Testing in the life cycle (plan, build, test, release)

Testing can begin with requirements and design, continue through builds and return after release. Early checks can avoid later rework; impact and risk guide checks after change.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: building a house. Before anyone lays a brick, the builder checks the plan. Then the foundations are checked, then the walls, then the finished house. A mistake caught on the plan costs a pencil. The same mistake caught in the walls costs a wall. Good builders check at every stage, and not only at the end.

Daily List, a to-do list app, is built in steps too. Nina, the product owner, plans a reminders feature. Leo, the developer, builds it. Tom, the tester, checks it. Then the feature is released, which means it goes to real users such as Lily. Tom does not wait for the last step. He reads the plan first, tries an early version next, and checks again after release.

The house picture has a limit. The picture focuses on construction, not all the inspections that a real house may need later. Software changes also need fresh testing; the earlier checks covered earlier work. How early can Tom start? What does he check at each step? And what happens when the app is already in use and Leo changes it?

(SYNTHETIC / TRAINING ONLY: Daily List and every person named in this lesson are invented.)

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the software.

THE REAL JOB Testing runs alongside every step from plan to release and returns after each change.

  1. Plan: read the story card for gaps
  2. Build: try early versions as they appear
  3. Test: check the whole feature
  4. Release: it goes to real users
  5. Change: check the change and its neighbours
Testing alongside every step, and again after release

HOW THE PICTURE MAPS

How each part of the picture matches the software
In the pictureIn the software
The builder checking the plan on paperTom reading a story card for gaps before any code exists
Checking the foundations before building on themTrying an early version of the feature while it is built
Checking the walls and the finished houseTesting the whole feature before it goes to users
A mistake on paper costs a pencilA gap found on a card costs a short talk
A mistake in the walls costs a wallA gap found in finished code costs rework
Repairs to a house where people already liveMaintenance testing after a change to a live app

WHERE THIS PICTURE STOPS

  • The construction picture leaves out later inspections; software needs fresh evidence after changes to code or environment.
  • A house is built in a strict order. Many software teams work in short rounds, so planning, building and testing overlap in the same week.
  • A builder cannot check the walls from the plan. Early checks of a card cannot find slips that exist only in the finished code.

HOOK

Check early, check often, check again after every change.

REMEMBER IT THIS WAY

A rule of thumb: if you see this, think that.

A gap is usually cheapest on the story card, so read the card before any code exists. A gap in finished code costs rework.

What each part of the trick stands for
In the trickWhat it stands for
Read the cardTom reads the plan first
Cheapest on the cardA mistake caught on the plan costs a pencil
Costs reworkThe same mistake caught in the walls costs a wall

Software is changed and released again and again, so testing comes back after every change, not only at the start.

TELL A FRIEND

A builder checks the plan before building on it, which can avoid later rework. also starts early and returns after changes, with scope chosen for the situation.

OFTEN MIXED UP WITH The test process, step by step. This lesson says where testing fits among the steps of building software. The test process lesson lists the jobs inside testing itself.

Sources & standards — 1 source
  1. Market practice

    ISTQB Certified Tester Foundation Level Syllabus v4.0.1 ↗ — International Software Testing Qualifications Board · CTFL 4.0.1 (15 September 2024), §§2.1.1–2.1.5 early testing/lifecycle context and §2.3 maintenance triggers/impact analysis. Actual selected official PDF text read 7 November 2026; local Daily List examples are synthetic.

    The examinable statement of what a foundation-level tester is expected to know: six chapters, 64 learning objectives, each tagged K1 Remember, K2 Understand or K3 Apply, plus the test-design techniques the qualification names and groups as black-box, white-box and experience-based.

    Used here for the test-craft questions a Payment Quality Assurance Analyst and a Production Support Analyst are asked. It is cited for what the syllabus says a tester must be able to do, never as a rule about how payments work. · Checked 2026-11-07

    v4.0.1 is dated 15 September 2024 and is a list of corrections to v4.0 (21 April 2023) that reworded six learning objectives — not a cosmetic reissue. 78 pages.

    Two traps this entry exists to stop. v4.0.2 is the German edition (1 March 2025, 94 pages), so sorting by version number reaches the wrong document. And the widely-repeated per-chapter question allocation "8 / 5 / 4 / 11 / 9 / 3" is wrong: it is 8 / 6 / 4 / 11 / 9 / 2, derived from three official sample-exam answer keys and confirmed against the Exam Structure Tables.

