DOMAIN 01 / 18 TOPICS

Software testing foundations

What testing is for. Then the first two test design techniques a tester learns: equivalence partitioning and boundary value analysis, with practice on one everyday app.

YOUR PROGRESS IN THIS DOMAIN

0 of 18 topics demonstrated.

The whole domain takes about 3 hours 45 minutes.

Try this one without a pass

READ THE FIRST EXPLANATION →

What testing is for — the first explanation of every topic is open. Deeper levels stay Pro.

DOMAIN CERTIFICATE / CHECKABLE CREDENTIAL

Earn the Software testing foundations certificate

Pass the timed exam to earn a public, checkable credential in the name on your account.

Draw
20 random questions
Time
30 minutes
Pass
75%

Practice checkpoints explain every answer. This separate exam is the assessment that issues the certificate.

Software testing foundations — specimen certificate

Payments Signal

Specimen — not issuedCertificate of achievement

This certifies that

Your name here

has successfully passed the timed, server-marked exam for

Software testing foundations

Assessed domains

Software testing foundations

Specimen — nothing to verify

Assessment result

Not sat

Issued

Not issued

Syllabus as at

Not sat

Credential ID

None issued

Specimen — nothing to verify

paymentssignal.com/certificates

A blank specimen, shown so you can see the document before you sit for it. Nobody holds this, no exam was sat for it, and it is not an issued credential. A real one is issued by Payments Signal after an open-book timed exam. It is not accredited by any bank, payment scheme, standards body or awarding organisation.

  1. 0110 MIN
    What testing is forTesting is tasting the soup before you serve it. It finds problems and gives the team true facts, but it cannot prove that nothing is wrong.START HERE — NO PREREQUISITES
  2. 0210 MIN
    Mistakes, defects and failuresAn error is a human action, a defect is a flaw in the work, and a failure is an observed wrong result. Reviews can find defects before execution; finding causes reduces repeats.AFTER: What testing is for
  3. 0310 MIN
    Testing in the life cycle (plan, build, test, release)Testing can begin with requirements and design, continue through builds and return after release. Early checks can avoid later rework; impact and risk guide checks after change.AFTER: What testing is for
  4. 0412 MIN
    The test process, step by stepThe selected syllabus groups testing into seven overlapping activities: planning, control, analysis, design, implementation, execution and completion. Teams tailor them.AFTER: Testing in the life cycle (plan, build, test, release)
  5. 0512 MIN
    Five test levels: parts, systems and acceptanceFive selected test levels group work by objective and test object: component, integration, system, system integration and acceptance. They overlap; size does not define them.AFTER: Testing in the life cycle (plan, build, test, release)
  6. 0610 MIN
    Test types: functional, non-functional, black-box and white-boxSeparate what is evaluated from how tests are derived. Four overlapping perspectives can apply at different levels; confirmation and regression describe purposes after a change.AFTER: Five test levels: parts, systems and acceptance
  7. 0712 MIN
    Writing test conditions and test casesIdentify what to check from a trustworthy basis, then specify cases with setup, data, actions, expected results and postconditions. Record unresolved rules; do not invent any.AFTER: The test process, step by step
  8. 0812 MIN
    Equivalence partitioningGroup data by expected equivalent processing, exercise representatives and state the coverage goal. One value per partition covers that model, not every implementation fault.AFTER: Writing test conditions and test cases
  9. 0912 MIN
    Boundary value analysisDeclare the ordered domain and partitions, then combine coverage items from every boundary. An upper-limit pair is useful but may omit domain endpoints or three-value neighbours.AFTER: Equivalence partitioning
  10. 1012 MIN
    Decision table testingModel condition combinations and actions, separate feasible rules from open questions, and report full or minimized coverage. A covered table does not prove the rules are complete.AFTER: Writing test conditions and test cases
  11. 1112 MIN
    State transition testingUse a reviewed state and event model to pick sequences, valid moves and invalid attempts. State the coverage goal and expected refusals; a missing arrow does not prove invalidity.AFTER: Writing test conditions and test cases
  12. 1212 MIN
    Exploratory testing and error guessingLearn, design, execute and evaluate together; use experience to choose useful experiments. A charter, timebox and notes can structure the work without defining every activity.AFTER: Mistakes, defects and failures · Writing test conditions and test cases
  13. 1311 MIN
    Reviews and static testingStatic testing examines work without running the product. People review it or tools analyse it. Reviews can uncover flaws early and help people agree what the work should mean.AFTER: Mistakes, defects and failures
  14. 1412 MIN
    Writing a defect report: severity and priorityA defect report helps people investigate a problem and decide what to do. Record steps, context, expected and actual results, evidence and doubt. Severity is not priority.AFTER: Mistakes, defects and failures · Writing test conditions and test cases
  15. 1512 MIN
    Acceptance tests from examplesAgree examples of what the software should do before it is built, and turn each example into a test.AFTER: Writing test conditions and test cases
  16. 1612 MIN
    Risk-based test planningThere is never time to test everything. List what could go wrong, judge how likely and how harmful each thing is, and test the biggest risks first.AFTER: The test process, step by step · Test types: functional, non-functional, black-box and white-box
  17. 412020 MIN
    How the project and context shape testing: sequential, iterative and incremental modelsThe same feature is tested in different ways in different projects. Learn the sequential, iterative and incremental models and the context factors that shape the test plan.AFTER: Testing in the life cycle (plan, build, test, release) · Five test levels: parts, systems and acceptance
  18. 430520 MIN
    The STLC: phases, entry and exit criteria and deliverables, and how it fits each software development life cycle (SDLC) modelLearn a six-phase STLC teaching convention, its entry and exit criteria and deliverables, and how it relates to the seven test-process activities and different development models.AFTER: The test process, step by step