Reviewing a system design with a checklist
Read a drawing of boxes and arrows with a checklist, and write what you find as questions before any code exists.
L1–L4 are part of the Pro pass
L0 Explain simply
Analogy: reading a house plan before the builders come. A plan shows rooms, doors and pipes as lines on paper. A door that opens into a wall is easy to move on paper. It is hard to move once the wall is built.
Daily List is a to-do list app. Leo, the developer, draws a plan for a new feature that puts tasks into a calendar. The drawing has five boxes: the phone app, the server, the database, a calendar service run by another company, and a notification service. Arrows show which box talks to which.
Tom, the tester, reads the drawing before Leo writes any code. This is a . It means reading a plan of how a system will be built. The aim is to find problems while they are cheap to fix.
Tom asks the same questions of every drawing. One is: what happens if this box stops? That question hunts for a , which is one part that stops everything when it stops. Another is: if this box changes, what else breaks? That question looks at coupling, which is how tightly parts depend on each other.
The picture has a limit. A house plan is drawn to scale and shows nearly everything. A software drawing is a sketch, and it leaves out much of what the system will do.
(SYNTHETIC / TRAINING ONLY: Daily List and every person named in this lesson are invented.)
PICTURE IT
The picture is the one the lesson above opens with. The table below shows how each part of it matches the software.
THE REAL JOB Reading a drawing of a system with the same questions each time, so problems are found while they are cheap to fix.
- Read the goal
- Walk the data path
- Ask the checklist
- Rank and write questions
HOW THE PICTURE MAPS
| In the picture | In the software |
|---|---|
| The house plan | The drawing of boxes and arrows |
| The door that opens into a wall | A fault found on paper |
| The reader of the plan | The reviewer |
| The same questions for every plan | The checklist of seven families |
WHERE THIS PICTURE STOPS
- A house plan is drawn to scale. A software drawing is a sketch and leaves out much.
- A plan is finished before building. A system design keeps changing, so the review is redone.
- A plan reader can see every room. A reviewer sees only what is drawn and must ask what is missing.
HOOK
Read the plan, ask the same questions.
REMEMBER IT THIS WAY
A sequence: the real steps, in order.
Goal, path, questions, rank.
| In the trick | What it stands for |
|---|---|
| Goal | What the system must do, and for whom |
| Path | Follow one piece of data along the drawing |
| Questions | Ask the checklist at each box and arrow |
| Rank | Order findings by harm and cost to fix, and write them as questions |
TELL A FRIEND
Read the goal and walk one piece of data along the drawing. Ask the same questions at each box and arrow, then rank what you find and write it as questions.
OFTEN MIXED UP WITH Reviews in practice: types, roles and steps. The review-types lesson covers who takes part in a review and how it runs. This lesson covers what to ask when the thing under review is a system drawing.
PRACTISE AND KEEP
Sources for this topic — 7 sources
- Market practice
ISTQB Certified Tester Advanced Level Technical Test Analyst (CTAL-TTA) Syllabus v4.0 ↗ — International Software Testing Qualifications Board (ISTQB) · Mirror copy of the publisher PDF (ISTQB syllabus CTAL-TTA v4.0, 30 June 2021), read in full text: TTA-5.2.1 (K4) analyse an architectural design and identify problems according to a checklist provided in the syllabus | section 5.2.1 Architectural Reviews gives a checklist for the time behaviour of websites with eight items: connection pooling, load balancing, distributed processing, caching, lazy instantiation, transaction concurrency (items quoted in the syllabus from a web source)
Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CTAL-TTA v4.0, dated 2021-06-30 in its footer), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.
Specialist review 6 November 2026: Actual CTAL-TTA4.0 §3.3 dynamic-analysis body reviewed; no claim of a full-syllabus review. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.
- Market practice
Architecture checklists (archman.dev) ↗ — archman.dev · A review looks at performance, security, scalability and ease of watching as well as function; a single point of failure is a top finding to write down with a plan; each check should be answerable yes or no (search excerpt, page not opened; practitioner page)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
ISO/IEC 25010 product quality model ↗ — ISO 25000 portal · ISO 25000 portal summary of ISO/IEC 25010: the product quality model lists qualities such as reliability, security, maintainability and portability (search excerpt, page not opened; the standard text was not read)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Quality scenarios and evaluating an architecture (arc42 documentation tip) ↗ — arc42 · Quality scenarios are used to analyse and evaluate an architecture; the quality tree can serve as a checklist; a table pairs quality goal, scenario, solution approach and risk (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Simplified educational illustration
Payments Signal editorial teaching models — Payments Signal
What this simplifies: Daily List, its drawing, the four planted problems and the people are invented. The seven families of questions are written for this academy and are not copied from any standard or syllabus. Real designs are larger and findings are less clear.
Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.
- Market practice
ISTQB Certified Tester Advanced Level Syllabus Technical Test Analyst (older edition, BCS-hosted copy) ↗ — BCS, The Chartered Institute for IT (hosting an ISTQB syllabus) · An older edition lists architecture review examples such as connection pooling, load balancing, caching and lazy instantiation (search excerpt, page not opened). Version 4.0 of the syllabus, read in full from a mirror copy, lists these items and more in section 5.2.1.
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail. Version: an edition before 4.0; the exact edition was not identified.
- Market practice
ISTQB Certified Tester Advanced Level Technical Test Analyst (CTAL-TTA) Syllabus v4.0 ↗ — International Software Testing Qualifications Board (ISTQB) · Opened primary source, 6 November 2026. ISTQB CTAL-TTA v4.0, 30 June 2021: Opened primary PDF; §§1.2,4.2–4.9,5.2.1 relevant passages read. Preserve 2011 model vocabulary, roles, first-response/turnaround definitions, six installation objectives and eight website checklist items.
Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CTAL-TTA v4.0, dated 2021-06-30 in its footer), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.
Specialist review 6 November 2026: Actual CTAL-TTA4.0 §3.3 dynamic-analysis body reviewed; no claim of a full-syllabus review. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.