DOMAIN 07 / 37 TOPICS

Testing in agile and DevOps teams

The tester in a whole-team world: sprints, pipelines, automation literacy, safe release practices and working with developers.

YOUR PROGRESS IN THIS DOMAIN

0 of 37 topics demonstrated.

The whole domain takes about 9 hours.

Try this one without a pass

READ THE FIRST EXPLANATION →

Whole-team quality — the first explanation of every topic is open. Deeper levels stay Pro.

DOMAIN CERTIFICATE / CHECKABLE CREDENTIAL

Earn the Testing in agile and DevOps teams certificate

Pass the timed exam to earn a public, checkable credential in the name on your account.

Draw
20 random questions
Time
30 minutes
Pass
75%

Practice checkpoints explain every answer. This separate exam is the assessment that issues the certificate.

Testing in agile and DevOps teams — specimen certificate

Payments Signal

Specimen — not issuedCertificate of achievement

This certifies that

Your name here

has successfully passed the timed, server-marked exam for

Testing in agile and DevOps teams

Assessed domains

Testing in agile and DevOps teams

Specimen — nothing to verify

Assessment result

Not sat

Issued

Not issued

Syllabus as at

Not sat

Credential ID

None issued

Specimen — nothing to verify

paymentssignal.com/certificates

A blank specimen, shown so you can see the document before you sit for it. Nobody holds this, no exam was sat for it, and it is not an issued credential. A real one is issued by Payments Signal after an open-book timed exam. It is not accredited by any bank, payment scheme, standards body or awarding organisation.

