DOMAIN 03 / 74 TOPICS

Manual testing in practice

Writing, running and reporting tests by hand, exploring with heuristics, reporting bugs people act on and wrapping up a round of testing.

YOUR PROGRESS IN THIS DOMAIN

0 of 74 topics demonstrated.

The whole domain takes about 16 hours 40 minutes.

Try this one without a pass

READ THE FIRST EXPLANATION →

Baseline testing and benchmark testing — the first explanation of every topic is open. Deeper levels stay Pro.

DOMAIN CERTIFICATE / CHECKABLE CREDENTIAL

Earn the Manual testing in practice certificate

Pass the timed exam to earn a public, checkable credential in the name on your account.

Draw
20 random questions
Time
30 minutes
Pass
75%

Practice checkpoints explain every answer. This separate exam is the assessment that issues the certificate.

Manual testing in practice — specimen certificate

Payments Signal

Specimen — not issuedCertificate of achievement

This certifies that

Your name here

has successfully passed the timed, server-marked exam for

Manual testing in practice

Assessed domains

Manual testing in practice

Specimen — nothing to verify

Assessment result

Not sat

Issued

Not issued

Syllabus as at

Not sat

Credential ID

None issued

Specimen — nothing to verify

paymentssignal.com/certificates

A blank specimen, shown so you can see the document before you sit for it. Nobody holds this, no exam was sat for it, and it is not an issued credential. A real one is issued by Payments Signal after an open-book timed exam. It is not accredited by any bank, payment scheme, standards body or awarding organisation.