    The single most consequential detail for a question bank: white-box coverage — statement and branch — is K2 "Explain", not K3 "Apply" (FL-4.3.1, FL-4.3.2, FL-4.3.3), and MC/DC, path and condition coverage are declared out of scope in §4.3. A question asking a candidate to compute branch coverage is testing something this syllabus does not.

    Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.

    Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.

    Read from two independent PDF-to-markdown conversions mirrored on raw.githubusercontent.com. They are treated as faithful because they were produced by unrelated parties with different tooling, agree on the full 64-item objective set including wording, and reproduce the same internal inconsistency present in the source PDF. Chapter 1 reads "testware that supports" where Appendix B reads "that support". A conversion artefact does not replicate across two toolchains.

    The licence permits attributed non-commercial extracts and use as the basis for articles. Whether a site that sells a pass may rely on that is an owner's decision, not this entry's.

    7 November 2026 review: actual publisher PDF 4.0.1, 15 September 2024, 78 pages, front matter/copyright and relevant numbered operative sections 0.5–0.10 and chapters 1–6 compared with CTFLpractice lessons. Earlier mirror/search descriptions are historical access records. TheK2 white-box objectives require explanation; the source does not justify a categorical ban on small numeric illustrations that support explanation. Later Exam Rules 1.2§4.1.4 usesK2 for keyword definitions, while syllabus§0.5 usesK1; keep dated scopes distinct. No copied questions or figure assets.

PRACTISE AND KEEP

Sources for this topic — 8 sources
  1. Market practice

    ISTQB Certified Tester Foundation Level Syllabus v4.0.1 ↗ — International Software Testing Qualifications Board · Foundation Level syllabus v4.0.1, chapter 2 (testing throughout the software development life cycle), section 2.1: life cycle models, good testing practices and the shift-left approach

    The examinable statement of what a foundation-level tester is expected to know: six chapters, 64 learning objectives, each tagged K1 Remember, K2 Understand or K3 Apply, plus the test-design techniques the qualification names and groups as black-box, white-box and experience-based.

    Used here for the test-craft questions a Payment Quality Assurance Analyst and a Production Support Analyst are asked. It is cited for what the syllabus says a tester must be able to do, never as a rule about how payments work. · Checked 2026-11-07

    v4.0.1 is dated 15 September 2024 and is a list of corrections to v4.0 (21 April 2023) that reworded six learning objectives — not a cosmetic reissue. 78 pages.

    Two traps this entry exists to stop. v4.0.2 is the German edition (1 March 2025, 94 pages), so sorting by version number reaches the wrong document. And the widely-repeated per-chapter question allocation "8 / 5 / 4 / 11 / 9 / 3" is wrong: it is 8 / 6 / 4 / 11 / 9 / 2, derived from three official sample-exam answer keys and confirmed against the Exam Structure Tables.

    The single most consequential detail for a question bank: white-box coverage — statement and branch — is K2 "Explain", not K3 "Apply" (FL-4.3.1, FL-4.3.2, FL-4.3.3), and MC/DC, path and condition coverage are declared out of scope in §4.3. A question asking a candidate to compute branch coverage is testing something this syllabus does not.

    Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.

    Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.

    Read from two independent PDF-to-markdown conversions mirrored on raw.githubusercontent.com. They are treated as faithful because they were produced by unrelated parties with different tooling, agree on the full 64-item objective set including wording, and reproduce the same internal inconsistency present in the source PDF. Chapter 1 reads "testware that supports" where Appendix B reads "that support". A conversion artefact does not replicate across two toolchains.

    The licence permits attributed non-commercial extracts and use as the basis for articles. Whether a site that sells a pass may rely on that is an owner's decision, not this entry's.

    7 November 2026 review: actual publisher PDF 4.0.1, 15 September 2024, 78 pages, front matter/copyright and relevant numbered operative sections 0.5–0.10 and chapters 1–6 compared with CTFLpractice lessons. Earlier mirror/search descriptions are historical access records. TheK2 white-box objectives require explanation; the source does not justify a categorical ban on small numeric illustrations that support explanation. Later Exam Rules 1.2§4.1.4 usesK2 for keyword definitions, while syllabus§0.5 usesK1; keep dated scopes distinct. No copied questions or figure assets.

