opened)

    Shows that the mean number in a stable system equals the arrival rate times the mean time in the system. The stability condition is the part test designers must respect. · Checked 2026-11-06

    Actual1961 paper body(pp383–387) read 6 November 2026 via MIT-hosted copy https://fisherp.scripts.mit.edu/wordpress/wp-content/uploads/2015/11/ContentServer.pdf . Canonical DOI retained here; the DOI endpoint itself was not opened. Mathematical OCR limited; no source symbol/figure fidelity claimed and no image reproduced.

  2. Market practice

    ISTQB Certified Tester Performance Testing Syllabus v1.0 (2018) ↗ — International Software Testing Qualifications Board (ISTQB) · Mirror copy of the publisher PDF (ISTQB syllabus CT-PT Version 2018, 9 December 2018, ISTQB GA release), version checked against the document's own front matter, read in full text: the syllabus is titled Foundation Level Specialist Syllabus, Performance Testing. It has five chapters: basic concepts, performance measurement fundamentals, performance testing in the software lifecycle, performance testing tasks and tools

    Version 2018 syllabus (9 December 2018, ISTQB general release), read in full text. Used for the objective ids and levels, the performance test types, the seven activities, the risk categories, the protocols, transactions, load profiles, script structure and tool types. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-PT Version 2018, 9 December 2018), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual CT-PT2018 front matter and selected workload, design, execution, analysis and tool sections read; exact sections and gaps in Specialist source ledger. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  3. Market practice

    Test types (Grafana k6 documentation) ↗ — Grafana Labs · Test types and the shape of a load profile: ramp up, hold, ramp down (search excerpt, page not opened)

    Per the search excerpt, the k6 documentation names smoke, average-load, stress, soak, spike and breakpoint tests and tells readers to start small and build up. Soak runs are long, spike tests are sudden surges. Practitioner guidance, not a standard. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  4. Market practice

    Component Reference (Apache JMeter user manual) ↗ — Apache Software Foundation · The Thread Group ramp-up period is the time taken to start all threads; a timer adds a pause between requests (search excerpt, page not opened)

    Describes the Thread Group ramp-up period (time to start all threads), the Constant Timer (same pause for each thread) and post-processors such as the extractors. Used as the one tool example; vendor documentation. · Checked 2026-11-06

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail. V27 supplement, 6 November 2026: relevant primary page sections actually opened; implementation-specific current product guidance, not universal standard. See full V27 audit for version and access scope.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.