  1. 4512 MIN
    A tester's day: from ticket to sign-offA tester's day follows one path: read the ticket, plan, test, log, report, and sign off. Learn the path once and every ticket feels familiar.AFTER: The test process, step by step
  2. 4612 MIN
    Test scenarios, cases and scriptsOne idea can be written as a headline, as a short case, or as a full script. Pick the level of detail for the person who will run it.AFTER: Writing test conditions and test cases
  3. 4712 MIN
    The parts of a good test caseA good test case names what must be true before, what to do, what to expect, and what is true after. Leave one out and a stranger cannot run it.AFTER: Test scenarios, cases and scripts
  4. 4812 MIN
    Writing clear test stepsA clear step asks for one action, names the thing to act on and gives the exact value. Then two people run it the same way.AFTER: The parts of a good test case
  5. 4912 MIN
    Expected results you can checkAn expected result is useful only if it can be wrong. Write what a tester can see, read or measure, so a pass or a fail is clear.AFTER: Writing clear test steps
  6. 5012 MIN
    Templates, suites and keeping tests in orderA template makes every case look the same. A suite groups cases for one purpose. An identifier gives each case a name that never changes.AFTER: The parts of a good test case
  7. 5112 MIN
    Preparing test dataTests need data in place before they run. Build a named set, put it back to a known start when it changes, and never use real people's details.AFTER: Templates, suites and keeping tests in order
  8. 5212 MIN
    Test environments and configurationsTest where it is safe, on the right version and the right settings. Write down the environment, configuration and build, or a result cannot be repeated.AFTER: The test process, step by step
  9. 5312 MIN
    Running tests and logging resultsRun each case as written, record what happened, and mark it passed, failed, blocked or skipped. A clear log lets anyone trust the result later.AFTER: The parts of a good test case
  10. 5412 MIN
    Test evidenceEvidence is the proof of what was tested and what happened. Keep enough that someone can check it later, and no more than the risk calls for.AFTER: Running tests and logging results
  11. 5512 MIN
    Smoke and sanity testingA smoke test asks if a new build is fit to test at all. A sanity test asks if one fix or change works. Both are short, and neither replaces full testing.AFTER: Test types: functional, non-functional, black-box and white-box
  12. 5612 MIN
    Retesting a fixed bugWhen a developer says a bug is fixed, run the same steps again on the fixed build. If it passes, record the proof. If it fails, reopen it with new facts.AFTER: Writing a defect report: severity and priority
  13. 5712 MIN
    Exploratory chartersA charter is a short mission for a stretch of exploring. It names where to look, what to use and what to find out, without scripting every step.AFTER: Exploratory testing and error guessing
  14. 5812 MIN
    Taking notes while exploringWithout a script, your notes are the only record of what you tried. Write a line every few minutes: what you did, what you saw and what you still need to ask.AFTER: Exploratory charters
  15. 5912 MIN
    Reproducing a bug every timeA bug that follows from the same steps every time is easy to fix. When it only shows sometimes, change one thing at a time until you find what it needs.AFTER: Writing a defect report: severity and priority
  16. 6012 MIN
    The life of a defectA defect moves through stages, such as new, fixed, retested and closed. At each stage one person owns the next step, so a bug does not sit forgotten.AFTER: Writing a defect report: severity and priority
  17. 6112 MIN
    Asking good questions as a testerA tester finds gaps by asking. Start wide with an open question, then narrow with a closed one, and ask the person who can really answer.AFTER: What testing is for
  18. 6212 MIN
    Regression testing in practiceAfter a change, check that things that used to work still do. Find the parts the change might touch, then rerun the checks that cover them.AFTER: Retesting a fixed bug
  19. 6312 MIN
    Choosing what to retestYou rarely have time to rerun everything. Choose by risk and by the change, keep the paths nearly every user takes, and say out loud what you left out.AFTER: Regression testing in practice
  20. 6412 MIN
    Session-based test managementSession-based test management gives exploring a rhythm: a charter, an unbroken block of time, a record of what happened and a short talk afterwards.AFTER: Exploratory charters
  21. 6512 MIN
    Seeing a product from many sides: SFDPOTSFDPOT is a memory aid for looking at a product from six sides. Use it to grow test ideas and to see which sides you have not looked at yet.AFTER: Exploratory charters
  22. 6612 MIN
    Spotting problems with HICCUPPSHICCUPPS is a memory aid from the testing community for ways to tell that something is wrong. Each letter is a clash to look for: with the past, the claims or the purpose.AFTER: How do you know the right answer? Test oracles
  23. 6712 MIN
    Testing toursA tour covers a product by one idea, like a city tour for food or for history. Pick a theme, follow it for one session and see what the product shows you.AFTER: Seeing a product from many sides: SFDPOT
  24. 6812 MIN
    Where bugs like to hideBugs are not spread evenly. They gather in a few busy, changed or joined-up parts. Learn where to look first, and keep a little time for everywhere else.AFTER: Mistakes, defects and failures
  25. 6912 MIN
    Testing when there is no clear specWhen the spec is thin, testing still goes on. Use informal oracles, write down your assumptions and ask clarifying questions so the answer comes from a person, not a guess.AFTER: How do you know the right answer? Test oracles
  26. 7012 MIN
    Narrowing down where a bug comes fromOnce you can repeat a bug, cut it down. Change one thing at a time until only the steps and data that matter are left. The short list points at the cause.AFTER: Reproducing a bug every time
  27. 7112 MIN
    A defect report people act onA good report has a clear title, the build and device used, exact steps, expected and actual results and one helpful file. Then the reader can act without ringing back.AFTER: Writing a defect report: severity and priority
  28. 7212 MIN
    Defect triageTriage is a short regular meeting that sorts new defects. For each one the team decides: fix now, fix later or do not fix, and who owns it. The list stays short and honest.AFTER: The life of a defect