  2. Market practice

    ISTQB Certified Tester Foundation Level Syllabus v4.0.1 ↗ — International Software Testing Qualifications Board · Foundation Level syllabus v4.0.1, chapter 2, section 2.3: maintenance testing and its triggers

    The examinable statement of what a foundation-level tester is expected to know: six chapters, 64 learning objectives, each tagged K1 Remember, K2 Understand or K3 Apply, plus the test-design techniques the qualification names and groups as black-box, white-box and experience-based.

    Used here for the test-craft questions a Payment Quality Assurance Analyst and a Production Support Analyst are asked. It is cited for what the syllabus says a tester must be able to do, never as a rule about how payments work. · Checked 2026-11-07

    v4.0.1 is dated 15 September 2024 and is a list of corrections to v4.0 (21 April 2023) that reworded six learning objectives — not a cosmetic reissue. 78 pages.

    Two traps this entry exists to stop. v4.0.2 is the German edition (1 March 2025, 94 pages), so sorting by version number reaches the wrong document. And the widely-repeated per-chapter question allocation "8 / 5 / 4 / 11 / 9 / 3" is wrong: it is 8 / 6 / 4 / 11 / 9 / 2, derived from three official sample-exam answer keys and confirmed against the Exam Structure Tables.

    The single most consequential detail for a question bank: white-box coverage — statement and branch — is K2 "Explain", not K3 "Apply" (FL-4.3.1, FL-4.3.2, FL-4.3.3), and MC/DC, path and condition coverage are declared out of scope in §4.3. A question asking a candidate to compute branch coverage is testing something this syllabus does not.

    Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.

    Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.

    Read from two independent PDF-to-markdown conversions mirrored on raw.githubusercontent.com. They are treated as faithful because they were produced by unrelated parties with different tooling, agree on the full 64-item objective set including wording, and reproduce the same internal inconsistency present in the source PDF. Chapter 1 reads "testware that supports" where Appendix B reads "that support". A conversion artefact does not replicate across two toolchains.

    The licence permits attributed non-commercial extracts and use as the basis for articles. Whether a site that sells a pass may rely on that is an owner's decision, not this entry's.

    7 November 2026 review: actual publisher PDF 4.0.1, 15 September 2024, 78 pages, front matter/copyright and relevant numbered operative sections 0.5–0.10 and chapters 1–6 compared with CTFLpractice lessons. Earlier mirror/search descriptions are historical access records. TheK2 white-box objectives require explanation; the source does not justify a categorical ban on small numeric illustrations that support explanation. Later Exam Rules 1.2§4.1.4 usesK2 for keyword definitions, while syllabus§0.5 usesK1; keep dated scopes distinct. No copied questions or figure assets.

  3. Market practice

    Foundation Level testing syllabus, 2.2 Test Levels and Test Types (US member board of the International Software Testing Qualifications Board) ↗ — American Software Testing Qualifications Board (ASTQB) · Section 2.2, test levels and test types: test levels are groups of test activities that are organised and managed together, and they may overlap in time (search excerpt, page not opened)

    A second publisher for the syllabus section on test levels and test types. Cited for the five levels (component, component integration, system, system integration and acceptance), for the four test types (functional, non-functional, black-box and white-box), and for the forms acceptance testing takes. · Checked 2026-11-07

    Seen as a search excerpt; the page was not opened. The authoring container could not resolve this publisher's host name when a fetch was tried on 12 October 2026 for related hosts, so this is a reachability gap and not a statement about the publisher. It relays the registered syllabus and adds no independent rule.

    7 November 2026 current review: actual 2.2 overview and 2.2.1–2.2.3 read; levels can overlap, fivelevels/fourtypes and confirmation/regression distinction. Prior excerpt-only access is historical; no new licence grant is implied.

  4. Market practice

    The Scrum Guide — The Definitive Guide to Scrum: The Rules of the Game (November 2020) ↗ — Ken Schwaber and Jeff Sutherland · The Scrum Guide (November 2020): the Developers, the Increment and the Definition of Done; the Guide names no separate testing phase

    The framework definition itself: three accountabilities, five events, three artifacts with their commitments, and the five Scrum values. Thirteen pages, about 3,956 words, CC BY-SA 4.0.

    Used here for the agile-delivery questions a Payments Business Analyst, a Payment Quality Assurance Analyst and a Payments Product Manager are asked — and, as often, for what the Guide does not say. Additional actual read scope7November2026: Official Scrum Guide November2020, actual ProductBacklog/refinement, SprintPlanning and SprintReview sections read7November2026: emergent ordered work, ongoing refinement, Done-within-Sprint readiness, possible planning refinement, Developer sizing/selection and feedback. No mandatory1–2Sprint buffer, user-story format or universal all-questions-answered rule; no whole-guide read claimed in this pass. · Checked 2026-08-18

    Still current in August 2026. There is no 2025 or 2026 revision of the Guide.

