TOPIC 22/2613 MINNOT STARTED

Reconciling against the scheme

Nostro reconciliation argues with a bank. This one argues with an infrastructure: one settled figure against thousands of payments, and a record that is final by design.

L1–L4 are part of the Pro pass

L0 Explain simply

compares two records: what Bank Alfa's own ledger says, and what a correspondent's statement says. Two banks, two books, and either of them can be the one that is wrong.

This is the other reconciliation, and it is worth meeting on its own because three things change at once.

The counterparty changes. It is not a bank now. It is the clearing or settlement system every participant in that market uses, and it has no interest in whose ledger is prettier.

What it tells you changes. A correspondent sends a statement listing entries, so items can be ticked off one at a time. A scheme often reports one figure for a whole cycle. One number, standing for thousands of payments.

(SYNTHETIC / TRAINING ONLY — every firm and figure in this topic is invented.)

The settled movement and its evidence are different. A scheme’s rules define final settlement; a participant cannot unwind it by changing its books. But a downloaded report, selected cycle, mapping or import can still be wrong. A difference is a question to investigate against the operator’s evidence, not proof that the participant’s ledger must be rewritten. Correct the record shown to be wrong through the authorised process, preserving the settled movement and its .

That last point is the whole reason this is a separate skill rather than the same skill applied elsewhere. The comparison runs the same way. The conclusion does not.

This topic answers what actually gets compared, why the two sides disagree, what a break means when the counterparty is an infrastructure, and where the reports a bank reconciles against come from.

PLAIN WORDS · 2 in this section
prettier
a tool that tidies the layout of code
unwind
undo step by step

PICTURE IT

One shared lunch bill checked against the team's order slips

A team eats lunch together. One person collects every order slip, then the restaurant charges the whole table once to a single card. Later the collector checks the slips against that one charge. Some slips never reached the kitchen. One dish was counted on the next day's bill. If they disagree, the collector checks both slips and bill. A paid card charge is not proof that every copied figure is accurate; correcting the evidence does not erase the payment.

THE REAL JOB Scheme reconciliation compares a bank’s instructed records with acceptance and settlement evidence to establish the cause of a difference before correction.

  1. Own systems issue payment instructions
  2. Scheme accepts some into a cycle
  3. Settlement moves the money, final
  4. Rebuild the figure from own records
  5. Reconcile items as well as the total
  6. Correct the record shown to be wrong
From instructed payments to an evidenced correction

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The collector and the pile of order slipsBank Alfa, a fictional bank, and the payments its own systems instructedWho: Bank Alfa
Slips the kitchen took onto its order listPayments the scheme accepted into a cycle, one round of settlement
The one card charge for the whole tableThe settlement position: one net figure per bank for a cycle, received set against sent
A slip the kitchen never tookA payment instructed but never accepted by the scheme
A dish counted on the next day's billA possible cycle-timing difference, closed only after item and settlement evidence confirms it
The card is already paid at the tillFinal settlement stands while evidence determines which record needs correction
A service charge added to the card chargeFees the scheme takes off and settles with everything else

WHERE THIS PICTURE STOPS

  • A lunch has one payer and one restaurant. A scheme settles many participants at once. It adds up what each bank sent and received in a cycle and gives each bank one net figure.
  • A card charge is easy to total from slips. A bank has to rebuild the scheme's figure from its own records, and nobody tells it which item caused a difference.
  • Two slip mistakes of opposite size can cancel out, so the charge can match while items are still wrong. The picture does not show this, so items are reconciled as well as the total.
  • A restaurant could argue about a charge. A scheme break goes through a participant support process with a defined way in and defined evidence. It often has a defined window, and no one makes an exception for a valued relationship.
  • The charge is not the money left in the account. A bank can agree the position exactly and still find the account balance wrong, because other items went through the same account.

HOOK

A matching total can still hide wrong items.

REMEMBER IT THIS WAY

A sequence: the real steps, in order.