  29. 7312 MIN
    When a bug is rejected or cannot be reproducedA report can come back as cannot reproduce, works as designed or duplicate. Do not argue. Check your facts, add what is missing, and bring evidence calmly.AFTER: A defect report people act on
  30. 7412 MIN
    Test summary and closure reportsAt the end of a round of testing, write one short page: what was tested, what failed, what is still open and what to change. Then wrap up and keep the useful records.AFTER: Running tests and logging results
  31. 10510 MIN
    QA, QC and testing: three words, three jobsQA prevents problems in how a team works. Quality control checks finished work. Testing is the hands-on checking it leans on. Learn the three jobs and why fresh eyes help.AFTER: Test types: functional, non-functional, black-box and white-box
  32. 10612 MIN
    How would you test this? A method for any objectAsked how you would test a lift or a pen? Use four steps: ask, list angles, test the worst harm first, then say how you would report. The same steps work on a login page.AFTER: Seeing a product from many sides: SFDPOT · Testing when there is no clear spec
  33. 10710 MIN
    Ad hoc, monkey and exploratory testing comparedThree kinds of testing have no written steps, but they differ. Ad hoc is a wander, monkey is random pressing, and exploratory has a goal and notes. Learn when to use each.AFTER: Exploratory testing and error guessing
  34. 10810 MIN
    Baseline testing and benchmark testingA baseline compares your software with its own past. A benchmark compares it with an outside standard or a rival. Learn what each tells you and how to keep the comparison fair.START HERE — NO PREREQUISITES
  35. 10912 MIN
    Concurrency and race-condition testing ideasWhen many things happen at once, results can depend on who is first. Learn what concurrency, a race condition and a deadlock are, and how to test for them with repeats and checks.START HERE — NO PREREQUISITES
  36. 11012 MIN
    The traceability matrix from the tester's sideA traceability matrix links each requirement to the tests that check it. Learn to build one, read its gaps both ways, use it when a rule changes, and see where it misleads.AFTER: From test basis to coverage: how much testing is enough
  37. 11112 MIN
    Building a test report people readA good test report answers one question first: can we release, and why? Learn what leakage, density and pass rate mean, how each can mislead, and how to lay out a one-page report.AFTER: Test summary and closure reports
  38. 11212 MIN
    Test estimation: breakdown, three-point, history and experienceNina asks how long testing will take. Learn four ways to answer: split the work, use best and worst cases, check the past, and ask the people doing it. Always give a range.START HERE — NO PREREQUISITES
  39. 11312 MIN
    Maintenance testing and impact analysisAfter live software changes, you test the change and what it touched. Learn the three triggers, how to work out the impact, and how to pick a sensible set of tests to run again.AFTER: Regression testing in practice
  40. 11412 MIN
    Verification and validation, static and dynamic, alpha and betaThree word pairs come up in every interview: verification and validation, static and dynamic, alpha and beta. Learn each from zero, and see where the neat rules stop working.AFTER: Test types: functional, non-functional, black-box and white-box
  41. 11512 MIN
    Testing and debugging: two different jobsTesting shows that something is wrong. Debugging finds out why and fixes it. Two jobs, often two people, and a retest in between.AFTER: Mistakes, defects and failures
  42. 11614 MIN
    The seven testing principlesSeven short warnings that apply to every test job. Learn to match each warning to a real moment, and exam and interview questions get easy.AFTER: What testing is for · Mistakes, defects and failures
  43. 11712 MIN
    Testware: the things testing leaves behindTesting leaves things behind: plans, cases, data, logs and reports. Each belongs to one stage, and knowing which is which makes any test job easier to follow.AFTER: The test process, step by step · Templates, suites and keeping tests in order
  44. 11813 MIN
    Testing roles and independence of testingWho owns what in testing, and why a fresh pair of eyes finds what the author cannot. Learn the two roles, the whole-team idea and the pros and cons of independence.AFTER: A tester's day: from ticket to sign-off · Asking good questions as a tester
  45. 11913 MIN
    Reviews in practice: types, roles and stepsA review has set steps, set roles and a type that fits its goal. Learn who does what, in which order, so you can join a review on day one.AFTER: Reviews and static testing
  46. 12012 MIN
    Peer review of test casesA test case that makes sense to its writer may puzzle everyone else. A second tester with a short checklist finds the gaps before they cost a test run.AFTER: The parts of a good test case · Expected results you can check
  47. 12113 MIN
    Choosing test data for good and bad inputTechniques tell you which groups of values to test. This lesson shows how to pick the real values to type: one sensible, one blank, one too long, one odd.AFTER: Preparing test data · Boundary value analysis
  48. 12213 MIN
    Keeping a regression suite healthyA suite that only grows becomes slow, noisy and untrusted. Retire old cases, fix stale ones and split a big suite, so the run stays quick and the red marks stay real.AFTER: Regression testing in practice · Templates, suites and keeping tests in order
  49. 12313 MIN
    Deciding which tests to run firstTime always runs short. Order the tests by risk, by cover and by what depends on what, so that if the clock stops you, the most important checks are already done.AFTER: Choosing what to retest · Risk-based test planning
  50. 12414 MIN
    Other memory aids for test ideasSFDPOT and HICCUPPS are two lists among many. Meet CRUD, RCRCRC, a mobile list and a quality list, and learn to pick the torch that lights the corner you need.AFTER: Seeing a product from many sides: SFDPOT · Spotting problems with HICCUPPS
  51. 12514 MIN
    The Heuristic Test Strategy ModelOne page of prompts that links three views: the project you work in, the product you test and the kinds of quality that matter. Read them together to plan a test strategy.AFTER: Seeing a product from many sides: SFDPOT · Risk-based test planning
  52. 12614 MIN