    The confusable document is a rename. "Scrum Guide Expansion Pack" (v2025.6) became "Scrum Guide Expanded" (v2026.1, 18 January 2026), published at scrumexpansion.org by Jocham, Coleman and Sutherland. Same URL path, different name, and Jeff Sutherland co-authors both it and the Guide — which is exactly the hook that makes wrong credit plausible. It is not a version of the Scrum Guide.

    Nine terms interview answers routinely attribute to Scrum appear zero times in the Guide: story points, velocity, Definition of Ready, sprint zero, user stories, acceptance criteria, grooming, T-shirt sizing, planning poker. So do "estimate" and "estimation".

    Two that are usually said to be absent and are present, which is why this paragraph exists: burn-down charts are named once and subordinated — "Various practices exist to forecast progress, like burn-downs, burn-ups, or cumulative flows. While proven useful, these do not replace the importance of empiricism" — and backlog refinement is defined as "an ongoing activity". What is absent is refinement as an event, and the absent word is "grooming".

    The Guide does require Product Backlog items to acquire a size, and puts sizing on the Developers, while naming no unit, scale or technique. It says "accountabilities", not "roles"; five events, not four; never "ceremony".

    Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.

    Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.

    Read in full from three independent mirrors that agree byte-for-byte on section structure, on the CC BY-SA 4.0 footer, on word count to within four words, and on all sixteen term-frequency counts above. Edition confirmed as 2020 specifically by zero occurrences of "Development Team" and thirteen of "Product Goal". Actual selected sections above read; prior metadata and wider source-use notes preserved. No full member book or adjacent legacy scheduling rule is implied.

  5. Market practice

    ISTQB Certified Tester Foundation Level Syllabus v4.0.1 ↗ — International Software Testing Qualifications Board · CTFL v4.0.1 (2024-09-15), §2.1.1–2.1.5 life cycles and early testing; §2.3 maintenance. Official publisher PDF opened 2026-11-05. Daily List examples are synthetic.

    The examinable statement of what a foundation-level tester is expected to know: six chapters, 64 learning objectives, each tagged K1 Remember, K2 Understand or K3 Apply, plus the test-design techniques the qualification names and groups as black-box, white-box and experience-based.

    Used here for the test-craft questions a Payment Quality Assurance Analyst and a Production Support Analyst are asked. It is cited for what the syllabus says a tester must be able to do, never as a rule about how payments work. · Checked 2026-11-07

    v4.0.1 is dated 15 September 2024 and is a list of corrections to v4.0 (21 April 2023) that reworded six learning objectives — not a cosmetic reissue. 78 pages.

    Two traps this entry exists to stop. v4.0.2 is the German edition (1 March 2025, 94 pages), so sorting by version number reaches the wrong document. And the widely-repeated per-chapter question allocation "8 / 5 / 4 / 11 / 9 / 3" is wrong: it is 8 / 6 / 4 / 11 / 9 / 2, derived from three official sample-exam answer keys and confirmed against the Exam Structure Tables.

    The single most consequential detail for a question bank: white-box coverage — statement and branch — is K2 "Explain", not K3 "Apply" (FL-4.3.1, FL-4.3.2, FL-4.3.3), and MC/DC, path and condition coverage are declared out of scope in §4.3. A question asking a candidate to compute branch coverage is testing something this syllabus does not.

    Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.

    Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.

    Read from two independent PDF-to-markdown conversions mirrored on raw.githubusercontent.com. They are treated as faithful because they were produced by unrelated parties with different tooling, agree on the full 64-item objective set including wording, and reproduce the same internal inconsistency present in the source PDF. Chapter 1 reads "testware that supports" where Appendix B reads "that support". A conversion artefact does not replicate across two toolchains.

    The licence permits attributed non-commercial extracts and use as the basis for articles. Whether a site that sells a pass may rely on that is an owner's decision, not this entry's.