Sent, taken, paid. Ask of any report: is this what we sent, what the scheme took, or what was paid?

What each part of the trick stands for
In the trickWhat it stands for
sentwhat the institution instructed, the payments its own systems sent out
takenwhat the scheme accepted, the payments that passed the checks into a cycle
paidwhat settled, the money that actually moved across the books of the settlement agent

The names are only labels for three records, and agreeing the paid record does not make the separate settlement account balance right.

TELL A FRIEND

Check instructed, accepted and settled records. Final settlement establishes the movement, while evidence determines whether a local record, delivered report or import needs correction.

OFTEN MIXED UP WITH Nostro reconciliation. checks a bank against a correspondent statement. Scheme reconciliation also checks acceptance and cycle evidence. Final settlement is authoritative for the movement, while a delivered report or its import can still be wrong.

SEE THE PAYMENT MOVE

PICTURE THE JOURNEY

A food festival with bracelets and a tally tentOpen to read the picture, how it matches the payment and where it stops.

PICTURE IT

A food festival with bracelets and a tally tent

Picture a big food festival. Every visitor wears a wristband. Each wristband is tied to an account kept by a wristband desk. Several companies run wristband desks. Other companies, called payout desks, sign up the food trucks and pay them. The festival itself runs one tally tent that every desk uses.

A visitor taps her wristband at a coffee truck. The reader asks her wristband desk for a go-ahead. The desk says yes, gives a go-ahead number and puts a hold mark on her balance. Nothing is paid yet. The truck keeps the go-ahead number with the sale.

All day the truck piles up its taps. At closing it gives the whole list, each tap with its go-ahead number, to its payout desk. Until now the list is only a list of promises.

The payout desk copies every tap onto a claim line and takes the lines to the tally tent. The tent checks that each line is complete and carries its go-ahead number. It attaches a handling fee to each line. That fee belongs to the wristband desk, so the desk will pay across the sale less the fee. Then the tent sorts the lines by wristband desk.

Next the tent adds up. Visitors of one wristband desk ate at trucks of many payout desks, and the other way round. Paying line by line would mean far too many small transfers. So the tent finds one total for each desk: what it owes, minus what it is owed. A total is a written figure. No money has moved.

In this festival the tent keeps no money. It sends the totals to a bank cashier outside the tent, who keeps an account for each desk. At a time the festival rules set, the cashier moves each total between those accounts. Only now does real money move between the desks.

Each desk also settles with its own people. The wristband desk swaps the hold mark on the visitor's balance for a final entry when the claim line reaches it. The word pending disappears. That does not wait for the cashier's move. The payout desk pays the truck the sale less a service charge. That charge covers the handling fee, the tent's own fee and the payout desk's margin. Each side gets a statement for the same sale.

Four things can bend the story. A truck that hands in its list very late is usually still paid, but on weaker terms. The extra amount on a claim line bigger than the go-ahead, for example after a tip, is the least protected part of the sale. A torn or hard to read line is handed back, and the rest go through. A refund is not an erased line. It is a new line that travels the same route backwards.

THE REAL JOB Card clearing and settlement turns an approved sale into real money: records fix who owes what, then banks move one net amount.

