TOPIC 25/2713 MINNOT STARTED

When a payment needs investigating

Four different questions have always shared one answer message — which is exactly why the investigation model is being replaced.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy for a payment investigation: a parcel with no name on it. A parcel arrives and there is no name on it. You cannot deliver it and you cannot throw it away, so you write to the sender: who is this for?

Other letters you might write about the same parcel: it never arrived. Can you change the delivery date? Please cancel it. Four different questions.

Now imagine the sender always replies on the same form, and the form does not say which question it is answering. You would have to keep your own note of what you asked, or the reply is hard to read.

That is genuinely how payments investigations have worked. Maya's bank receives money it cannot apply, because the account reference means nothing. It opens a case. And the answer that eventually comes back is the same message which answers a cancellation, a claim, and a .

Why does that matter enough to rebuild? Because a system whose answers only make sense next to your own notes cannot be counted, compared or automated — and the last rung of this topic is about exactly that. (SYNTHETIC / TRAINING ONLY — every person and firm named in this topic is invented.)

PLAIN WORDS · 1 in this section
rung
one step of a ladder, or a level in rank

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the payment.

THE REAL JOB Banks open a case to ask what became of a payment or to have it repaired, and one shared answer message comes back.

  1. A payment cannot be applied, or is missing
  2. Pick the request that matches what is wrong
  3. The request carries an assignment and a case identifier
  4. The assignment is created again at each relay; the case identifier survives
  5. One answer, a camt.029, comes back
  6. Read the answer for what it decided
Four requests, one answer, one thread

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
A parcel with no name on itA payment or entry the bank cannot apply
A letter asking who the parcel is forcamt.026, unable to apply
A letter saying it never arrivedcamt.027, claim of non-receipt
A letter about the label detail the parcel lackedcamt.028, a message about additional information the payment did not carry
A request to change the delivery datecamt.087, a request to modify, such as a corrected value date
A letter saying please cancel itA cancellation request, answered by the same camt.029
The sender's one reply formcamt.029, the one answer to all four
A reference number copied onto every letter and onto the reply formThe case identifier, the one reference that survives every hop
Who writes to whom on the formThe assignment, naming who asks and who answers

WHERE THIS PICTURE STOPS

  • The parcel story counts a cancel letter among its four questions. The four classic requests are camt.026, the unable-to-apply request, and camt.027, the claim of non-receipt. The others are camt.028, the additional-information message, and camt.087, the request to modify. Cancellation is a separate request that the same answer message, camt.029, also answers.
  • A reply to a parcel letter is only a note. In a payment the answer settles nothing. A case can close with the money still in suspense, a holding account for money the bank cannot yet place. If funds move, a separate payment carries them.
  • The parcel fits the unable-to-apply request, camt.026, closely: the bank holds something it cannot apply. The other letters are about a parcel the bank may not hold at all. The picture has no letter for the additional-information message, camt.028, so the letter about missing label detail is added here. This topic describes camt.028 as asking for additional information. Its message record says it supplies additional or corrected information. Search excerpts of the ISO description say this is often in answer to a camt.026. The two readings differ, so check the message definition before relying on either.
  • In the opening picture you keep your own note of what you asked. Two things are added here. A reference number copied onto every letter stands for the case identifier. A line on the form for who writes to whom stands for the assignment. A parcel keeps one sender and one address. A payment case is passed on, or relayed, between different pairs of banks. The assignment is created again at each relay, so the case identifier lets the messages be read as one investigation.
  • The picture's reply form never says which question it answers. The real answer message does not either, which is the complaint the topic ends on. The newer camt.110 request carries a coded investigation type, and the camt.111 response carries a coded reason. That makes an open case countable. Structure does not make anyone reply sooner, and a camt.111 coded NARR, meaning see the free text, is still a prose answer.

HOOK

Name what is wrong first; the request follows.

TELL A FRIEND

Banks open a case with one of four requests when a payment cannot be applied or goes missing, and one shared message answers them. Choose the request by what is wrong, and keep the case identifier, because it survives every hop.

OFTEN MIXED UP WITH Reject or return in correspondent banking. This topic asks what happened to a payment or how to repair it. Reject or return asks one question: has the money moved yet? A reject stops a payment before settlement, and a return sends settled money back as a new pacs.004 payment. A cancellation request is answered by the same camt.029 answer.

CURRENT AS CHECKED

3 FIGURES
  • Swift Case Management: Case Orchestrator (investigations) and Stop and Recall (cancellations), for institutions on the Swift network

    Swift's public pages give different dates for receiving , the investigation request. On 5 November 2026 its page still says November 2026. Its translation FAQ explicitly says June 2027 for all banks to receive a camt.110 with an embedded Message Type (MT) 199. Both pages were opened.