    7 November 2026 review: actual publisher PDF 4.0.1, 15 September 2024, 78 pages, front matter/copyright and relevant numbered operative sections 0.5–0.10 and chapters 1–6 compared with CTFLpractice lessons. Earlier mirror/search descriptions are historical access records. TheK2 white-box objectives require explanation; the source does not justify a categorical ban on small numeric illustrations that support explanation. Later Exam Rules 1.2§4.1.4 usesK2 for keyword definitions, while syllabus§0.5 usesK1; keep dated scopes distinct. No copied questions or figure assets.

  6. Market practice

    The Scrum Guide — The Definitive Guide to Scrum: The Rules of the Game (November 2020) ↗ — Ken Schwaber and Jeff Sutherland · November 2020 Scrum Guide; The Sprint and Definition of Done. Publisher HTML opened 2026-11-05. Sprints last one month or less; organizational quality standards are a minimum.

    The framework definition itself: three accountabilities, five events, three artifacts with their commitments, and the five Scrum values. Thirteen pages, about 3,956 words, CC BY-SA 4.0.

    Used here for the agile-delivery questions a Payments Business Analyst, a Payment Quality Assurance Analyst and a Payments Product Manager are asked — and, as often, for what the Guide does not say. Additional actual read scope7November2026: Official Scrum Guide November2020, actual ProductBacklog/refinement, SprintPlanning and SprintReview sections read7November2026: emergent ordered work, ongoing refinement, Done-within-Sprint readiness, possible planning refinement, Developer sizing/selection and feedback. No mandatory1–2Sprint buffer, user-story format or universal all-questions-answered rule; no whole-guide read claimed in this pass. · Checked 2026-08-18

    Still current in August 2026. There is no 2025 or 2026 revision of the Guide.

    The confusable document is a rename. "Scrum Guide Expansion Pack" (v2025.6) became "Scrum Guide Expanded" (v2026.1, 18 January 2026), published at scrumexpansion.org by Jocham, Coleman and Sutherland. Same URL path, different name, and Jeff Sutherland co-authors both it and the Guide — which is exactly the hook that makes wrong credit plausible. It is not a version of the Scrum Guide.

    Nine terms interview answers routinely attribute to Scrum appear zero times in the Guide: story points, velocity, Definition of Ready, sprint zero, user stories, acceptance criteria, grooming, T-shirt sizing, planning poker. So do "estimate" and "estimation".

    Two that are usually said to be absent and are present, which is why this paragraph exists: burn-down charts are named once and subordinated — "Various practices exist to forecast progress, like burn-downs, burn-ups, or cumulative flows. While proven useful, these do not replace the importance of empiricism" — and backlog refinement is defined as "an ongoing activity". What is absent is refinement as an event, and the absent word is "grooming".

    The Guide does require Product Backlog items to acquire a size, and puts sizing on the Developers, while naming no unit, scale or technique. It says "accountabilities", not "roles"; five events, not four; never "ceremony".

    Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.

    Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.

    Read in full from three independent mirrors that agree byte-for-byte on section structure, on the CC BY-SA 4.0 footer, on word count to within four words, and on all sixteen term-frequency counts above. Edition confirmed as 2020 specifically by zero occurrences of "Development Team" and thirteen of "Product Goal". Actual selected sections above read; prior metadata and wider source-use notes preserved. No full member book or adjacent legacy scheduling rule is implied.

  7. Market practice

    ISTQB Certified Tester Foundation Level Syllabus v4.0.1 ↗ — International Software Testing Qualifications Board · CTFL 4.0.1 (15 September 2024), §§2.1.1–2.1.5 early testing/lifecycle context and §2.3 maintenance triggers/impact analysis. Actual selected official PDF text read 7 November 2026; local Daily List examples are synthetic.

    The examinable statement of what a foundation-level tester is expected to know: six chapters, 64 learning objectives, each tagged K1 Remember, K2 Understand or K3 Apply, plus the test-design techniques the qualification names and groups as black-box, white-box and experience-based.

    Used here for the test-craft questions a Payment Quality Assurance Analyst and a Production Support Analyst are asked. It is cited for what the syllabus says a tester must be able to do, never as a rule about how payments work. · Checked 2026-11-07

    v4.0.1 is dated 15 September 2024 and is a list of corrections to v4.0 (21 April 2023) that reworded six learning objectives — not a cosmetic reissue. 78 pages.

    Two traps this entry exists to stop. v4.0.2 is the German edition (1 March 2025, 94 pages), so sorting by version number reaches the wrong document. And the widely-repeated per-chapter question allocation "8 / 5 / 4 / 11 / 9 / 3" is wrong: it is 8 / 6 / 4 / 11 / 9 / 2, derived from three official sample-exam answer keys and confirmed against the Exam Structure Tables.