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
A visitor who taps a wristband at a coffee truckThe cardholder who pays at the shop with a cardWho: Maya Chen
The coffee truck that takes the tapThe merchant, the shop that accepts the cardWho: Demo Coffee Ltd
The payout desk that signs up trucks and pays themThe acquirer, the bank that holds the shop's accountWho: Meridian Bank
The wristband desk that keeps the visitor's balanceThe bank that gave out the card and keeps the cardholder's accountWho: Bank Alfa
The festival's tally tent, which every desk usesThe card network, Cardnet, which checks records and totals themWho: Cardnet
The hold mark put on her balance at the go-aheadThe authorisation hold: the issuer, the cardholder's bank, sets the amount aside
The truck's pile of taps, each with its go-ahead numberCaptured sales, each carrying the authorisation code from approval
The truck's list handed to its payout desk at closingThe end-of-day capture batch sent to the acquirer
A claim line the payout desk copies from each tapA clearing record, also called a presentment, sent to the network
The handling fee attached to each line, owed to the wristband deskInterchange: the fee the acquirer pays the issuer on each transaction
One total per desk, found by the tentNet position: what a bank owes minus what it is owed
The bank cashier outside the tent, who keeps an account for each deskThe settlement bank the scheme appoints; in this flow the network holds no accounts
The cashier moving each total between the desks' accountsNet settlement: the first point where money moves between the banks
The hold mark swapped for a final entry on her balanceThe issuer releases the hold and posts the final debit when the clearing record arrives
The truck is paid the sale less a service chargeThe acquirer credits the merchant the sale less the merchant discount
A statement at each desk for the same saleThe cardholder's statement and the merchant's acquiring statement
The truck hands in its list very lateLATE: the batch reaches clearing long after the sale, outside the scheme's window
A claim line bigger than the go-ahead, after a tipAMTDIFF: the claimed amount is higher than the authorised amount
A torn line handed back while the rest go throughREJECT: a record fails the network's edit checks, is repaired and presented again
A refund is a new line travelling the same route backwardsREFUND: a new transaction in the opposite direction, not an undo

WHERE THIS PICTURE STOPS

  • The picture puts the bank cashier outside the tent, and the tent only works out the totals. That is how this flow draws it. What the picture cannot show is the scheme's own rules. A settlement bank that the scheme appoints moves each net amount between settlement accounts, and the scheme's rules set when. This flow draws neither the accounts nor the hours.
  • The picture lets the tent decide what is too late or too different. In real life the network's published rules decide how late a claim may be. They also decide how far a final amount may differ from the approved one, in cases such as tips. The flow shows the shape of these rules and never their figures.
  • The picture follows one sale. In real life the price of one coffee is never what moves. Many records from many banks are netted in each cycle. More than one cycle runs in a day, so one sale is lost inside a larger total. The flow shows direct participants only.
  • In the picture, a go-ahead number is just a slip of paper. A real approval is a promise with a shelf life. Present the sale after the scheme's window and the protection weakens, whatever the terminal showed on the day.
  • A refund in the picture is just another line. What happens to the fees from the first sale is a separate matter between the shop and its acquirer. The flow does not settle it.

HOOK

Clearing counts what is owed; settlement pays one total.

REMEMBER IT THIS WAY

A chunk: a long list grouped so it is easier to hold.

Hold the sale as four chunks: batch, , final posting, . When a sale seems missing, find the last chunk it reached.

What each part of the trick stands for
In the trickWhat it stands for
batchThe end-of-day capture batch sent to the acquirer
clearing recordA clearing record, also called a presentment, sent to the network
final postingThe issuer releases the hold and posts the final debit when the clearing record arrives
net settlementNet settlement: the first point where money moves between the banks

TELL A FRIEND

Maya's approved coffee moves no money at first. Later the day's records are counted, the banks move one net total, and her bank books the debit.

OFTEN MIXED UP WITH Clearing versus settlement. That topic names the split in general: clearing agrees what is owed, settlement pays it, and the gap between them is where risk lives. This flow follows one card sale through both halves, with a fee added in clearing and one net total settled between banks.

MESSAGES INVOLVED

PRACTISE AND KEEP

IMPLEMENTATION RESOURCES

33 RESOURCES

EVIDENCE AT ARM'S REACH

Apply the base message definition first, then the scheme or infrastructure profile that governs this topic.

An XSD checks XML structure. A usage guideline adds profile rules, conditional fields, code restrictions, and business controls. XSD-valid does not mean scheme-compliant.

