TOPIC 41/5416 MINNOT STARTED

Practice: process and rule models, deriving tests from them, good modelling and models that drive tests, as they are asked

See how Acceptance Testing questions on process and rule models, deriving tests, good modelling and models that drive tests are built. Practice cannot predict a pass.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: a train map and a fare table. A train map shows stations where a journey starts and ends. It shows stops where work is done. It also shows junctions where a train takes one line or splits into two that run together. A separate fare table says what a ticket costs for each kind of traveller and time of day.

To check the railway, a tester plans journeys. One journey for each route covers all the routes. One journey for each row of the fare table covers all the fares. The planner and the tester agree on what counts as covered before they start.

A good map shows only the lines being checked. It is drawn together by the planner and the tester, and it carries notes on risks and priorities.

Kept simple: a map is a picture of the model, not of the notation.

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the software.

THE REAL JOB Working small and harder cases on drawing process and rule models, deriving tests from them, good modelling practice and using models to drive acceptance tests.

  1. Draw the flow
  2. Put rules in a table
  3. Agree the coverage items
  4. Derive and keep tests
A harder case

HOW THE PICTURE MAPS

How each part of the picture matches the software
In the pictureIn the software
A train map with stations, stops and junctionsA business process drawing
A fare table for each kind of travellerA rule table
One journey for every route and every fare rowTests that cover the paths and the rules
Notes on the map about risks and prioritiesNotes linked to stories and risks

WHERE THIS PICTURE STOPS

  • A train map is fixed, while a process model changes with the product.
  • A traveller picks one journey, but a tester needs a set of journeys that covers the model.
  • Two business-choice paths do not establish coverage of every concurrent interleaving or race.

HOOK

Draw only what you test, cover every path and rule.

REMEMBER IT THIS WAY

A contrast: two neighbours told apart by one test.

An exclusive gateway picks one path, while a parallel gateway starts paths that run together.

What each part of the trick stands for
In the trickWhat it stands for
exclusive gatewaysends the flow down one path
parallel gatewaystarts paths that run at the same time

TELL A FRIEND

Think of a train map and a fare table. The tester plans one journey for each route and each fare row, and notes the risks on the map.

OFTEN MIXED UP WITH Process and rule models for acceptance tests: drawing flows and decision tables, then deriving tests. That lesson teaches drawing flows and decision tables and deriving tests. This lesson trains the way questions on them are asked.

PRACTISE AND KEEP

Sources for this topic — 5 sources
  1. Market practice

    ISTQB Certified Tester Acceptance Testing (CT-AcT) syllabus ↗ — International Software Testing Qualifications Board (ISTQB) · ACT-3.1.1 (build a BPMN or DMN model); Acceptance Testing syllabus, version 2019 of 21 June 2019, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 1.0 syllabus (21 June 2019), read in full text. Used for the objective ids and levels, the modelling objectives in chapter 3, the four pillars of user experience requirements analysis in section 4.2.1 and the scope that leaves out operational acceptance testing. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-AcT v1.0, 21 June 2019), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual related substantive chapters 1–5 and Appendix text reviewed for Acceptance2019; not an assertion that every source figure was visually reviewed. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  2. Market practice

    ISTQB Certified Tester Acceptance Testing (CT-AcT) syllabus ↗ — International Software Testing Qualifications Board (ISTQB) · ACT-3.2.1 (derive tests from a model to a coverage rule); Acceptance Testing syllabus, version 2019 of 21 June 2019, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 1.0 syllabus (21 June 2019), read in full text. Used for the objective ids and levels, the modelling objectives in chapter 3, the four pillars of user experience requirements analysis in section 4.2.1 and the scope that leaves out operational acceptance testing. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-AcT v1.0, 21 June 2019), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual related substantive chapters 1–5 and Appendix text reviewed for Acceptance2019; not an assertion that every source figure was visually reviewed. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  3. Market practice

    ISTQB Certified Tester Acceptance Testing (CT-AcT) syllabus ↗ — International Software Testing Qualifications Board (ISTQB) · ACT-3.3.1 (good practice in process and rule models); Acceptance Testing syllabus, version 2019 of 21 June 2019, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 1.0 syllabus (21 June 2019), read in full text. Used for the objective ids and levels, the modelling objectives in chapter 3, the four pillars of user experience requirements analysis in section 4.2.1 and the scope that leaves out operational acceptance testing. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-AcT v1.0, 21 June 2019), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual related substantive chapters 1–5 and Appendix text reviewed for Acceptance2019; not an assertion that every source figure was visually reviewed. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  4. Market practice

    ISTQB Certified Tester Acceptance Testing (CT-AcT) syllabus ↗ — International Software Testing Qualifications Board (ISTQB) · ACT-3.3.2 (models for ATDD); Acceptance Testing syllabus, version 2019 of 21 June 2019, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 1.0 syllabus (21 June 2019), read in full text. Used for the objective ids and levels, the modelling objectives in chapter 3, the four pillars of user experience requirements analysis in section 4.2.1 and the scope that leaves out operational acceptance testing. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-AcT v1.0, 21 June 2019), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual related substantive chapters 1–5 and Appendix text reviewed for Acceptance2019; not an assertion that every source figure was visually reviewed. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  5. Market practice

    ISTQB Exam Structures & Rules Tables v1.20 (25 October 2026) ↗ — International Software Testing Qualifications Board (ISTQB) · The board's structure tables set the shape of the Acceptance Testing paper (search excerpt, page not opened)

    Sets how each International Software Testing Qualifications Board (ISTQB) exam is built: question counts per K-level, time and rules. The figures change between versions, so read the current table. Practitioner guidance, not a standard. · Checked 2026-11-07

    Actual publisher PDF opened 7 November 2026: front matter/version history, Overview and CTFLtablesprinted pp 4–6 read. Front matter is v1.20, 25 October 2026, although browser title/file metadata still saysv1.19.xlsx. CTFLallocation is 40 questions/40 points/pass 26/60 minutes/75 extended;Kmix 8/24/8;chapter 8/6/4/11/9/2. Other qualification tables were not audited in this pass.

    Previous URLwas https://istqb.org/wp-content/uploads/2026/05/ISTQB_Exam-Structure-and-Rules-Tables_v1.18.pdf and the prior review used only a search excerpt; do not treat that earlier access as a full reading. Copyright notice does not establish unrestricted commercial figure extraction. Paraphrased facts and original cases only.

    V52 additionally read current v1.20 front/history, overview p 4, ATp 7, TAEp 10 and TMp 11 on 7 November 2026. Counts/points/pass/ordinary/extended minutes: TM50/88/58/120/150; TAE40/66/43/90/113; AT40/52/34/90/113. Suggested point columns do not negate Rules §5.2.2 exceptions. Other qualifications’ earlier reviews remain separately scoped.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.