    Swift's release announcement, updated 21 September 2026 and opened again on 5 November, schedules the deferred 2026 package for 12 June 2027. Its scope includes exceptions and investigations messages. That package date does not by itself settle every service obligation. The translation FAQ supplies the explicit June 2027 receive wording.

    The Case Management page gives November 2027 for full investigation exchange through Case Management and cancellation exchange through , over FINplus. The earlier November 2026 receive date must not be taught as an uncontested current mandate. Confirm the effective obligation with Swift before setting a production deadline. A bank's own readiness schedule does not set the network rule.

    CHECKED 2026-11-05RECHECK BY 2027-01-05

    Sources & standards — 3 sources
    1. Scheme-specific rule

      Swift Case Management ↗ — Swift · Live page opened 5 November 2026: November 2026 receive wording; November 2027 full exchange

      Swift's product page for Case Management. It says investigation requests and responses go through Case Management over FINplus only, as camt.110 investigation request and camt.111 investigation response, from the mandate date. It says payment cancellation messages move to Stop and Recall over FINplus only. · Checked 2026-11-05

      Public Swift Case Management page opened on 5 November 2026. Its Other E&I timeline still states November 2026 for camt.110 receive and November 2027 for full camt.110/camt.111 exchange. This conflicts with the live translation FAQ, which explicitly says June 2027 for receiving camt.110. The September 2026 release update places the deferred E&I message package on 12 June 2027. Do not present the product-page date as an uncontested current mandate.

    2. Scheme-specific rule

      ISO 20022 to older message type translation — frequently asked questions ↗ — Swift · Live public FAQ opened 5 November 2026: explicit June 2027 camt.110 receive wording and non-participant MT199 workflow

      Swift's translation FAQ. It says the camt.110 investigation request should keep its in-flow translation for banks that are not on Case Management. Those banks need the embedded Message Type (MT) 199 to carry on the investigation over the older Swift messaging service. They cannot reply with a camt.111 investigation response. · Checked 2026-11-05

      Public Swift FAQ opened on 5 November 2026 at https://www.swift.com/de/node/308151. It explicitly gives June 2027 for receiving camt.110 with embedded MT199. The live Case Management product page still states November 2026. Preserve this official-source conflict and confirm the effective service obligation with Swift. The FAQ also distinguishes in-flow translation, Transaction Manager, local software and sender contingency processing. Full service documentation and usage guidelines were not opened.

    3. Official requirement

      Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · 21 September 2026 update, opened 5 November: deferred E&I message package 12 June 2027; separate address timetable

      Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

      Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

      Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

  • Swift cross-border payments — receiving the new investigation request message and removing the legacy investigation messages

    Swift's roadmap for exceptions and investigations on cross-border payments, under Cross-Border Payments and Reporting Plus (), set November 2026 as the date by which every institution must be able to receive a investigation request through Swift's case-handling service (Case Management). That request carries an in-flow translation, which embeds a free-format message, the MT199, inside the camt.110 so that a bank still using the older Message Type (MT) format can answer. Swift's FAQ, as archived on 22 August 2026 and before the deferral below, set November 2027 for removing the formatted MT cancellation and investigation messages.

    Swift then deferred part of its 2026 release. Its September 2026 roadmap edition says the exceptions and investigations changes, including the mandate to receive a camt.110, move to the deferred release. The same edition warns that its dates may be out of date until the scope of that release and of 2027 is confirmed. Swift's Standards Releases page dates that deferred release 12 June 2027. Whether the deferral also moved the November 2027 removal date was not established. Until Swift confirms the new scope, treat the November 2026 receive date as unconfirmed.

    The roadmap wordings were seen only as search excerpts, and the pages were not opened.

    CHECKED 2026-10-04RECHECK BY 2027-01-05

    Sources & standards — 3 sources
    1. Scheme-specific rule

      ISO 20022: Exceptions and Investigations — frequently asked questions ↗ — Swift · Receiving a camt.110 with an embedded MT 199 from November 2026, and removal of the formatted MT cancellation and investigation messages from November 2027; read from the Internet Archive snapshot of 22 August 2026, before the deferral

      Swift's own FAQ on the exceptions-and-investigations migration, cited for four statements it makes in plain words.

      Which messages replace which: camt.110 as the investigation request and camt.111 as the investigation response, against the MT n95 queries and MT n96 answers, with camt.056 and camt.029 taking the cancellations.

      That camt.110 and camt.111 can only be exchanged through the Case Orchestrator and cannot be exchanged bilaterally, which is the difference between them and every FIN message they replace.

