Nina asks how the team will know testing of sharing is finished. A train story shows how Mei writes conditions for starting, pausing and stopping, so the team stops arguing at the end.

Understand the full idea, step by step

A train leaves when the doors are shut and the signal is green. It stops if a signal fails. It has arrived when it reaches the platform.

Nina, the Daily List product owner, asks a fair question: how will we know when testing of sharing is finished? Mei answers with three short lists.

Evidence & review

REVIEWED 2026-10-18

The date on this lesson is when it went up on Payments Signal, not when its material was written — most of these were brought across from an earlier catalogue in a single run, which is why so many of them share a date. What the lesson says about the world is dated by the review above and by the sources below it.

Entry criteria, exit criteria and suspension criteria as taught in this academy. The people and the Daily List app are invented.

What this brief simplifies: Fiction labelled SYNTHETIC / TRAINING ONLY. Sources were seen only as search excerpts. The train picture is a teaching aid.

Sources for this brief — 5 sources
  1. Market practice

    ISTQB Certified Tester Foundation Level Syllabus v4.0.1 ↗ — International Software Testing Qualifications Board · Section 5.1.3, entry criteria and exit criteria, and their link to the Definition of Done in agile work (confirmed against the syllabus, read in full text from a mirror copy of the publisher PDF, v4.0.1, 15 September 2024)

    The examinable statement of what a foundation-level tester is expected to know: six chapters, 64 learning objectives, each tagged K1 Remember, K2 Understand or K3 Apply, plus the test-design techniques the qualification names and groups as black-box, white-box and experience-based.

    Used here for the test-craft questions a Payment Quality Assurance Analyst and a Production Support Analyst are asked. It is cited for what the syllabus says a tester must be able to do, never as a rule about how payments work. · Checked 2026-11-07

    v4.0.1 is dated 15 September 2024 and is a list of corrections to v4.0 (21 April 2023) that reworded six learning objectives — not a cosmetic reissue. 78 pages.

    Two traps this entry exists to stop. v4.0.2 is the German edition (1 March 2025, 94 pages), so sorting by version number reaches the wrong document. And the widely-repeated per-chapter question allocation "8 / 5 / 4 / 11 / 9 / 3" is wrong: it is 8 / 6 / 4 / 11 / 9 / 2, derived from three official sample-exam answer keys and confirmed against the Exam Structure Tables.

    The single most consequential detail for a question bank: white-box coverage — statement and branch — is K2 "Explain", not K3 "Apply" (FL-4.3.1, FL-4.3.2, FL-4.3.3), and MC/DC, path and condition coverage are declared out of scope in §4.3. A question asking a candidate to compute branch coverage is testing something this syllabus does not.

    Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.

    Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.

    Read from two independent PDF-to-markdown conversions mirrored on raw.githubusercontent.com. They are treated as faithful because they were produced by unrelated parties with different tooling, agree on the full 64-item objective set including wording, and reproduce the same internal inconsistency present in the source PDF. Chapter 1 reads "testware that supports" where Appendix B reads "that support". A conversion artefact does not replicate across two toolchains.

    The licence permits attributed non-commercial extracts and use as the basis for articles. Whether a site that sells a pass may rely on that is an owner's decision, not this entry's.

    7 November 2026 review: actual publisher PDF 4.0.1, 15 September 2024, 78 pages, front matter/copyright and relevant numbered operative sections 0.5–0.10 and chapters 1–6 compared with CTFLpractice lessons. Earlier mirror/search descriptions are historical access records. TheK2 white-box objectives require explanation; the source does not justify a categorical ban on small numeric illustrations that support explanation. Later Exam Rules 1.2§4.1.4 usesK2 for keyword definitions, while syllabus§0.5 usesK1; keep dated scopes distinct. No copied questions or figure assets.

