GLOBAL PAYMENTS KNOWLEDGEISO 20022 / SWIFT / SEPA / MT / MX
ANNOTATED SAMPLE

MT950 statement message

A fictional interbank account statement.

Illustrative, non-production example. Values are fictional and the message is not validated for any specific network, scheme, or implementation guide.

EVIDENCE AT ARM'S REACH

DOWNLOAD AND GOVERNING SOURCES

Download the canonical fictional sample, then open the exact official definition and profile needed for implementation testing.

An XSD checks XML structure. A usage guideline adds profile rules, conditional fields, code restrictions, and business controls. XSD-valid does not mean scheme-compliant.

Usage guidelineSwift MTcurrent

Swift Standards MT release material

The annual MT standard and release information. Full field specifications may require an authenticated Swift account.

Owner
Swift
Checked
2026-07-18
Access
Login required · Swift login and the organisation's permissions may be required.
OPEN OFFICIAL SOURCE
Teaching sampleScheme-neutral teachingcurrent

MT950 statement message — raw FIN

A fictional interbank account statement. SYNTHETIC / TRAINING ONLY; illustrative unvalidated.

Owner
Payments Signal
Checked
2026-07-19
Integrity
crc32:1f1aadc4
Access
Payments Signal download · Original fictional teaching sample; no login required.
DOWNLOAD
Lifecycle packScheme-neutral teachingcurrent

MT legacy and migration lifecycle — ZIP pack

Initiation, serial and cover context, cancellation and correspondence, advices, and statements.

Owner
Payments Signal
Checked
2026-07-19
Integrity
crc32:8b3a20e4
Access
Payments Signal download · Original fictional teaching pack; no login required.
DOWNLOAD
MappingCBPR+current

MT950 → camt.053 implementation mapping

Field correspondence, transformation treatment, and data-loss notes for Interbank statement migration to a structured bank-to-customer statement.

Owner
Payments Signal
Checked
2026-07-19
Integrity
crc32:5c7c7b44
Access
Payments Signal download · Original, source-backed teaching asset; no login required.
DOWNLOAD
Field matrixBase ISO 20022current

MT950 field matrix

Curated field requirements, contexts, operational meaning, and implementation cautions.

Owner
Payments Signal
Checked
2026-07-19
Integrity
crc32:ced8839a
Access
Payments Signal download · Original, source-backed teaching asset; no login required.
DOWNLOAD
MT950
{1:F01DEMOGB2LAXXX0000000000}
{2:I950DEMODEFFXXXXN}
{4:




:61:2607180718D1250,00NTRFDEMOE2E001//DEMOREF001

-}

EVERY ANNOTATED FIELD

:20: Transaction referencemandatory

Reference assigned to the statement message.

:25: Account identificationmandatory

Account covered by the statement.

:28C: Statement and sequence numbermandatory

Number and page sequence of the statement.

:60F: Opening balancemandatory

Booked balance before the reported entries.

:61: Statement lineoptional

One booked debit or credit with date, amount, and references.

:62F: Closing balancemandatory

Booked balance after the reported entries.

FULL MT950 REFERENCE →

COMMUNITY SIGNAL

Discuss this learning page

Share an operational observation or ask a concrete payments question. Your name and message are public; your email remains private.

NEXT QUESTION REVIEWMonday, 27 Jul, 8:00 amMonday answer runs use source-supported educational material. Some questions may need owner review.
WHAT ARE YOU SHARING?

Public discussion

LOADING

Loading the discussion…