      That from November 2026 every institution must be able to receive a camt.110 carrying an in-flow translation with an embedded MT 199 inside it, and that in-flow translation for non-instruction messages remains free of charge.

      And the sentence the free-format decision rests on. From November 2027 the formatted MT messages for cancellations and for exceptions and investigations are removed, while "Free format messages (MT n99) will still be available but should not be used for E&I purposes". · Checked 2026-08-23

      swift.com does not respond — requests to it time out rather than returning a status. So the page was read through the Internet Archive's copy of the publisher's own URL, snapshot 20260822215634, HTTP 200, 163,796 bytes, and the text extracted from that HTML. The words are the publisher's; only the route to them is the archive's.

      It is a service FAQ, not a message definition. Its scope is the cross-border payment categories, so it names the Category 1 and Category 2 members — MT 195/198/295/298 and MT 199/299 — and does not mention the Category 9 members at all. The Category 9 pairings are sourced from Swift's CBPR+ coexistence deck instead. It does not mention admi.024.

      Every presence flag and element address on the tables it supports is read from the published schema rather than from here.

      Undated as a page. Its milestones are dated and will move; recheck the live page before using one in delivery planning.

    2. Scheme-specific ruleJune 2026 edition read in full; September 2026 edition seen as search excerpts only

      CBPR+ roadmap beyond November 2025 ↗ — Swift · September 2026 edition: exceptions and investigations changes and the mandate to receive camt.110 move to the deferred SR2026 release, and the dates may be out of date; search excerpt, page not opened

      Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

      Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

      Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

      Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

      The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

      Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

      The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

    3. Scheme-specific rule

      Swift Standards MT (annual standards releases) ↗ — Swift · Standards Releases page: 12 June 2027 for the deferred SR 2026 release, which includes exceptions and investigations messages; search excerpt, page not opened

      Defines the MT message standards (including MT101, MT103, MT202/202 COV, and the MT9xx statement messages) exchanged over the Swift FIN network, maintained through annual standards releases. · Checked 2026-11-12

      Full field-level specifications live in the Swift Knowledge Centre User Handbook behind a swift.com login. Coexistence for in-scope FI-to-FI payment instructions ended on 22 November 2025, but treatment differs by MT: some instructions are NAKed and selected messages can enter temporary, chargeable contingency conversion. Reporting, initiation, investigations and correspondence follow separate roadmaps.

      Re-checked on 2026-10-04 by web search for the schedule of Standards Release 2026. Only search excerpts of the Standards Releases page were seen; the page was not opened. They said the deferred part of the release, which holds MT messages outside category 1, ISO 20022 securities and funds messages, tracker messages and exceptions and investigations messages, now has a date of 12 June 2027. They said the first target was the first quarter of 2027, and that the later date follows industry feedback about other change work, including the European move to T+1 settlement. An audit note in docs/research dated 29 September 2026 recorded the same date from the same page.

      Re-checked 12 November 2026 via Swift Standards Releases schedule: SR2025 remains the in-force annual MT release pending the deferred SR2026 package.

  • PMPG market practice for cross-border payment exceptions and investigations; applies only where no different prior agreement exists; written for the MT-era message set

    The (PMPG) exceptions and investigations guideline asks the bank holding an open case to send the a status update. For fraud and compliance cases that is daily. For other inquiries it is every second business day if the payment is above USD 100,000 or equivalent, and every fifth business day for all other payments.

    CHECKED 2026-10-11RECHECK BY 2027-04-11

    Sources & standards — 1 source
    1. Scheme-specific rule

      Payments Market Practice Group (PMPG) market practice guidelines for exceptions and investigations ↗ — Swift / Payments Market Practice Group · Search excerpt, page not opened: PMPG E&I #8 status update intervals; Version 1.0, November 2012 per search excerpt, possibly superseded

      Cited for one idea: the status-update rhythm the guideline asks of the bank holding an open exceptions or investigations case (E&I #8). It is market practice agreed by a group, not a rule a scheme owner imposes, and it applies only where no different prior agreement exists. · Checked 2026-10-11

      Verification boundary. The PDF was not opened. The rhythm was recovered from two WebSearch results restricted to swift.com on 2026-10-11 and is cited at search-excerpt strength. A later search result described it as Version 1.0 from November 2012, a date taken from search excerpts only and possibly superseded. The guideline is written for the MT-era message set; the search did not confirm a camt.110 or camt.111 equivalent.

SEE THE PAYMENT MOVE

PICTURE THE JOURNEY

A school team's tour fee, two travel offices and a tour associationOpen to read the picture, how it matches the payment and where it stops.

