Testing inside a sprint
Test a little every day of the sprint. Plan the tests with the stories, check each story as it is built, and keep the end calm.
L1–L4 are part of the Pro pass
L0 Explain simply
Analogy: cooking and washing up as you go. A cook who washes each pan after use ends the evening with a clean kitchen. A cook who leaves every dish to the end faces a huge pile and a late night.
Daily List is a to-do list app. Its team works in two-week style rounds called sprints. In the last sprint, Tom left all testing for the final day. A pile of stories arrived at once, and some faults were found too late to fix.
This sprint Mei asks Tom to wash up as he goes. He plans tests during . He tests each story the day it is built. By the last day, only a few checks are left, and the team ends the round calm.
This is testing inside a sprint: a little testing every day instead of a big pile at the end.
The picture has a limit. Dishes are all alike, but stories are not. Some need long tests and some need short ones.
(SYNTHETIC / TRAINING ONLY: Daily List and every person named in this lesson are invented.)
PLAIN WORDS · 1 in this section
- pan
- a wide cooking dish used on a stove
PICTURE IT
The picture is the one the lesson above opens with. The table below shows how each part of it matches the software.
THE REAL JOB Planning tests with the stories and testing every day so the last day stays calm.
- Plan the menu
- Cook and wash
- Check the clock
- Close the kitchen
HOW THE PICTURE MAPS
| In the picture | In the software |
|---|---|
| Washing up as you cook | Testing each story as it is built |
| A sink full of dishes | A pile of untested stories at the end |
| The evening menu | The sprint backlog |
| The clock on the wall | The burndown chart |
| A deep clean of the oven that waits for the weekend | Testing outside the sprint, kept for a stated reason |
WHERE THIS PICTURE STOPS
- Dishes are all alike. Stories need different amounts of testing.
- A kitchen clock runs by itself. A burndown chart shows only what the team reports.
- A dirty pan does not ask for a rule. A story needs a clear Definition of Done.
- A weekend clean can wait for ever. Test work left for after the sprint needs an owner, or it becomes a hidden phase.
HOOK
Wash as you go.
REMEMBER IT THIS WAY
A rule of thumb: if you see this, think that.
If a story is built today, usually test it today. Tom's last-day pile of stories shows what waiting costs.
| In the trick | What it stands for |
|---|---|
| Built today | Tests each story the day it is built |
| Last day | A pile of stories and faults found too late |
It misleads when a story needs a long test that cannot finish in one day.
TELL A FRIEND
Washing up as you cook so the evening ends calm. Tom tests each story as it is built.
OFTEN MIXED UP WITH The tester in a Scrum team. The Scrum tester lesson says where a tester sits. This lesson says how the tester spends each day of the sprint.
PRACTISE AND KEEP
Sources for this topic — 16 sources
- Market practice
The Scrum Guide — The Definitive Guide to Scrum: The Rules of the Game (November 2020) ↗ — Ken Schwaber and Jeff Sutherland · Scrum Guide2020, Sprint Backlog/Definition of Done: unfinished items return to Product Backlog for future consideration; no release or Sprint Review presentation. Opened6 November 2026.
Still current in August 2026. There is no 2025 or 2026 revision of the Guide.
The confusable document is a rename. "Scrum Guide Expansion Pack" (v2025.6) became "Scrum Guide Expanded" (v2026.1, 18 January 2026), published at scrumexpansion.org by Jocham, Coleman and Sutherland. Same URL path, different name, and Jeff Sutherland co-authors both it and the Guide — which is exactly the hook that makes wrong credit plausible. It is not a version of the Scrum Guide.
Nine terms interview answers routinely attribute to Scrum appear zero times in the Guide: story points, velocity, Definition of Ready, sprint zero, user stories, acceptance criteria, grooming, T-shirt sizing, planning poker. So do "estimate" and "estimation".
Two that are usually said to be absent and are present, which is why this paragraph exists: burn-down charts are named once and subordinated — "Various practices exist to forecast progress, like burn-downs, burn-ups, or cumulative flows. While proven useful, these do not replace the importance of empiricism" — and backlog refinement is defined as "an ongoing activity". What is absent is refinement as an event, and the absent word is "grooming".
The Guide does require Product Backlog items to acquire a size, and puts sizing on the Developers, while naming no unit, scale or technique. It says "accountabilities", not "roles"; five events, not four; never "ceremony".
Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.
Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.