XSD + definitionBase ISO 20022

ISO 20022 message definitions and XSDs

OPEN OFFICIAL SOURCE
Usage guidelineCBPR+

CBPR+ usage guidelines

OPEN OFFICIAL SOURCE
Usage guidelineCBPR+

PMPG correspondent-payment and reporting market practice

OPEN OFFICIAL SOURCE
Usage guidelineT2

T2 functional specifications, validation rules, and binding XSDs

OPEN OFFICIAL SOURCE
Teaching sampleIllustrative; no scheme profile checked

ACH Addenda 98 — the account number was wrong, and the payment went through anyway — raw POSITIONAL

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

ACH return addenda — a return, an objection, and an answer — raw POSITIONAL

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.052 intraday account report — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.053 account statement — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.054 debit notification — raw XML

PRO PASS
Lifecycle packIllustrative; no scheme profile checked

Corporate MX positive lifecycle — ZIP pack

PRO PASS
MappingCBPR+

MT900 → camt.054 implementation mapping

PRO PASS
MappingCBPR+

MT910 → camt.054 implementation mapping

PRO PASS
MappingCBPR+

MT941 → camt.052 implementation mapping

PRO PASS
MappingCBPR+

MT942 → camt.052 implementation mapping

PRO PASS
MappingCBPR+

MT940 → camt.053 implementation mapping

PRO PASS
MappingCBPR+

MT950 → camt.053 implementation mapping

PRO PASS
Field matrixBase ISO 20022

camt.052 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.053 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.054 field matrix

PRO PASS
Field matrixIllustrative; no scheme profile checked

ACH Addenda 99 field matrix

PRO PASS
Field matrixIllustrative; no scheme profile checked

ACH Addenda 98 field matrix

PRO PASS
Test packIllustrative; no scheme profile checked

Payment lifecycle test cases

PRO PASS
Field matrixT2

T2 RTGS implementation pack field and process matrix

PRO PASS
Test packT2

T2 RTGS implementation pack test cases

PRO PASS
BA checklistT2

T2 RTGS implementation pack BA checklist

PRO PASS
Acceptance criteriaT2

T2 RTGS implementation pack acceptance criteria

PRO PASS
Migration notesT2

T2 RTGS implementation pack migration notes

PRO PASS
Coverage gapsT2

T2 RTGS implementation pack restricted and release-specific gaps

PRO PASS
Profile packCBPR+

CBPR+ implementation pack

PRO PASS
Profile packSEPA SCT

SEPA credit-transfer implementation pack

PRO PASS
Profile packSEPA SDD Core

SEPA direct-debit implementation pack

PRO PASS
Profile packHVPS+

High-value payments implementation pack

PRO PASS
Profile packT2

T2 RTGS implementation pack

PRO PASS
Sources for this topic — 9 sources
  1. Official requirement

    ISO 20022 Catalogue of messages ↗ — ISO 20022 Registration Authority · camt.052, camt.053 and camt.054 account reporting messages

    Defines the current versions of all ISO 20022 message definitions, including the pain, pacs, and camt messages taught on this site. · Checked 2026-07-12

    Each message set is described by a Message Definition Report; earlier versions remain available in the ISO 20022 messages archive.

  2. Official requirement

    TARGET Services ↗ — European Central Bank · The camt.053 end-of-day statement of account, produced per account and only where the account owner configured it

    The Eurosystem's own page for TARGET Services, the family of settlement services it runs in central bank money.

    Cited here for the membership of that family, which is four rather than three. T2 settles payments, T2S settles securities, TIPS settles instant payments, and the Eurosystem Collateral Management System manages the assets banks pledge in Eurosystem credit operations. ECMS is the one most often left out of the list, and it is the one that decides how much intraday credit a participant can raise.

    Cited too for the shape underneath them. T2 itself has two components, central liquidity management and RTGS, and the central liquidity management function serves the other services rather than T2 alone. That is what makes the family one liquidity position reached through several settlement services, rather than four separate systems that happen to share a name. · Checked 2026-08-24

    T2 replaced TARGET2 on 20 March 2023. Detailed user functional specifications are published separately in the ECB's professional-use documents section.

