TOPIC 33/4320 MINNOT STARTED

Scalability and capacity testing: how much more can it take?

Find out how much work a system takes while it meets its goals, and whether more computers let it take more. Learn to read a step-load table and spot the saturation point.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: a supermarket with checkout lanes. A supermarket manager wants two answers. How many shoppers can the shop serve in an hour before the queue gets too long? And if she opens more lanes next month, will the shop serve more shoppers in step?

Daily List is a to-do list app. Until now Tom has seen it work with a few tasks in each list. Now Nina says families want lists with thousands of tasks. The company also hopes for many more users next year.

Tom asks the manager's two questions. How big can it get before it stops meeting its goals? That is . And if the team adds more computers, does it grow in step? That is .

He finds that scrolling gets slow and jerky when one list has too many tasks. He also finds that a second computer helps the log-in a lot and helps the saving only a little. Both computers wait for one shared store of data.

The picture has a limit. Shoppers share only the lanes. Software parts share much more, such as one data store. So more lanes do not always mean more shoppers served.

(SYNTHETIC / TRAINING ONLY: Daily List and every person named in this lesson are invented.)

PLAIN WORDS · 1 in this section
scalability
How well a system keeps working as it grows.

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the software.

THE REAL JOB Finding the highest load that still meets the goals, and seeing whether more computers let it grow in step.

  1. Write the goals
  2. Raise the load in steps
  3. Find where work done goes flat
  4. Add computers and repeat
Steps, flat spot, goals

HOW THE PICTURE MAPS

How each part of the picture matches the software
In the pictureIn the software
Shoppers at the shopUsers of the system
Checkout lanesComputers sharing the work
The length of the queueResponse time
One back room every lane sharesOne shared data store
The manager's limit on queue timeThe response time goal

WHERE THIS PICTURE STOPS

  • Shoppers share only the lanes. Software parts share much more.
  • A shop is full when the doors are full. A system can slow down long before it is full.
  • A manager can see the queue. A tester needs measured numbers.

HOOK

Raise by steps, find where the line stops moving.

REMEMBER IT THIS WAY

A contrast: two neighbours told apart by one test.

Capacity asks how big it can get before it misses its goals. Scalability asks whether more computers let it grow in step.

What each part of the trick stands for
In the trickWhat it stands for
Capacityhow big can it get before it stops meeting its goals
Scalabilityif the team adds more computers, does it grow in step

TELL A FRIEND

A shop manager checks how many shoppers the lanes serve before the queue gets too long, then opens more lanes and checks again.

OFTEN MIXED UP WITH Performance analysis and bottlenecks. That lesson is about finding what slows a system down. This lesson is about how much work it takes and how that grows.

PRACTISE AND KEEP

Sources for this topic — 8 sources
  1. Market practice

    ISTQB Certified Tester Performance Testing Syllabus v1.0 (2018) ↗ — International Software Testing Qualifications Board (ISTQB) · Mirror copy of the publisher PDF (ISTQB syllabus CT-PT Version 2018, 9 December 2018, ISTQB GA release), version checked against the document's own front matter, read in full text: section 1.2 (PTFL-1.2.1, K2): capacity testing determines how many users or transactions a system will support and still meet its stated performance objectives; the same section defines scalability, endurance, spike, stress, load and concurrency testing

    Version 2018 syllabus (9 December 2018, ISTQB general release), read in full text. Used for the objective ids and levels, the performance test types, the seven activities, the risk categories, the protocols, transactions, load profiles, script structure and tool types. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-PT Version 2018, 9 December 2018), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual CT-PT2018 front matter and selected workload, design, execution, analysis and tool sections read; exact sections and gaps in Specialist source ledger. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  2. Market practice

    Scalability Testing: What It Is, Why It Matters, and How to Do It Right ↗ — Testomat.io · Scalability testing checks how a system copes as the workload grows, and raises the load in stages (search excerpt, page not opened)

    Vendor article describing scalability testing as checking how a system copes as the workload grows, and how it differs from capacity testing. Practitioner guidance. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number; read as a search excerpt only. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  3. Market practice

    A guide to scalability testing with examples ↗ — Tricentis · Scaling up adds power to one machine, scaling out adds machines; throughput, latency and resource use are the usual measures (search excerpt, page not opened)

    Vendor guide that separates scaling up (a bigger machine) from scaling out (more machines) and lists throughput, latency and resource use as measures. Practitioner guidance. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number; read as a search excerpt only. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  4. Market practice

    ISO/IEC 25010:2023 (ISO catalogue entry) ↗ — International Organization for Standardization (ISO) · ISO catalogue entry for the 2023 edition of the product quality model; where scalability sits in that model was not confirmed (search excerpt, page not opened)

    Per the search excerpt, the catalogue entry describes ISO/IEC 25010:2023 as the second edition of the product quality model. The standard text is paid and was not read. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Second edition, 2023. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  5. Market practice

    Dropped iterations (Grafana k6 documentation) ↗ — Grafana Labs · Grafana k6 docs: dropped_iterations metric causes; 'Running large tests' guide on generator CPU/memory/swap headroom and distributed runs. Search excerpts, pages not opened. Exact percentage thresholds in the guide left out (figures can change). MoT/Grafana forum threads are the learner questions.

    Explains the dropped_iterations counter and its two usual causes. · Checked 2026-10-19

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  6. Market practice

    Running large tests (Grafana k6 documentation) ↗ — Grafana Labs · Grafana k6 docs: dropped_iterations metric causes; 'Running large tests' guide on generator CPU/memory/swap headroom and distributed runs. Search excerpts, pages not opened. Exact percentage thresholds in the guide left out (figures can change). MoT/Grafana forum threads are the learner questions.

    Advises keeping CPU and memory headroom on the load generator, avoiding swap, and distributed runs. · Checked 2026-10-19

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  7. Market practice

    ISTQB Certified Tester Advanced Level Technical Test Analyst (CTAL-TTA) Syllabus v4.0 ↗ — International Software Testing Qualifications Board (ISTQB) · Opened primary source, 6 November 2026. ISTQB CTAL-TTA v4.0, 30 June 2021: Opened primary PDF; §§1.2,4.2–4.9,5.2.1 relevant passages read. Preserve 2011 model vocabulary, roles, first-response/turnaround definitions, six installation objectives and eight website checklist items.

    Version 4.0 syllabus (footer date 2021-06-30), read in full text. Used for the objective ids, the review checklists in sections 5.2.1 and 5.2.2, dynamic and static analysis, white-box detail and compatibility. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CTAL-TTA v4.0, dated 2021-06-30 in its footer), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual CTAL-TTA4.0 §3.3 dynamic-analysis body reviewed; no claim of a full-syllabus review. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  8. Market practice

    Thresholds (Grafana k6 documentation) ↗ — Grafana Labs · Opened primary source, 6 November 2026. Grafana k6 current product documentation: Opened checks versus threshold pass/fail and periodic abort evaluation (including cloud delay); opened open/closed model guidance. Not a general standard or fixed release claim.

    Describes thresholds as pass or fail limits on metrics such as http_req_duration, set in the options of a script, and says the k6 command returns a non-zero exit code when a test fails. Vendor documentation. Practitioner guidance, not a standard. · Checked 2026-11-06

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail. V27 supplement, 6 November 2026: relevant primary page sections actually opened; implementation-specific current product guidance, not universal standard. See full V27 audit for version and access scope.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.