The life of a defect
A defect moves through stages, such as new, fixed, retested and closed. At each stage one person owns the next step, so a bug does not sit forgotten.
L1–L4 are part of the Pro pass
L0 Explain simply
Analogy: a parcel. A parcel has stages: sent, in transit, delivered, signed for. At each stage someone has it in their hands. You can look at the tracking page and know where it is.
A bug at Daily List, a to-do list app, has stages too. Tom, the tester, reports a bug and it starts as new. The current stage is the : the current stage of a defect, such as new, open or fixed.
At each stage one person must act next. That person is the : the person who must act on a defect next. When Tom reports it, Mei or Nina decides who gets it. Then Leo, the developer, owns it until it is fixed.
The last stage is a : a defect that is fixed and checked, or is decided to need no action. Closed does not always mean fixed.
The picture has a limit. A parcel only goes forward. A bug can go back, for example when a fix fails the retest.
(SYNTHETIC / TRAINING ONLY: Daily List and every person named in this lesson are invented.)
PLAIN WORDS · 1 in this section
- retest
- test again
PICTURE IT
The picture is the one the lesson above opens with. The table below shows how each part of it matches the software.
THE REAL JOB Following a bug from new to closed, so that at every stage one person owns the next step and every closing has a reason.
- What stage is it in
- Who acts next
- Why was it closed
HOW THE PICTURE MAPS
| In the picture | In the software |
|---|---|
| Sent | The defect is new |
| In transit | Assigned and being fixed |
| Delivered | Fixed in a build |
| Signed for | Retested and closed |
WHERE THIS PICTURE STOPS
- A parcel only goes forward. A defect can go back when a retest fails.
- A parcel is always delivered or lost. A defect can be closed with no change.
- A parcel has a tracking page. A defect list is only as good as the people who update it.
HOOK
Stage, owner, reason.
REMEMBER IT THIS WAY
A contrast: two neighbours told apart by one test.
Closed does not always mean fixed. Ask whether the defect was fixed and checked, or decided to need no action.
| In the trick | What it stands for |
|---|---|
| Fixed | fixed and checked |
| No action | decided to need no action |
TELL A FRIEND
A parcel has stages and each has a holder. A defect has statuses and each has an owner who acts next.
OFTEN MIXED UP WITH Writing a defect report: severity and priority. The defect reports lesson shows what to write when a bug is found. This lesson follows the bug after the report is filed.
PRACTISE AND KEEP
Sources for this topic — 6 sources
- Market practice
Foundation Level testing syllabus, 5.5 Defect Management (US member board of the International Software Testing Qualifications Board) ↗ — American Software Testing Qualifications Board (ASTQB) · Foundation Level 5.5 Defect Management, as published by a member board: a defect is tracked from when it is found to when it is closed, and the report keeps its status (search excerpt, page not opened)
Seen as a search excerpt; the page was not opened. The authoring container could not resolve this publisher's host name when a fetch was tried on 12 October 2026 for related hosts, so this is a reachability gap and not a statement about the publisher. It relays the same syllabus as the registered syllabus entry and adds no independent rule.
- Market practice
ISTQB Certified Tester Foundation Level Syllabus v4.0.1 ↗ — International Software Testing Qualifications Board · Foundation Level syllabus v4.0.1, defect management: defects are recorded, tracked and resolved through a workflow (confirmed against the syllabus, read in full text from a mirror copy of the publisher PDF, v4.0.1, 15 September 2024) | Publisher PDF v4.0.1,15 September2024, relevant cited section opened6 November2026; synthetic Daily List applications are editorial examples.
v4.0.1 is dated 15 September 2024 and is a list of corrections to v4.0 (21 April 2023) that reworded six learning objectives — not a cosmetic reissue. 78 pages.
Two traps this entry exists to stop. v4.0.2 is the German edition (1 March 2025, 94 pages), so sorting by version number reaches the wrong document. And the widely-repeated per-chapter question allocation "8 / 5 / 4 / 11 / 9 / 3" is wrong: it is 8 / 6 / 4 / 11 / 9 / 2, derived from three official sample-exam answer keys and confirmed against the Exam Structure Tables.
The single most consequential detail for a question bank: white-box coverage — statement and branch — is K2 "Explain", not K3 "Apply" (FL-4.3.1, FL-4.3.2, FL-4.3.3), and MC/DC, path and condition coverage are declared out of scope in §4.3. A question asking a candidate to compute branch coverage is testing something this syllabus does not.
Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.
Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.
Read from two independent PDF-to-markdown conversions mirrored on raw.githubusercontent.com. They are treated as faithful because they were produced by unrelated parties with different tooling, agree on the full 64-item objective set including wording, and reproduce the same internal inconsistency present in the source PDF. Chapter 1 reads "testware that supports" where Appendix B reads "that support". A conversion artefact does not replicate across two toolchains.
The licence permits attributed non-commercial extracts and use as the basis for articles. Whether a site that sells a pass may rely on that is an owner's decision, not this entry's.
7 November 2026 review: actual publisher PDF 4.0.1, 15 September 2024, 78 pages, front matter/copyright and relevant numbered operative sections 0.5–0.10 and chapters 1–6 compared with CTFLpractice lessons. Earlier mirror/search descriptions are historical access records. TheK2 white-box objectives require explanation; the source does not justify a categorical ban on small numeric illustrations that support explanation. Later Exam Rules 1.2§4.1.4 usesK2 for keyword definitions, while syllabus§0.5 usesK1; keep dated scopes distinct. No copied questions or figure assets.
- Market practice
Glossary of testing terms from the International Software Testing Qualifications Board (equivalence partition, equivalence partitioning, boundary value) ↗ — International Software Testing Qualifications Board (ISTQB) · ISTQB glossary: defect management is the process of recognising, recording, classifying, investigating, resolving and disposing of defects (search excerpt, page not opened)
Seen as a search excerpt; the page was not opened. The authoring container could not resolve this publisher's host name when a fetch was tried on 12 October 2026 for related hosts, so this is a reachability gap and not a statement about the publisher. The glossary has an older and a newer version of the entry for equivalence partitioning; the newer one defines the partition rather than the technique.
- Market practice
ISTQB Certified Tester Advanced Level Test Management Syllabus v3.0 (PDF) ↗ — International Software Testing Qualifications Board (ISTQB) · Section 2.3.1 (printed page 55): static testing in every phase; cost of quality lowest with perfect phase containment; anomalies, failures and false negatives; failed tests in test-driven development are not necessarily defects; version 3.0 of 2024-05-03, mirror copy of the publisher PDF, version checked against front matter, opened
Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CTAL-TM v3.0, 3 May 2024), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.
V52 opened the actual publisher PDF7 November 2026: version 3.0,3 May 2024 front matter,§§0.5–0.11, all substantivechapters 1–3/48 learning objectives and selectedreferences throughprintedp 71. Not every appendix or cited book. Earlier mirror access above is historical. Copyright does not establish unrestricted commercial figure copying.
- Market practice
ISTQB Certified Tester Advanced Level Test Management Syllabus v3.0 (PDF) ↗ — International Software Testing Qualifications Board (ISTQB) · Section 2.3.1 (printed page 55): simple defect workflow: OPEN, IN PROGRESS, REJECTED, RESOLVED, CLOSED; extended states such as RE-OPENED, ACCEPTED, CLARIFICATION, DEFERRED; agile workflows are often simpler; version 3.0 of 2024-05-03, mirror copy of the publisher PDF, version checked against front matter, opened
Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CTAL-TM v3.0, 3 May 2024), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.
V52 opened the actual publisher PDF7 November 2026: version 3.0,3 May 2024 front matter,§§0.5–0.11, all substantivechapters 1–3/48 learning objectives and selectedreferences throughprintedp 71. Not every appendix or cited book. Earlier mirror access above is historical. Copyright does not establish unrestricted commercial figure copying.
- Market practice
ISTQB Certified Tester Advanced Level Test Management Syllabus v3.0 (PDF) ↗ — International Software Testing Qualifications Board (ISTQB) · Section 2.3.1 (printed page 55): good practices for designing a defect workflow: organisation-wide, separate state or reason for duplicates and false positives, one terminal state with a reason, same names as other entities, different roles in consecutive states, more than one outgoing transition, limited attributes; version 3.0 of 2024-05-03, mirror copy of the publisher PDF, version checked against front matter, opened
Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CTAL-TM v3.0, 3 May 2024), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.
V52 opened the actual publisher PDF7 November 2026: version 3.0,3 May 2024 front matter,§§0.5–0.11, all substantivechapters 1–3/48 learning objectives and selectedreferences throughprintedp 71. Not every appendix or cited book. Earlier mirror access above is historical. Copyright does not establish unrestricted commercial figure copying.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.