    Widened on the access date, because the previous applicability named only T2 and central liquidity management and an interview question was written from it that enumerated all four. The enumeration is corroborated from independent web-search excerpts including the Eurosystem's own T2 page and its TARGET Services annual report; the publisher's index page timed out on the day, so nothing is quoted from it directly.

    The fourth service went live during the life of this registry rather than existing all along, which is why an older three-service description is a stale fact rather than a wrong one. Cite the live page before relying on the membership of the family.

    The index page still does not publish the ECMS go-live date. That date is on ecb-ecms-launch-press-2025.

  3. Scheme-specific rule

    The Return and Change Codes of the Nacha Operating Rules ↗ — Nacha · Return and change reason codes, and the return records reconciled back to the originals

    The reference for exception handling on the automated clearing house network under the Nacha Operating Rules. It covers three families of code.

    Return reason codes are the R-codes a receiving institution uses when it cannot or will not post an entry. Notification of Change codes correct account data on an entry that did post. The dishonoured and contested-dishonoured return codes each carry a timeframe of their own. · Checked 2026-08-23

    A correction to the access note. The previous note said a full-page fetch was unavailable. Nacha's site opens without difficulty; the document is behind a login.

    Re-tested on the access date. The URL answers HTTP 200 and redirects to my.nacha.org, which serves a sign-in form and the sentence that credentials for the Rules Online site differ from those for the Nacha website. The page reached is 31,895 bytes of login form, not the code reference. No credentials were used and none should be.

    That is a permanent condition rather than a transient one, so the next person need not retry this address. The code list is a member product. Individual code numbers and their windows change between rule releases and are still not transcribed here.

  4. Official requirement

    Swift Standards MT (annual standards releases) ↗ — Swift · Category 9 — the statement and confirmation messages a bank reconciles an account against

    Defines the MT message standards (including MT101, MT103, MT202/202 COV, and the MT9xx statement messages) exchanged over the Swift FIN network, maintained through annual standards releases. · Checked 2026-11-12

    Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.

    Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.

    Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.

  5. Official requirement

    Principles for financial market infrastructures ↗ — CPMI and IOSCO (Bank for International Settlements) · Settlement finality, and the settlement obligations a participant of a financial market infrastructure carries

    PFMI international standards;V40 actual named-section review supports counterparty credit risk,liquidity risk,obligation-specific settlement/finality,conditional default safeguards and queue/liquidity-saving design. Applicability/implementation follows the actual jurisdiction and system;not every system's law or private rule is certified. Earlier search-only operational-risk review remains a separate historical scope. · Checked 2026-11-06

    V40 actual primary PDF read at https://www.bis.org/publications/principles-financial-market-infrastructures.pdf :complete3.4.1–3.4.7,3.8.1–3.8.8 and AnnexD payment designs through liquidity-saving discussion (printed38–40,64–66,148–149). Cover/title verified;not full188page reading. Specific credit/liquidity/finality/design statements here use these sections. Earlier registry scope/history:Published by the CPSS (now CPMI) and IOSCO; contains 24 principles plus responsibilities for authorities. This site uses it only for high-level concepts such as settlement finality.

  6. Market practiceSuperseded — see Glossary of payments and market infrastructure terminologyMarch 2003 edition

    A glossary of terms used in payments and settlement systems ↗ — CPSS (now CPMI), Bank for International Settlements · Clearing and settlement as separate steps, and the net settlement position a participant settles

    The previous edition of the Committee's glossary, and still the published definition of every term the live glossary dropped. Cited for gridlock, queuing, day of value, cheque, credit transfer, direct debit, nostro, vostro, Herstatt risk and settlement institution. The Bank for International Settlements points readers here for exactly that, saying additional terms not included in the main glossary can be found in the previous version.