  1. 50012 MIN
    Whole-team qualityQuality is not one person's job at the end. The whole team shares it, and testers lead the skill.AFTER: What testing is for
  2. 50112 MIN
    The tester in a Scrum teamScrum names Developers, not testers. A tester is one of the Developers, who brings testing skill to every step of the sprint.AFTER: Testing in the life cycle (plan, build, test, release)
  3. 50214 MIN
    Testing inside a sprintTest a little every day of the sprint. Plan the tests with the stories, check each story as it is built, and keep the end calm.AFTER: The tester in a Scrum team
  4. 50314 MIN
    Estimating in agile teams: points and planning pokerAgile teams size work by comparing it with work already done, and they talk about every gap in their guesses.AFTER: Testing inside a sprint · Test estimation: breakdown, three-point, history and experience
  5. 50412 MIN
    The agile testing quadrantsFour boxes sort tests by who they face and what they do. Use them to see which kind of check your team has forgotten.AFTER: Test types: functional, non-functional, black-box and white-box
  6. 50512 MIN
    The test pyramid and its criticsMany small fast tests, fewer slow big ones. The shape is a guide to cost and speed, and wise people still argue about it.AFTER: The agile testing quadrants
  7. 50612 MIN
    Shift left and shift rightTest earlier, while the plan is still on paper, and keep watching after release. Both ends of the line teach the team something.AFTER: Testing in the life cycle (plan, build, test, release)
  8. 50712 MIN
    Unit tests for testersA unit test checks one small piece of code, fast and alone. Testers read them to see what is already checked and what is not.AFTER: Five test levels: parts, systems and acceptance
  9. 50812 MIN
    Test-driven development for testersIn test-driven development a developer writes a failing test first, then the code to pass it. Testers read the tests as a plain list of promises.AFTER: Unit tests for testers
  10. 50914 MIN
    Behaviour-driven development in practiceWrite each example as a short scene in plain words. Everyone can read it, and a tool can run it.AFTER: Acceptance tests from examples
  11. 51014 MIN
    Code review for testersA tester can read a code change and ask what if. You do not need to write code to find missing checks and untested paths.AFTER: Reviews and static testing
  12. 51112 MIN
    Static analysis for testers: linters, scanners and quality gatesTools can read code and flag slips and risky patterns without running it. A tester learns what they find, what they miss and how a quality gate uses them.AFTER: Reviews and static testing · Code review for testers
  13. 51212 MIN
    Version control for testersVersion control keeps every change to the code and the tests, with who made it and when. A tester needs a few of its moves: branch, merge, stash and a safe push.AFTER: The tester in a Scrum team
  14. 51312 MIN
    Continuous integration explainedContinuous integration joins everyone's work to a shared copy often. A machine builds the app and runs tests on every join, so problems show up in minutes.AFTER: Version control for testers
  15. 51412 MIN
    Where tests run in a pipelineA pipeline runs quick checks first and slow checks only for changes that passed. A red result stops the change, and the team learns why before going on.AFTER: Continuous integration explained
  16. 51512 MIN
    Release checklists for fast teamsA fast team ships often, so it cannot hold a long sign-off meeting each time. A short checklist, trusted and used every time, confirms the few things that must be true.AFTER: Smoke and sanity testing
  17. 51612 MIN
    Test data and environments in pipelinesA pipeline needs a fresh place to test and known data to test with. Build both for each run, check they match the real setup, and throw them away after.AFTER: Where tests run in a pipeline
  18. 51712 MIN
    Containers as disposable test environmentsA container packs a program with everything it needs, so the same setup starts the same way on any computer. That makes a clean, throwaway test environment cheap to build.AFTER: Test data and environments in pipelines
  19. 51812 MIN
    Feature flags and canary releasesA feature flag lets a team ship code switched off and turn it on for a few users first. A canary release widens a release step by step, with a quick way to stop.AFTER: Where tests run in a pipeline
  20. 51912 MIN
    Experiments and A/B tests for testersAn A/B test shows two versions to two groups and compares one result. A tester checks that users are split as planned, that events are logged and that the test is cleaned up.AFTER: Feature flags and canary releases
  21. 52012 MIN
    Testing in production, safelySome faults only show with real traffic. A tester can run safe checks on the live app, if they are read-only, flagged, reversible and use marked test data.AFTER: Feature flags and canary releases
  22. 52112 MIN
    Chaos engineering basicsChaos engineering adds a small, planned fault on purpose to learn if a system copes. It starts from a measure of normal, keeps the harm small and has a stop button.AFTER: Testing in production, safely · Resilience testing: timeouts, retries, circuit breakers and graceful degradation
  23. 146018 MIN
    Git and GitHub, hands on: clone, branch, commit, pull requestTest code lives in Git. Learn to clone a project, work on a branch, save a commit, open a pull request and settle a merge conflict.AFTER: Version control for testers
  24. 153017 MIN
    GitHub Actions and Jenkins: run your tests on every pushA pipeline file tells a server when to run your tests and what to do with the results. Read and write a small one with a trigger, a job and steps.AFTER: Where tests run in a pipeline
  25. 156015 MIN
    Docker Compose: a test environment you can start with one commandA Compose file lists the app, the database and the tools your tests need. One command starts them all, and another stops them.AFTER: Containers as disposable test environments
  26. 165015 MIN
    Quality gates: the checks that decide if a build may go onA quality gate is a set of conditions a build must meet. Learn how to pick good ones, avoid gaming them and read a failed gate.AFTER: Where tests run in a pipeline
  27. 302316 MIN
    Testing infrastructure as code and configurationThe setup of a server can live in a file. Check that file like code: read it, run rules on it, preview its changes, try it in a test place and look for drift.AFTER: Containers as disposable test environments · Testing cloud and serverless applications · Where tests run in a pipeline · Test environments and configurations
  28. 302616 MIN
    Deployment strategies and rollback testing: blue-green, rolling and dark launchTeams can release a new version in several ways. Test each way, and practise the way back, so that a bad release can be undone quickly and without losing user data.AFTER: Feature flags and canary releases · API versions and backward compatibility
  29. 412120 MIN
    DevOps and testing: what changes in the test processIn DevOps, building, testing and running an app become shared work with shared automation. Learn what that gives a tester, what it costs, and what still needs a person.AFTER: Continuous integration explained · Whole-team quality · Where tests run in a pipeline
  30. 413322 MIN
    Build servers and pipelines in practice: Jenkins, GitLab CI and GitHub Actions comparedSee what a build server does for a tester, how Jenkins, GitLab continuous integration (CI) and GitHub Actions describe one pipeline, and how to read a pipeline that has gone red.AFTER: Continuous integration explained
  31. 426016 MIN
    Testing with Kubernetes and TestcontainersTest against real services without a shared server. Learn how throwaway containers help in a test, and how a Kubernetes cluster tells you when an app is ready.AFTER: Docker Compose: a test environment you can start with one command
  32. 430016 MIN
    Jenkins pipelines: run tests, publish results and read an unstable buildMany teams run their tests on Jenkins. Learn a Jenkinsfile, its stages, how test results are published, and what an unstable build means.AFTER: GitHub Actions and Jenkins: run your tests on every push
  33. 430224 MIN
    Sprint ceremonies for testers: what to bring, ask and say in planning, the daily scrum, review and retrospectiveGo meeting by meeting through a sprint. See what a tester brings, asks and says in refinement, planning, the daily scrum, review and retrospective.AFTER: The tester in a Scrum team · Testing inside a sprint
  34. 430326 MIN
    Waterfall and agile testing compared: documents, timing, roles, regression and releaseSee how a tester's week differs in a waterfall or V-model project and in an agile team, and what stays the same. The Daily List example is told twice.AFTER: How the project and context shape testing: sequential, iterative and incremental models
  35. 430415 MIN
    Quality across the DevOps loop: what a tester does at each stageA change travels in a loop, from plan to build, test, release and the live app, then back to the plan. A tester adds something useful at every stage.AFTER: DevOps and testing: what changes in the test process · Shift left and shift right · Testing in production, safely · Feature flags and canary releases
  36. 430518 MIN
    Agile iterations: quality risks, effort, independence and toolsIn each agile iteration the whole team rates quality risks and sizes the test work with the risk in mind. Learn the steps, the tools and three ways to keep tests independent.AFTER: The tester in a Scrum team · Testing inside a sprint · Estimating in agile teams: points and planning poker · Risk-based test planning
  37. 431514 MIN
    Testing a settings-only change: no code, still a changeMap what reads the setting, match the test site to live, test the old and new values and report what it touches.AFTER: Feature flags and canary releases