TOPIC 39/5420 MINNOT STARTED

Practice: goals, requirements, criteria, the analyst and driving development, as they are asked

See how Acceptance Testing questions on goals, needs, requirements, criteria, business analysts and testers, and driving development are built. Practice cannot predict a pass.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: tasting a new dish before it is served. A restaurant owner wants happy guests. That is the goal. The owner learns that guests want a quick lunch. That is the need. The head chef writes down what the lunch dish must be. Those are the requirements.

Before cooking, the chef and the taster agree what ready to serve means. It is hot, it is salted and it arrives in ten minutes. These are the criteria. The taster then plans the tasting steps. If the chef writes something vague, such as nice and quick, the taster has to guess.

The chef and the taster plan the tasting together by the risks, and each learns the other's craft.

Kept simple: a dish is a picture of the chain, not of the real documents.

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the software.

THE REAL JOB Working small and harder cases on goals, needs and requirements, criteria and tests, requirement quality, the two roles and how acceptance tests drive development.

  1. Climb the ladder
  2. Write true or false criteria
  3. Derive the tests
  4. Work together early
A harder case

HOW THE PICTURE MAPS

How each part of the picture matches the software
In the pictureIn the software
The owner wants happy guests, then a quick lunch, then a written dishGoal, need and requirement
Chef and taster agree what ready to serve meansAcceptance criteria written together
A vague note such as nice and quickA vague requirement that leads to guesses
Chef and taster plan by the risks and learn each other's craftAnalysts and testers working together

WHERE THIS PICTURE STOPS

  • A dish is judged once, but an acceptance test is run again after each change.
  • A taster works alone, while acceptance testing involves many roles.
  • A numeric target still needs agreed setup, workload and measurement boundaries; the five seconds is the synthetic case, not a universal limit.

HOOK

Goal, need, requirement, criterion, test: write them together.

REMEMBER IT THIS WAY

A contrast: two neighbours told apart by one test.

A criterion says what to test, while a test says how to verify it.

What each part of the trick stands for
In the trickWhat it stands for
criteriona true or false statement about what to test
testthe way to verify the criterion

TELL A FRIEND

Think of a chef and a taster who agree what ready to serve means before the dish is cooked, and plan the tasting together.

OFTEN MIXED UP WITH Goals, requirements, criteria and the analyst: how acceptance tests begin. That lesson teaches how acceptance tests begin. This lesson trains the way questions on goals, criteria and the analyst are asked.

PRACTISE AND KEEP

Sources for this topic — 8 sources
  1. Market practice

    ISTQB Certified Tester Acceptance Testing (CT-AcT) syllabus ↗ — International Software Testing Qualifications Board (ISTQB) · ACT-1.1.1 (goals, needs and requirements); Acceptance Testing syllabus, version 2019 of 21 June 2019, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 1.0 syllabus (21 June 2019), read in full text. Used for the objective ids and levels, the modelling objectives in chapter 3, the four pillars of user experience requirements analysis in section 4.2.1 and the scope that leaves out operational acceptance testing. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-AcT v1.0, 21 June 2019), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual related substantive chapters 1–5 and Appendix text reviewed for Acceptance2019; not an assertion that every source figure was visually reviewed. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  2. Market practice

    ISTQB Certified Tester Acceptance Testing (CT-AcT) syllabus ↗ — International Software Testing Qualifications Board (ISTQB) · ACT-1.1.2 (requirement, criteria and test link); Acceptance Testing syllabus, version 2019 of 21 June 2019, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 1.0 syllabus (21 June 2019), read in full text. Used for the objective ids and levels, the modelling objectives in chapter 3, the four pillars of user experience requirements analysis in section 4.2.1 and the scope that leaves out operational acceptance testing. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-AcT v1.0, 21 June 2019), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual related substantive chapters 1–5 and Appendix text reviewed for Acceptance2019; not an assertion that every source figure was visually reviewed. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  3. Market practice

    ISTQB Certified Tester Acceptance Testing (CT-AcT) syllabus ↗ — International Software Testing Qualifications Board (ISTQB) · ACT-1.1.3 (quality of requirements and criteria matters); Acceptance Testing syllabus, version 2019 of 21 June 2019, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 1.0 syllabus (21 June 2019), read in full text. Used for the objective ids and levels, the modelling objectives in chapter 3, the four pillars of user experience requirements analysis in section 4.2.1 and the scope that leaves out operational acceptance testing. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-AcT v1.0, 21 June 2019), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual related substantive chapters 1–5 and Appendix text reviewed for Acceptance2019; not an assertion that every source figure was visually reviewed. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  4. Market practice