    The single most consequential detail for a question bank: white-box coverage — statement and branch — is K2 "Explain", not K3 "Apply" (FL-4.3.1, FL-4.3.2, FL-4.3.3), and MC/DC, path and condition coverage are declared out of scope in §4.3. A question asking a candidate to compute branch coverage is testing something this syllabus does not.

    Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.

    Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.

    Read from two independent PDF-to-markdown conversions mirrored on raw.githubusercontent.com. They are treated as faithful because they were produced by unrelated parties with different tooling, agree on the full 64-item objective set including wording, and reproduce the same internal inconsistency present in the source PDF. Chapter 1 reads "testware that supports" where Appendix B reads "that support". A conversion artefact does not replicate across two toolchains.

    The licence permits attributed non-commercial extracts and use as the basis for articles. Whether a site that sells a pass may rely on that is an owner's decision, not this entry's.

    7 November 2026 review: actual publisher PDF 4.0.1, 15 September 2024, 78 pages, front matter/copyright and relevant numbered operative sections 0.5–0.10 and chapters 1–6 compared with CTFLpractice lessons. Earlier mirror/search descriptions are historical access records. TheK2 white-box objectives require explanation; the source does not justify a categorical ban on small numeric illustrations that support explanation. Later Exam Rules 1.2§4.1.4 usesK2 for keyword definitions, while syllabus§0.5 usesK1; keep dated scopes distinct. No copied questions or figure assets.

  8. Market practice

    The Scrum Guide — The Definitive Guide to Scrum: The Rules of the Game (November 2020) ↗ — Ken Schwaber and Jeff Sutherland · Scrum Guide, November 2020: actual official HTML Developers, The Sprint, Increment and Definition of Done sections read 7 November 2026. Organizational quality standards are a minimum; Scrum is not every Agile method.

    The framework definition itself: three accountabilities, five events, three artifacts with their commitments, and the five Scrum values. Thirteen pages, about 3,956 words, CC BY-SA 4.0.

    Used here for the agile-delivery questions a Payments Business Analyst, a Payment Quality Assurance Analyst and a Payments Product Manager are asked — and, as often, for what the Guide does not say. Additional actual read scope7November2026: Official Scrum Guide November2020, actual ProductBacklog/refinement, SprintPlanning and SprintReview sections read7November2026: emergent ordered work, ongoing refinement, Done-within-Sprint readiness, possible planning refinement, Developer sizing/selection and feedback. No mandatory1–2Sprint buffer, user-story format or universal all-questions-answered rule; no whole-guide read claimed in this pass. · Checked 2026-08-18

    Still current in August 2026. There is no 2025 or 2026 revision of the Guide.

    The confusable document is a rename. "Scrum Guide Expansion Pack" (v2025.6) became "Scrum Guide Expanded" (v2026.1, 18 January 2026), published at scrumexpansion.org by Jocham, Coleman and Sutherland. Same URL path, different name, and Jeff Sutherland co-authors both it and the Guide — which is exactly the hook that makes wrong credit plausible. It is not a version of the Scrum Guide.

    Nine terms interview answers routinely attribute to Scrum appear zero times in the Guide: story points, velocity, Definition of Ready, sprint zero, user stories, acceptance criteria, grooming, T-shirt sizing, planning poker. So do "estimate" and "estimation".

    Two that are usually said to be absent and are present, which is why this paragraph exists: burn-down charts are named once and subordinated — "Various practices exist to forecast progress, like burn-downs, burn-ups, or cumulative flows. While proven useful, these do not replace the importance of empiricism" — and backlog refinement is defined as "an ongoing activity". What is absent is refinement as an event, and the absent word is "grooming".

    The Guide does require Product Backlog items to acquire a size, and puts sizing on the Developers, while naming no unit, scale or technique. It says "accountabilities", not "roles"; five events, not four; never "ceremony".

    Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.

    Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.

    Read in full from three independent mirrors that agree byte-for-byte on section structure, on the CC BY-SA 4.0 footer, on word count to within four words, and on all sixteen term-frequency counts above. Edition confirmed as 2020 specifically by zero occurrences of "Development Team" and thirteen of "Product Goal". Actual selected sections above read; prior metadata and wider source-use notes preserved. No full member book or adjacent legacy scheduling rule is implied.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.