Read in full from three independent mirrors that agree byte-for-byte on section structure, on the CC BY-SA 4.0 footer, on word count to within four words, and on all sixteen term-frequency counts above. Edition confirmed as 2020 specifically by zero occurrences of "Development Team" and thirteen of "Product Goal". Actual selected sections above read; prior metadata and wider source-use notes preserved. No full member book or adjacent legacy scheduling rule is implied.
- Market practice
ISTQB Certified Tester Foundation Level Syllabus v4.0.1 ↗ — International Software Testing Qualifications Board · Section 5.1.2, the tester's contribution to iteration and release planning (confirmed against the syllabus, read in full text from a mirror copy of the publisher PDF, v4.0.1, 15 September 2024)
v4.0.1 is dated 15 September 2024 and is a list of corrections to v4.0 (21 April 2023) that reworded six learning objectives — not a cosmetic reissue. 78 pages.
Two traps this entry exists to stop. v4.0.2 is the German edition (1 March 2025, 94 pages), so sorting by version number reaches the wrong document. And the widely-repeated per-chapter question allocation "8 / 5 / 4 / 11 / 9 / 3" is wrong: it is 8 / 6 / 4 / 11 / 9 / 2, derived from three official sample-exam answer keys and confirmed against the Exam Structure Tables.
The single most consequential detail for a question bank: white-box coverage — statement and branch — is K2 "Explain", not K3 "Apply" (FL-4.3.1, FL-4.3.2, FL-4.3.3), and MC/DC, path and condition coverage are declared out of scope in §4.3. A question asking a candidate to compute branch coverage is testing something this syllabus does not.
Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.
Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.
Read from two independent PDF-to-markdown conversions mirrored on raw.githubusercontent.com. They are treated as faithful because they were produced by unrelated parties with different tooling, agree on the full 64-item objective set including wording, and reproduce the same internal inconsistency present in the source PDF. Chapter 1 reads "testware that supports" where Appendix B reads "that support". A conversion artefact does not replicate across two toolchains.
The licence permits attributed non-commercial extracts and use as the basis for articles. Whether a site that sells a pass may rely on that is an owner's decision, not this entry's.
7 November 2026 review: actual publisher PDF 4.0.1, 15 September 2024, 78 pages, front matter/copyright and relevant numbered operative sections 0.5–0.10 and chapters 1–6 compared with CTFLpractice lessons. Earlier mirror/search descriptions are historical access records. TheK2 white-box objectives require explanation; the source does not justify a categorical ban on small numeric illustrations that support explanation. Later Exam Rules 1.2§4.1.4 usesK2 for keyword definitions, while syllabus§0.5 usesK1; keep dated scopes distinct. No copied questions or figure assets.
- Market practice
Definition of Done vs. Definition of Ready (Scrum Alliance) ↗ — Scrum Alliance · A Definition of Done is a shared checklist for finished work; a Definition of Ready is a checklist for work that may start (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
How to Sprint Plan when QA always lags behind Development ↗ — Scrum.org forum · Scrum.org forum 'How to sprint plan when QA always lags behind development' and related threads: estimate all work to Done, slice small, swarm. Practitioner advice. (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Regression and UAT in the last days of a two-week sprint ↗ — Scrum.org · Scrum.org threads (node/71418, node/61411): regression squeezed into the last days of a two-week sprint; suggestion to automate and run continuously. (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
In Sprint automation ↗ — Scrum.org forum · Scrum.org forum 'In Sprint automation' and Ministry of Testing 'In-sprint test automation on agile teams'. Practitioner views differ. (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
In-Sprint Test Automation On Agile Teams: Yes You Can! ↗ — Ministry of Testing · Scrum.org forum 'In Sprint automation' and Ministry of Testing 'In-sprint test automation on agile teams'. Practitioner views differ. (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
What is Kanban in project management (Atlassian guide) ↗ — Atlassian · scrum-guide-2020 (already on the topic): the Daily Scrum is a daily event for the Developers to inspect progress toward the Sprint Goal. atlassian-kanban-guide: Kanban visualises work and limits work in progress. superthread-kanban-wip: full columns reveal bottlenecks. Both Kanban pages are search excerpts, page not opened. Closes CTFL-AT FA-2.2.x (task board, daily meeting) and part of FA-1.2.1 (
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Kanban work in progress limits explained (Superthread guide) ↗ — Superthread · scrum-guide-2020 (already on the topic): the Daily Scrum is a daily event for the Developers to inspect progress toward the Sprint Goal. atlassian-kanban-guide: Kanban visualises work and limits work in progress. superthread-kanban-wip: full columns reveal bottlenecks. Both Kanban pages are search excerpts, page not opened. Closes CTFL-AT FA-2.2.x (task board, daily meeting) and part of FA-1.2.1 (
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Certified Tester Foundation Level Extension Syllabus, Agile Tester, Version 2014 (ASTQB copy) ↗ — ISTQB (hosted by ASTQB) · Test progress and product quality are shown with the smallest useful set of work products and metrics. (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Certified Tester Advanced Level Agile Tester (CTAL-AT), certification page (ISTQB) ↗ — International Software Testing Qualifications Board (ISTQB) · Version 2.0 compares the kinds of testing done during an iteration with those done after it. (search excerpt, page not opened) The syllabus text, read in full from a mirror copy of the publisher PDF (ISTQB syllabus CTAL-AT v2.0, 17 April 2026), confirms the scope. Its chapters are test strategy and test approach challenges, people and teams, test management and test process improvement, shift left, agile approaches and test techniques, and test automation and test tools.
Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
Purpose, content and audience for test reports (Trusted Institute, Foundation Level study notes) ↗ — Trusted Institute · Study notes on test progress and summary reports and who reads them (search excerpt, page not opened)
Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.
- Market practice
ISTQB Certified Tester Advanced Level Agile Tester Syllabus v2.0 GA (17 April 2026) ↗ — International Software Testing Qualifications Board (ISTQB) · Section 1.1.1 (printed page 14): test types during and after an iteration: functional, non-functional, white-box, black-box, exploratory; choices reflected in the Definition of Done and test approach; version 2.0 of 2026-04-17, mirror copy of the publisher PDF, version checked against front matter, opened
Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CTAL-AT v2.0, 17 April 2026), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.
V52 opened actual ISTQB publisher PDF7 November 2026: version 2.0 GA,17 April 2026 front/introduction and all substantivechapters 1–6/31 learning objectives, throughprintedp 50 and selectedreferences. Earlier ASTQB-copy history remains above. All test types any stage; genuine KPI exception; source release-level DoD usage preserved. No actual figure pixels inspected or commercial extraction permission established.
- Market practice
ISTQB Certified Tester Advanced Level Agile Tester Syllabus v2.0 GA (17 April 2026) ↗ — International Software Testing Qualifications Board (ISTQB) · Section 3.2.1 (printed page 27): agile test monitoring and control: light metrics, burn-down charts, dashboards, collaborative control, triggers; version 2.0 of 2026-04-17, mirror copy of the publisher PDF, version checked against front matter, opened
Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CTAL-AT v2.0, 17 April 2026), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.
V52 opened actual ISTQB publisher PDF7 November 2026: version 2.0 GA,17 April 2026 front/introduction and all substantivechapters 1–6/31 learning objectives, throughprintedp 50 and selectedreferences. Earlier ASTQB-copy history remains above. All test types any stage; genuine KPI exception; source release-level DoD usage preserved. No actual figure pixels inspected or commercial extraction permission established.
- Market practice
ISTQB Certified Tester Advanced Level Agile Tester Syllabus v2.0 GA (17 April 2026) ↗ — International Software Testing Qualifications Board (ISTQB) · Section 3.3.1 (printed page 27): coverage types for agile reporting: requirements, code, exploratory, infrastructure and environment; metrics as communication; version 2.0 of 2026-04-17, mirror copy of the publisher PDF, version checked against front matter, opened
Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CTAL-AT v2.0, 17 April 2026), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.
V52 opened actual ISTQB publisher PDF7 November 2026: version 2.0 GA,17 April 2026 front/introduction and all substantivechapters 1–6/31 learning objectives, throughprintedp 50 and selectedreferences. Earlier ASTQB-copy history remains above. All test types any stage; genuine KPI exception; source release-level DoD usage preserved. No actual figure pixels inspected or commercial extraction permission established.
- Market practice
ISTQB CTAL-AT syllabus v2.0 — official publisher PDF ↗ — ISTQB · CTAL-AT v2.0 GA,17 April 2026: relevant §§1.1/1.3,2.1,3.1.2 and5.2.2; actual official publisher PDF opened and sections read6 November 2026.
Actual publisher PDF opened through normal web access and relevant sections read on6 November 2026. Direct download returned403; normal web PDF access worked. Copyright front matter is scoped, not blanket permission to restyle figures; no syllabus art is copied.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.