Software testing terms starting with U.
Plain-language definitions with every acronym expanded. Each term's page carries the source it rests on.
U
- UAT coordinator
The person who organises user acceptance testing, helps the users and collects their results.
- UAT feedback log
One shared list where users note what they found, with the build and step it came from.
- UAT script
A short, plain list of steps and expected results that a business user follows in acceptance testing.
- Underfitting
A model that is too simple to learn the pattern, so it scores badly on old and new examples alike.
- Underwriting rule
A rule the insurer uses to decide whether to offer cover and at what price.
- Undo by place
The way to undo depends on where the change is: in the working folder, in the staging area, or already in history.
- unexpected result cause
A question that gives a test that failed or passed when it should not and asks where the cause might lie.
- Unicode
A standard that gives encoded characters from many writing systems a code.
- UNION and UNION ALL
UNION joins two lists and removes repeated rows. UNION ALL joins them and keeps every row.
- Union count trap
A UNION ALL can count a row twice. A UNION can hide that two rows were the same.
- Unique token for a test message
A made-up value in a message, such as in the subject, so a test finds its own message.
- Unmatched item
A row on one side of a match that has no partner on the other side.
- Unreachable code
Code that no path through the program can ever run.
- Unsaid requirement
Something users or the team expect that no one wrote down, so a tool working only from the written text cannot see it.
- Unscripted testing
Testing without written steps, decided by the tester as they go.
- Unstable build
A Jenkins result that can be set by published test failures; it differs from an uncaught command failure.
- Unsupported claim
A statement in an assistant's output that no real source you hold backs up, such as an invented field or feature.
- Untraced test
A test with no recorded link to its relevant basis or objective.
- Up-to-date branch setting
An option that asks the pull request branch to include the newest target-branch code before it can merge.
- UPDATE and DELETE
UPDATE changes values in existing rows. DELETE removes rows. Both need a WHERE to say which rows.
- Upgrade run
A full run of the test suite on a separate branch after changing the Playwright version.
- Upgrade test
A test that moves from an older version to a newer one with data in place.
- Upload on failure
Setting an upload step to run even when earlier steps fail, so the evidence of a failed run is saved.
- Upload test file
A small, safe file kept with the tests, used only to try an upload.
- Upstream branch
A tracking branch association used by Git operations, subject to flags and configuration.
- URL
The full web address of a page or resource.
- URL path
The URL component before any query or fragment, interpreted according to the service’s rules.
- Usability
How easily and pleasantly people can use the software for their goals.
- usability evaluation methods
Five ways to test usability in acceptance testing: checklists, expert reviews, think-aloud walkthroughs, biometric recording and log analysis.
- usability finding
A result of a usability evaluation that names an important problem, a good feature or a useful idea, with a class and a severity.
- Usability heuristic
A rule of thumb for judging how easy an interface is to use.
- Usability readout
A short talk or note that explains study results to people who did not watch: the answer first, the top problems with proof, then a decision.
- usability review
A check of a product by usability experts against set criteria, from an informal read to a formal inspection.
- Usability risk
A way a screen or flow could stop people reaching their goal, rated by harm, how often and how easy recovery is.
- usability risk family
The groups of risk the syllabus lists: usability, user experience, accessibility and project risks, which split into organisational, technical and supplier risks.
- usability test lab
Two or more rooms set up for usability tests: a test room for the participant and an observation room for observers.
- usability test plan
A short document, one or two pages, that states the goals, users, roles, method, schedule, cost, place and reporting of a usability test.
- usability test report
The document that shares what a usability test found: a one-page summary first, then ranked findings and how the test was run.
- usability test session
A session where future users or their representatives try set tasks to see if they can finish them well.
- usability trio
The three measures of usability: effectiveness, efficiency and satisfaction.
- Usage data
Counts of what real users use, gathered from the live product.
- Usage map
A list of the features in an app that use a given library.
- Use case
A description of how a person reaches a goal with the software, step by step.
- USE method
A checklist that reads each resource's utilization, saturation and errors.
- Use options
The settings in the config's use block that apply to every test, such as the base address and the trace setting.
- User controllability
How well a person can step in on time to steer or stop a system, for example with an off switch or an undo.
- User error protection
Features that stop people making or repeating mistakes.
- user experience pillars
The four things studied to set user experience requirements: users, tasks, context and competitors.
- User experience risk
A way a product could leave people feeling unsure, annoyed or unsafe, even when the tasks work.
- user satisfaction questionnaire
A set of rating and feedback questions that measures how satisfied users are, such as a standard inventory for software.
- user-based objective
A performance test aim about what end users and the business need, such as a screen that opens fast, as against a technical aim.
- UTC
The common world time standard that other zones are measured against.
- UX requirements analysis
A step that finds what users need, by studying the users, their tasks, the setting and rival products.