PICTURE IT

A school team's tour fee, two travel offices and a tour association

Picture a school team that must pay a hostel in another country for a tour. The team's organiser and the hostel's record keeper never deal with each other. Each uses a local travel office. Both offices keep a balance with one tour association.

The organiser gives the team's travel office an order form. The form has a printed box for each name, each address and each note about the invoice. The office checks the form and checks every name against a list of people and groups it may not pay. If all is well, it takes the fee from the team's fund. It stamps a reference number on a copy of the form and clips on a cover sheet. The sheet says who sent the copy, who gets it and which kind of form it is. The fee has left the team, but the hostel is not yet paid.

A shared courier service takes the copy. The courier checks that the boxes follow the standard form guide, keeps the copy safe and delivers it. It never opens a balance book and never pays anyone.

The tour association reads the copy and checks it again for itself. It checks the names and checks that the team's travel office has enough in its balance. Then it writes in its own book: a minus on the team office's balance and a plus on the hostel office's balance. That entry is the payment between the two offices. The association passes the copy on with the same reference number. The hostel's travel office checks the names once more and adds the fee to the hostel's account. The hostel's record keeper matches the fee to the invoice using the notes in the printed boxes. If the offices agreed to it, a short note travels back to say the account was credited.

Seven other turns are possible. If the association cannot read a needed box, it sends the form back before it writes anything, and the team's office puts the fee back. If the form says costs are shared, the association keeps a small handling fee, so the hostel gets a little less. If no news comes, the team's office asks where the form is, quoting the reference number. If the hostel's account is closed, the fee comes home as a second, separate entry. If a name looks like one on the list, the association holds the form and asks the team's office for details until a person decides. If an address was cut off mid-word in copying from an older form, a clerk at the association repairs it. If the hostel's name does not match the account holder, the hostel's office parks the fee in a waiting tray and asks the team's office. (SYNTHETIC / TRAINING ONLY: the team, the hostel and the offices are invented.)

THE REAL JOB It carries a company's payment to a supplier at a bank abroad, with checks at each bank and one reference that tracks it.

HOW THE PICTURE MAPS

How each part of the picture matches the payment
In the pictureIn the payment
The organiser hands over an order form with a printed box for each factThe debtor sends Bank Alfa a payment order, pain.001, with structured data
The team's office checks form and names, then takes the fee from the fundBank Alfa validates, screens, then debits the debtor's accountWho: Bank Alfa
A reference number is stamped on the copy and never changedThe unique end-to-end transaction reference (UETR) stays the same at every bank
A cover sheet says who sent it, who gets it and which form it isThe Business Application Header (BAH) names sender, receiver and message type
The copy of the order form that travels between officesThe bank-to-bank message pacs.008, which states the amount but carries no money
The courier checks the boxes against the form guide, delivers, and pays nobodySwift FINplus validates against the usage guideline and delivers; nothing settles there
The tour association checks the copy again for itself, names includedMeridian Bank screens and validates for itself; Bank Alfa's pass does not bind itWho: Meridian Bank
A minus on the team office's balance and a plus on the hostel office'sBook transfer: Meridian Bank debits Bank Alfa's account and credits Cassia Bank'sWho: Meridian Bank
The same copy and reference number go on to the hostel's officeMeridian Bank forwards the payment message pacs.008 with the same reference to Cassia BankWho: Meridian Bank
The hostel's office checks the names once more, then adds the feeCassia Bank validates and screens, then credits its customer's accountWho: Cassia Bank
The record keeper matches the fee to the invoice using the printed boxesThe creditor reconciles the invoice from structured remittance information
A note back says the account was credited, if the offices agreed to send oneA positive status report, pacs.002, with ACCC, only where the service reports it
The association cannot read a box, so it returns the form before writing anythingReject: negative status report, pacs.002, with RJCT, before settlement; Bank Alfa reverses its debitWho: Meridian Bank
The association keeps a small handling fee, so the hostel gets a little lessShared charges: Meridian Bank takes off a fee, and camt.054 shows the deductionWho: Meridian Bank
No news comes, so the team's office asks about the reference numberBank Alfa sends a status request, pacs.028, quoting the referenceWho: Bank Alfa
The hostel's account is closed, so the fee comes home as a second entryReturn: reason AC04, then a pacs.004 that settles as a new movementWho: Cassia Bank
A name resembles a listed one, so the form waits while details are requestedSanctions hold: Meridian Bank asks Bank Alfa for details with camt.026; camt.028 answersWho: Meridian Bank
An address was cut off mid-word when copied from an older formTruncated address from an upstream translation; Meridian Bank repairs the recordWho: Meridian Bank
The hostel's office parks the fee in a waiting tray and asks the team's officeRequest for information: Cassia Bank holds funds in a suspense account and asks via camt.026Who: Cassia Bank