    Also cited for terms whose definition is unchanged between the editions, where a claim rests on the substance rather than on the wording. Caps, settlement risk, clearing, net settlement system, straight through processing, large-value payment system and the credit, liquidity and principal risk entries all read the same in both.

    Not a source for a definition that moved. Netting, real-time gross settlement, settlement asset and final settlement are worded differently in the live glossary. A current claim about any of them belongs to bis-cpmi-glossary-live. Nor is this a source for central bank money, commercial bank money or liquidity saving features, none of which is a headword in this edition. · Checked 2026-08-25

    Superseded for currency, not for coverage, and that distinction is the reason this entry stays. The live glossary at bis.org/cpmi/publ/d00b.htm is the current text. This edition remains the only published CPMI definition of ten headwords the live glossary does not carry.

    Both editions were downloaded and compared on the access date. The 2003 PDF is 346,977 bytes; the generated PDF of the live glossary is 197,553 bytes. Four definitions this site teaches had moved. Six passages quoted the 2003 wording of netting in prose while attributing it to the CPMI glossary, and those now say which edition they are quoting.

    Checks that returned nothing, recorded so they are not repeated. Singleness of money, payment token, electronic wallet and book transfer are headwords in neither edition. A citation for any of those was pointing at a document that does not contain the term.

  7. Regulatory guidance

    Comptroller's Handbook — Due from Banks ↗ — Office of the Comptroller of the Currency (OCC), U.S. Department of the Treasury · The expectation that unreconciled items which are large, unusual or long outstanding are investigated

    The OCC examination booklet covering the deposits a bank keeps at other banks to move funds — due-from-bank accounts, which are what this site teaches as nostros. Cited for the supervisory expectation that those accounts and the temporary accounts feeding them are reconciled, and that unreconciled items which are large, unusual or long outstanding are investigated and, where appropriate, written off. · Checked 2026-08-04

    Search excerpts only, page not opened. Cited for the shape of the expectation rather than any quoted threshold or version, and it is US supervisory guidance — the reconciliation principle is general, the authority is not. No booklet version is named here for the same reason.

    Link checked again by web search on 2026-10-11. The booklet is on occ.gov at the address above. It is labelled version 1.0, with a narrative dated March 1990 and procedures dated March 1998. A March 2025 note removes reference to reputation risk. The page and the PDF were still not opened.

  8. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: Bank Alfa's unsettled payment and the merchant's late submission are teaching cases, and both are drawn as one participant, one cycle and one account. The five break shapes are this site's grouping of causes rather than a taxonomy any scheme publishes, and break ageing is described as a shape — bucket boundaries, escalation thresholds and ownership differ between institutions and are not stated. No settlement report layout is shown, because the ones this topic depends on are either undocumented publicly or set in rules this site does not reproduce.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

  9. Official requirement

    Principles for financial market infrastructures ↗ — CPMI and IOSCO (Bank for International Settlements) · Principle 8: defined final settlement; report accuracy distinguished by editorial evidence-control reasoning

    PFMI international standards;V40 actual named-section review supports counterparty credit risk,liquidity risk,obligation-specific settlement/finality,conditional default safeguards and queue/liquidity-saving design. Applicability/implementation follows the actual jurisdiction and system;not every system's law or private rule is certified. Earlier search-only operational-risk review remains a separate historical scope. · Checked 2026-11-06

    V40 actual primary PDF read at https://www.bis.org/publications/principles-financial-market-infrastructures.pdf :complete3.4.1–3.4.7,3.8.1–3.8.8 and AnnexD payment designs through liquidity-saving discussion (printed38–40,64–66,148–149). Cover/title verified;not full188page reading. Specific credit/liquidity/finality/design statements here use these sections. Earlier registry scope/history:Published by the CPSS (now CPMI) and IOSCO; contains 24 principles plus responsibilities for authorities. This site uses it only for high-level concepts such as settlement finality.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.