    ISTQB Certified Tester Acceptance Testing (CT-AcT) syllabus ↗ — International Software Testing Qualifications Board (ISTQB) · ACT-1.2.1 (acceptance testing and analysis activities); Acceptance Testing syllabus, version 2019 of 21 June 2019, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 1.0 syllabus (21 June 2019), read in full text. Used for the objective ids and levels, the modelling objectives in chapter 3, the four pillars of user experience requirements analysis in section 4.2.1 and the scope that leaves out operational acceptance testing. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-AcT v1.0, 21 June 2019), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual related substantive chapters 1–5 and Appendix text reviewed for Acceptance2019; not an assertion that every source figure was visually reviewed. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  5. Market practice

    ISTQB Certified Tester Acceptance Testing (CT-AcT) syllabus ↗ — International Software Testing Qualifications Board (ISTQB) · ACT-1.2.2 (tester and analyst collaboration); Acceptance Testing syllabus, version 2019 of 21 June 2019, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 1.0 syllabus (21 June 2019), read in full text. Used for the objective ids and levels, the modelling objectives in chapter 3, the four pillars of user experience requirements analysis in section 4.2.1 and the scope that leaves out operational acceptance testing. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-AcT v1.0, 21 June 2019), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual related substantive chapters 1–5 and Appendix text reviewed for Acceptance2019; not an assertion that every source figure was visually reviewed. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  6. Market practice

    ISTQB Certified Tester Acceptance Testing (CT-AcT) syllabus ↗ — International Software Testing Qualifications Board (ISTQB) · ACT-1.2.3 (ATDD and BDD); Acceptance Testing syllabus, version 2019 of 21 June 2019, mirror copy of the publisher PDF, version checked against front matter, opened (text layer read)

    Version 1.0 syllabus (21 June 2019), read in full text. Used for the objective ids and levels, the modelling objectives in chapter 3, the four pillars of user experience requirements analysis in section 4.2.1 and the scope that leaves out operational acceptance testing. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-AcT v1.0, 21 June 2019), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual related substantive chapters 1–5 and Appendix text reviewed for Acceptance2019; not an assertion that every source figure was visually reviewed. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  7. Market practice

    ISTQB Exam Structures & Rules Tables v1.20 (25 October 2026) ↗ — International Software Testing Qualifications Board (ISTQB) · The board's structure tables set the shape of the Acceptance Testing paper (search excerpt, page not opened)

    Sets how each International Software Testing Qualifications Board (ISTQB) exam is built: question counts per K-level, time and rules. The figures change between versions, so read the current table. Practitioner guidance, not a standard. · Checked 2026-11-07

    Actual publisher PDF opened 7 November 2026: front matter/version history, Overview and CTFLtablesprinted pp 4–6 read. Front matter is v1.20, 25 October 2026, although browser title/file metadata still saysv1.19.xlsx. CTFLallocation is 40 questions/40 points/pass 26/60 minutes/75 extended;Kmix 8/24/8;chapter 8/6/4/11/9/2. Other qualification tables were not audited in this pass.

    Previous URLwas https://istqb.org/wp-content/uploads/2026/05/ISTQB_Exam-Structure-and-Rules-Tables_v1.18.pdf and the prior review used only a search excerpt; do not treat that earlier access as a full reading. Copyright notice does not establish unrestricted commercial figure extraction. Paraphrased facts and original cases only.

    V52 additionally read current v1.20 front/history, overview p 4, ATp 7, TAEp 10 and TMp 11 on 7 November 2026. Counts/points/pass/ordinary/extended minutes: TM50/88/58/120/150; TAE40/66/43/90/113; AT40/52/34/90/113. Suggested point columns do not negate Rules §5.2.2 exceptions. Other qualifications’ earlier reviews remain separately scoped.

  8. Market practice

    International Organization for Standardization standard 29148:2018, Systems and software engineering, Life cycle processes, Requirements engineering ↗ — International Organization for Standardization · ActualpublicISOcatalogue edition/status reviewed7November2026: ISO/IEC/IEEE29148:2018confirmed2024. Historical2011referencebelongs to2019syllabusbibliography. Licensedclausesnotread; draftdevelopmentnotpublishedreplacement.

    Official standard page. Search excerpt says the standard covers requirements processes, the information items they produce, their contents and format guidance, and that the 2018 edition was confirmed in 2024. A vendor page (Modern Requirements) says it defines papers including stakeholder, system and software requirements specifications; not confirmed against the standard text, which is paid and was not read. Search excerpt only. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.