WHERE THIS PICTURE STOPS

  • The picture makes the tour association one firm that keeps a book. In the journey, Meridian Bank is a commercial bank. The balances it holds for the two banks are claims on it, not money held at the central bank. The journey draws no clearing system in the middle, so both banks rely on Meridian Bank.
  • The picture lets the association rub out an entry. Once the book transfer is made, it stays. Money comes home only as a new return, pacs.004, which settles as its own movement. Fees already taken do not come back on their own.
  • The picture's copy is paper, and paper can feel as if it holds the fee. A real bank-to-bank message, pacs.008, only states the amount. A delivery acknowledgement from the network alone does not show that the hostel's account was credited.
  • The picture's thank-you note always comes. In the journey a positive status report, pacs.002, is sent only where the service reports it. Even then it says the payment was accepted, not that the hostel can freely use the money.
  • The picture shows the list check as one step. In the journey every bank screens for itself, so a clear result at Bank Alfa grants nothing at Meridian Bank. A hold is the control working. A possible name match is a flag for a person to check, not a finding.
  • The picture has one association and one route. Real chains can have more banks. The seven turns are different outcomes, not steps that all happen to one payment. The charge figures in the journey are illustrative. The hop from Meridian Bank to Cassia Bank also rides Swift FINplus, but the drawing shows it direct.
  • The picture's question and answer is the classic exchange of the unable-to-apply request, camt.026, and the additional-information message, camt.028. How investigations work varies by service, corridor and migration date, so check the service rules before building anything on it.
  • The picture shows no calendar. Two things change with time. One is when the older Swift format and the newer one stopped running side by side for these instructions. The other is whether and when the structured-address rule starts. Read both in the site's current facts, not from this picture.

HOOK

One reference, three bank checks, one book transfer moves the money.

REMEMBER IT THIS WAY

A rule of thumb: if you see this, think that.

Trust the books, not the message. A pacs.008 states the amount, but money has moved only when the happens.

What each part of the trick stands for
In the trickWhat it stands for
pacs.008The bank-to-bank message pacs.008, which states the amount but carries no money
book transferBook transfer: Meridian Bank debits Bank Alfa's account and credits Cassia Bank's

The journey draws one middle bank, and a real chain with more banks has more books to check.

TELL A FRIEND

The company's bank checks the order and debits the company first, then sends a payment message with one fixed reference. A middle bank checks it again and moves the money in its own books, then the last bank checks and credits the supplier.

OFTEN MIXED UP WITH Settlement method: INGA, INDA, and COVE. That topic reads one label on one leg: which bank's books move the money, and whether that bank sent the message. This journey follows a whole payment from order to credit and shows seven turns.

MESSAGES INVOLVED

PRACTISE AND KEEP

IMPLEMENTATION RESOURCES

53 RESOURCES

EVIDENCE AT ARM'S REACH

Apply the base message definition first, then the scheme or infrastructure profile that governs this topic.

An XSD checks XML structure. A usage guideline adds profile rules, conditional fields, code restrictions, and business controls. XSD-valid does not mean scheme-compliant.

XSD + definitionBase ISO 20022

ISO 20022 message definitions and XSDs

OPEN OFFICIAL SOURCE
Usage guidelineCBPR+

CBPR+ usage guidelines

OPEN OFFICIAL SOURCE
Usage guidelineHVPS+

HVPS+ usage guidelines

OPEN OFFICIAL SOURCE
Usage guidelineFedwire

Fedwire Funds Service ISO 20022 implementation and technical documents

OPEN OFFICIAL SOURCE
Teaching sampleIllustrative; no scheme profile checked

camt.029 resolution of investigation — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.037 debit authorisation request — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.030 notification of case assignment — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.038 case status report request — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.039 case status report — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.031 reject investigation — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.035 proprietary format investigation — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.026 unable to apply — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.027 claim non-receipt — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.028 additional payment information — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.087 request to modify payment — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.110 investigation request — raw XML