    Testing together: pair, ensemble and crowd testingTesting does not have to be solo. Two people at one keyboard, a whole team at one screen, or a crowd of outsiders on their own phones: each finds different things.AFTER: Session-based test management · Exploratory charters
  53. 12714 MIN
    Running a bug bashA bug bash is a short event where many people try to break one release. Plan it, run it by the clock, then sort what they found.AFTER: Exploratory charters · Defect triage
  54. 12814 MIN
    Forms of acceptance testing: user, operational, contract, alpha and betaAcceptance testing is the last check before a product is handed over. It has several forms, and each asks a different person a different question.AFTER: Five test levels: parts, systems and acceptance · Verification and validation, static and dynamic, alpha and beta
  55. 12914 MIN
    User stories and acceptance criteriaA user story says who wants what and why. Its acceptance criteria say how we will know it works. A tester checks that each one can pass or fail.AFTER: Acceptance tests from examples
  56. 13018 MIN
    Worked answers for "how would you test this?"Ten answers to how would you test a lift, a pen, a cash machine and more, each built from the same steps and the academy's test techniques.AFTER: How would you test this? A method for any object · Seeing a product from many sides: SFDPOT
  57. 13116 MIN
    Testing an application with few or no testsAn old product with few tests is risky to change. Map the risk, record what it does today, add checks around the next change and grow from there.AFTER: Testing when there is no clear spec · Risk-based test planning
  58. 13214 MIN
    Three amigos: talking before buildingBefore a story is built, a business person, a builder and a tester talk it through. They leave with agreed examples and open questions.AFTER: Acceptance tests from examples
  59. 13315 MIN
    Bug advocacyA bug does not argue for itself. Bring facts, name who it hurts, show what waiting costs, offer options and let the owner decide.AFTER: Defect triage
  60. 13416 MIN
    Basic root cause analysis for testersAfter a bug escapes, ask why until you find the cause you can fix. Find where it could have been caught, and fix both without blaming a person.AFTER: The life of a defect
  61. 410320 MIN
    Managing test cases in Jira, spreadsheets and test-management toolsKeep each test case once, keep each run's result apart, and link cases to stories. Then see how a spreadsheet, Jira and a test-management tool each hold that structure.AFTER: Templates, suites and keeping tests in order · The traceability matrix from the tester's side
  62. 410420 MIN
    A bug reached production: the first hour, and learning from a missA real user hit a bug that testing missed. Learn what to do in the first hour, how to handle a thin customer report, and how to review the miss without blame.AFTER: Basic root cause analysis for testers · Reproducing a bug every time
  63. 420222 MIN
    Test accounts: creating, sharing, resetting and cleaning them up safelyPlan test accounts like keys to a building. Give each role an account and an owner, keep secrets safe, and plan a reset and an end date.AFTER: Designing test data · Test environments and configurations
  64. 740620 MIN
    The test analyst at work: life cycles, the four activities and product riskLearn what a test analyst does in the four test activities. See how the life cycle changes the work, and how the analyst helps with product risk.AFTER: The test process, step by step · How the project and context shape testing: sequential, iterative and incremental models · Risk-based test planning · From test basis to coverage: how much testing is enough
  65. 740716 MIN
    Test cases: high-level or low-level, and nine quality criteriaLearn the difference between a high-level and a low-level test case, when each fits, and the nine criteria that make a test case good.AFTER: Writing test conditions and test cases · The parts of a good test case · Peer review of test cases
  66. 740820 MIN
    What a test needs: environment items, an oracle and the right dataLearn what to write down about a test environment, how to cope with no clear right answer, and what to settle about test data.AFTER: Test environments and configurations · How do you know the right answer? Test oracles · Preparing test data · Designing test data
  67. 740918 MIN
    Choosing regression tests: six techniques comparedLearn six ways to pick which tests to rerun after a change. See which suit automated and manual runs, and how to improve the choice.AFTER: Choosing what to retest · Maintenance testing and impact analysis · Regression testing in practice · The traceability matrix from the tester's side
  68. 741018 MIN
    Review techniques for the test basis, and why review preparation mattersLearn five ways a reviewer can read a test basis, when each fits, and why a reviewer needs time to prepare.AFTER: Reviews in practice: types, roles and steps · Reviews and static testing · Finding testable gaps in requirements · Peer review of test cases
  69. 741118 MIN
    Charters, checklists and crowds: the Advanced syllabus detailsLearn what to put in a test charter, how read-do and do-confirm checklists differ, and the benefits and limits of crowd testing.AFTER: Exploratory charters · Session-based test management · Checklist-based testing · Testing together: pair, ensemble and crowd testing
  70. 742016 MIN
    Jira for testers: issues, workflows, boards and JQL (Jira Query Language)Many teams keep their bugs and tasks in Jira. Learn what an issue holds, how it moves, and how to find yours with a search.AFTER: Writing a defect report: severity and priority · The life of a defect
  71. 743016 MIN
    Jira workflows, boards and dashboards for testersA bug moves through steps, and a board shows them as columns. Learn statuses, transitions, board columns and a simple dashboard from a tester's side.AFTER: Jira for testers: issues, workflows, boards and JQL (Jira Query Language)
  72. 744014 MIN
    The test environment is down: what a blocked tester doesReport it with facts, do the work that needs no app, log the lost time, and restart by risk.AFTER: Test environments and configurations
  73. 745014 MIN
    It works on my machine: finding what is differentTreat the sentence as a clue, write down both setups, compare them side by side and change one thing at a time.AFTER: Reproducing a bug every time
  74. 746014 MIN
    Handover notes before you go on leave: what the cover person needsWrite early, state the release, park decisions with reasons, say where to explore and name who to call.AFTER: Test environments and configurations