  2. Market practice

    The Scrum Guide — The Definitive Guide to Scrum: The Rules of the Game (November 2020) ↗ — Ken Schwaber and Jeff Sutherland · The Definition of Done is a formal description of the state of the Increment when it meets the quality measures required for the product (search excerpt, page not opened)

    The framework definition itself: three accountabilities, five events, three artifacts with their commitments, and the five Scrum values. Thirteen pages, about 3,956 words, CC BY-SA 4.0.

    Used here for the agile-delivery questions a Payments Business Analyst, a Payment Quality Assurance Analyst and a Payments Product Manager are asked — and, as often, for what the Guide does not say. Additional actual read scope7November2026: Official Scrum Guide November2020, actual ProductBacklog/refinement, SprintPlanning and SprintReview sections read7November2026: emergent ordered work, ongoing refinement, Done-within-Sprint readiness, possible planning refinement, Developer sizing/selection and feedback. No mandatory1–2Sprint buffer, user-story format or universal all-questions-answered rule; no whole-guide read claimed in this pass. · Checked 2026-08-18

    Still current in August 2026. There is no 2025 or 2026 revision of the Guide.

    The confusable document is a rename. "Scrum Guide Expansion Pack" (v2025.6) became "Scrum Guide Expanded" (v2026.1, 18 January 2026), published at scrumexpansion.org by Jocham, Coleman and Sutherland. Same URL path, different name, and Jeff Sutherland co-authors both it and the Guide — which is exactly the hook that makes wrong credit plausible. It is not a version of the Scrum Guide.

    Nine terms interview answers routinely attribute to Scrum appear zero times in the Guide: story points, velocity, Definition of Ready, sprint zero, user stories, acceptance criteria, grooming, T-shirt sizing, planning poker. So do "estimate" and "estimation".

    Two that are usually said to be absent and are present, which is why this paragraph exists: burn-down charts are named once and subordinated — "Various practices exist to forecast progress, like burn-downs, burn-ups, or cumulative flows. While proven useful, these do not replace the importance of empiricism" — and backlog refinement is defined as "an ongoing activity". What is absent is refinement as an event, and the absent word is "grooming".

    The Guide does require Product Backlog items to acquire a size, and puts sizing on the Developers, while naming no unit, scale or technique. It says "accountabilities", not "roles"; five events, not four; never "ceremony".

    Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.

    Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.

    Read in full from three independent mirrors that agree byte-for-byte on section structure, on the CC BY-SA 4.0 footer, on word count to within four words, and on all sixteen term-frequency counts above. Edition confirmed as 2020 specifically by zero occurrences of "Development Team" and thirteen of "Product Goal". Actual selected sections above read; prior metadata and wider source-use notes preserved. No full member book or adjacent legacy scheduling rule is implied.

  3. Market practice

    Definition of Done vs. Definition of Ready (Scrum Alliance) ↗ — Scrum Alliance · A Definition of Done is a shared checklist for finished work; a Definition of Ready is a checklist for work that may start (search excerpt, page not opened)

    Article saying the Definition of Done is a shared understanding of what complete means and is a core part of Scrum, while the Definition of Ready is an optional tool that can cause delay if it grows heavy. Practitioner guidance. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  4. Market practice

    Sample test plan (ReqTest) ↗ — ReqTest · Suspension criteria cover situations that stop testing or make it pointless; resumption criteria apply once the cause is fixed (search excerpt, page not opened)

    Describes common test plan sections, including approach and suspension and resumption criteria. Practitioner guidance, not a standard. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  5. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

Learn this properly

START HEREEntry and exit criteriaAgree in advance what must be true before testing starts, when to pause, and what must be true before it is called finished. It ends arguments.Opens at L0 Explain simply · about 12 min

Related briefs

Mei reads the model like a map

Mei is asked which improvement model to use. A trail map helps her see what to check in a model, the difference between staged and continuous forms, and what every model assumes.

READ BRIEF

Mei reads the dashboard with a goal

Mei wants measures that answer her questions. A car dashboard helps her see why she states the goal first, then the questions, then the metrics and their counting rules.

READ BRIEF