PRO PASS
Teaching sampleIllustrative; no scheme profile checked

camt.111 investigation response — raw XML

PRO PASS
Lifecycle packIllustrative; no scheme profile checked

MX cancellation, return, reversal, and investigation lifecycle — ZIP pack

PRO PASS
MappingCBPR+

MT196 → camt.029 implementation mapping

PRO PASS
MappingCBPR+

MT296 cancellation answer → camt.029 implementation mapping

PRO PASS
MappingCBPR+

MT195 → camt.110 implementation mapping

PRO PASS
MappingCBPR+

MT295 → camt.110 implementation mapping

PRO PASS
MappingCBPR+

MT196 → camt.111 implementation mapping

PRO PASS
MappingCBPR+

MT199 query → camt.110 implementation mapping

PRO PASS
MappingCBPR+

MT199 answer → camt.111 implementation mapping

PRO PASS
MappingCBPR+

MT296 → camt.111 implementation mapping

PRO PASS
MappingCBPR+

MT299 query → camt.110 implementation mapping

PRO PASS
MappingCBPR+

MT299 answer → camt.111 implementation mapping

PRO PASS
MappingCBPR+

MT995 → camt.110 implementation mapping

PRO PASS
MappingCBPR+

MT996 → camt.111 implementation mapping

PRO PASS
Field matrixBase ISO 20022

camt.029 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.110 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.111 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.026 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.027 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.028 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.087 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.031 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.030 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.038 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.039 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.037 field matrix

PRO PASS
Field matrixBase ISO 20022

camt.035 field matrix

PRO PASS
Test packIllustrative; no scheme profile checked

Payment lifecycle test cases

PRO PASS
Field matrixFedwire

Fedwire Funds Service implementation pack field and process matrix

PRO PASS
Test packFedwire

Fedwire Funds Service implementation pack test cases

PRO PASS
BA checklistFedwire

Fedwire Funds Service implementation pack BA checklist

PRO PASS
Acceptance criteriaFedwire

Fedwire Funds Service implementation pack acceptance criteria

PRO PASS
Migration notesFedwire

Fedwire Funds Service implementation pack migration notes

PRO PASS
Coverage gapsFedwire

Fedwire Funds Service implementation pack restricted and release-specific gaps

PRO PASS
Profile packCBPR+

CBPR+ implementation pack

PRO PASS
Profile packSEPA SCT

SEPA credit-transfer implementation pack

PRO PASS
Profile packFedwire

Fedwire Funds Service implementation pack

PRO PASS
Sources for this topic — 18 sources
  1. Official requirement

    ISO 20022 Catalogue of messages ↗ — ISO 20022 Registration Authority · Exact camt.029.001.09 XSD: ResolutionOfInvestigationV09, InvestigationStatus5Choice and UnderlyingTransaction22; checks required case status, branch exclusivity and optional cancellation details (schema read).

    Defines the current versions of all ISO 20022 message definitions, including the pain, pacs, and camt messages taught on this site. · Checked 2026-07-12

    Each message set is described by a Message Definition Report; earlier versions remain available in the ISO 20022 messages archive.

  2. Official requirement

    ISO 20022 Catalogue of messages ↗ — ISO 20022 Registration Authority · camt.026, camt.027, camt.028, camt.087, camt.029, camt.110 and camt.111 message definitions

    Defines the current versions of all ISO 20022 message definitions, including the pain, pacs, and camt messages taught on this site. · Checked 2026-07-12

    Each message set is described by a Message Definition Report; earlier versions remain available in the ISO 20022 messages archive.

  3. Official requirement

    ISO 20022 External code sets ↗ — ISO 20022 Registration Authority · investigation execution confirmation and unable-to-apply code lists

    Defines the externally maintained code lists (for example category purpose, status reason, and return reason codes) referenced by ISO 20022 payment messages. · Checked 2026-11-22

    Updated quarterly in XLSX, XSD and JSON formats. The 22 November 2026 check opened the catalogue and the JSON distribution advertised as August 2026 v3. Its archive contains 2Q2026_externalcodesets_v3.json. ExternalPaymentGroupStatus1Code and ExternalPaymentTransactionStatus1Code define distinct code contexts. Bank Transaction Code combinations are published separately under iso20022-btc-codification. Earlier observation, kept for the record: Search summaries of the publisher's page on 2026-10-01 list an August 2026 release labelled v3; the page was not opened and the release name was not seen.

  4. Scheme-specific rule

    ISO 20022 change request CR0679: cancellation status reason codes for camt.029 ↗ — ISO 20022 Registration Authority · ADAC and RQDA as proposed cancellation status reasons for camt.029 (search excerpt, page not opened)

    An ISO 20022 change request that proposed moving the cancellation status reasons of camt.029 into an external code list. Cited only for the proposed code names: ADAC, worded as awaiting debit authority from the customer, and RQDA, worded as requesting debit authority from the customer.

    A change request is a proposal. Its wording is not a Swift definition and not proof of how any bank uses the code. · Checked 2026-10-12

    Known from web-search excerpts on the access date, page not opened. Adoption, the final code names and any Swift or Cross-Border Payments and Reporting Plus (CBPR+) usage were not confirmed.

  5. Scheme-specific rule

    Cross-Border Payments and Reporting Plus (CBPR+) usage guidelines ↗ — Swift (CBPR+ working group)

    Defines how ISO 20022 messages (including pacs.008, pacs.009, pacs.002, pacs.004, and camt investigation messages) are used and validated for cross-border payments on the Swift network. · Checked 2026-07-18

    Full guidelines require MyStandards access. Public guidance had set 14 November 2026 as the date after which fully unstructured addresses would be removed for in-scope CBPR+ traffic. The explicit message exceptions included admi.024, camt.025, camt.052, camt.053, camt.054 and camt.060. Swift has since deferred that requirement and set no replacement date. The current fact swift-cbpr-unstructured-address-removal carries the position.

  6. Scheme-specific rule

    ISO 20022 Standards (Swift ISO 20022 adoption programme) ↗ — Swift · Exceptions and Investigations transformation

    Describes current CBPR+ adoption, the 22 November 2025 end of coexistence for in-scope FI-to-FI payment instructions, later migration work and the structured-address milestone. That milestone was previously due in November 2026 and has since been deferred (see swift-sr2026-controlled-extension-2026). · Checked 2026-07-18

    Do not generalise the payment-instruction deadline to every FIN message. Swift publishes differentiated NAK, contingency-conversion, reporting, initiation and exceptions-and-investigations treatment.

  7. Scheme-specific rule

    ISO 20022: Exceptions and Investigations — frequently asked questions ↗ — Swift · The camt.110 and camt.111 replacements for MT n95 and n96, and their receive and removal milestones; read from an Internet Archive snapshot of 22 August 2026

    Swift's own FAQ on the exceptions-and-investigations migration, cited for four statements it makes in plain words.

    Which messages replace which: camt.110 as the investigation request and camt.111 as the investigation response, against the MT n95 queries and MT n96 answers, with camt.056 and camt.029 taking the cancellations.

    That camt.110 and camt.111 can only be exchanged through the Case Orchestrator and cannot be exchanged bilaterally, which is the difference between them and every FIN message they replace.

    That from November 2026 every institution must be able to receive a camt.110 carrying an in-flow translation with an embedded MT 199 inside it, and that in-flow translation for non-instruction messages remains free of charge.

    And the sentence the free-format decision rests on. From November 2027 the formatted MT messages for cancellations and for exceptions and investigations are removed, while "Free format messages (MT n99) will still be available but should not be used for E&I purposes". · Checked 2026-08-23

    swift.com does not respond — requests to it time out rather than returning a status. So the page was read through the Internet Archive's copy of the publisher's own URL, snapshot 20260822215634, HTTP 200, 163,796 bytes, and the text extracted from that HTML. The words are the publisher's; only the route to them is the archive's.

    It is a service FAQ, not a message definition. Its scope is the cross-border payment categories, so it names the Category 1 and Category 2 members — MT 195/198/295/298 and MT 199/299 — and does not mention the Category 9 members at all. The Category 9 pairings are sourced from Swift's CBPR+ coexistence deck instead. It does not mention admi.024.

    Every presence flag and element address on the tables it supports is read from the published schema rather than from here.

    Undated as a page. Its milestones are dated and will move; recheck the live page before using one in delivery planning.

  8. Scheme-specific ruleJune 2026 edition read in full; September 2026 edition seen as search excerpts only

    CBPR+ roadmap beyond November 2025 ↗ — Swift · Exceptions and investigations milestones; the September 2026 edition was seen as search excerpts only, page not opened

    Current roadmap for post-coexistence Cross-Border Payments and Reporting Plus (CBPR+) work, including contingency processing, payment initiation relay, reporting and exceptions-and-investigations migration milestones.

    Cited on the MT999 record for the E&I pairing: free-format MT199 (free-format message) / MT299 (free-format message) / MT999 used for exceptions and investigations migrate to camt.110 (investigation request) and camt.111 (investigation response). Non-E&I MT199/MT299 use cases are a different row and go to admi.024 (notification of correspondence).

    Also cited for the cheque row: camt.107 (cheque presentment notification), camt.108 and camt.109 (cheque cancellation or stop report) map to MT (message type) 110, MT 111 and MT 112, and cheques continue MT and ISO coexistence until further notice (search excerpt of swift-resource/252463, page not opened). The coexistence statement can change between dated editions, so no current fact is registered and lessons tell the reader to read the current edition. · Checked 2026-10-04

    Roadmap dates and message treatment are service-specific and can change. Recheck the current document before using a milestone in delivery planning.

    The June 2026 download (swift.com/swift-resource/252463/download) is the same programme this document-centre page points at. It lists, under exceptions and investigations, MT199 / MT299 / MT999 as retired for E&I in favour of camt.110 and camt.111, and it separately sends non-E&I MT199/MT299 use cases to admi.024 by November 2027. That pairing is what the MT999 record's ISO counterpart note now cites. The document-centre URL stays the registered address because it is the publisher's standing location for the current file.

    Re-checked on 2026-10-04 by web search. The roadmap now has a September 2026 edition at swift.com/swift-resource/252463/download, and only search excerpts of it were seen; the page was not opened.

    The excerpts said the exceptions and investigations changes were deferred, and that the mandate to receive a camt.110 would come with the deferred part of Standards Release 2026. They also said the roadmap's dates might be out of date until the scope and timeline of that release, and of Standards Release 2027, are confirmed. Other lines of the same roadmap still gave November 2026 for receiving a camt.110, so the excerpts disagree with each other. The fact swift-exceptions-investigations-migration-milestones records both readings.

  9. Scheme-specific rule

    Case Management — Info sheet ↗ — Swift · Case Orchestrator and Stop and Recall as the two Case Management services

    Swift's public Case Management info sheet, used for the service-level investigation catalogue and the Case Orchestrator flow. It lists CCNR, CONR, RQFI–UTEX (unable to execute) and UTAP as supported investigation use cases, and it shows RQFI–SANC (sanctions) and RQFI–COMP (compliance) as a later expansion. The October 2025 sheet labelled SANC and COMP as available in November 2026; that date is historical, not current. Swift's later SR2026 update moved deferred exceptions-and-investigations message changes out of the November 2026 release. Check the current Case Management and MyStandards profile before treating a planned use case as live. · Checked 2026-10-07

    Official Swift PDF dated October 2025. It says camt.110 requests and camt.111 responses are routed through the central Case Orchestrator, and it gives the public Case Management use-case list. Use it for the taxonomy and orchestration model, not as today's release-date authority. The later date authority is swift-sr2026-controlled-extension-2026.

    The sheet names SANC (sanctions) and COMP (compliance) at the business-use-case level. The finer breakdown into AMLI (anti-money laundering), FCCI (financial-crime compliance), FRAD (fraud), FWTR (funds/wire-transfer regulation) and OTHR (other) is cross-checked against the participant implementation FAQ bny-iso20022-migration-faq and the effective Swift usage guideline.

  10. Scheme-specific rule

    ISO 20022: Exceptions and Investigations — frequently asked questions ↗ — Swift · Migration milestones for camt.110/camt.111 and Stop and Recall

    Swift's own FAQ on the exceptions-and-investigations migration, cited for four statements it makes in plain words.

    Which messages replace which: camt.110 as the investigation request and camt.111 as the investigation response, against the MT n95 queries and MT n96 answers, with camt.056 and camt.029 taking the cancellations.

    That camt.110 and camt.111 can only be exchanged through the Case Orchestrator and cannot be exchanged bilaterally, which is the difference between them and every FIN message they replace.

    That from November 2026 every institution must be able to receive a camt.110 carrying an in-flow translation with an embedded MT 199 inside it, and that in-flow translation for non-instruction messages remains free of charge.

    And the sentence the free-format decision rests on. From November 2027 the formatted MT messages for cancellations and for exceptions and investigations are removed, while "Free format messages (MT n99) will still be available but should not be used for E&I purposes". · Checked 2026-08-23

    swift.com does not respond — requests to it time out rather than returning a status. So the page was read through the Internet Archive's copy of the publisher's own URL, snapshot 20260822215634, HTTP 200, 163,796 bytes, and the text extracted from that HTML. The words are the publisher's; only the route to them is the archive's.

    It is a service FAQ, not a message definition. Its scope is the cross-border payment categories, so it names the Category 1 and Category 2 members — MT 195/198/295/298 and MT 199/299 — and does not mention the Category 9 members at all. The Category 9 pairings are sourced from Swift's CBPR+ coexistence deck instead. It does not mention admi.024.

    Every presence flag and element address on the tables it supports is read from the published schema rather than from here.

    Undated as a page. Its milestones are dated and will move; recheck the live page before using one in delivery planning.

  11. Scheme-specific rule

    Payments Market Practice Group (PMPG) market practice guidelines for exceptions and investigations ↗ — Swift / Payments Market Practice Group · Search excerpt, page not opened: status-update rhythm for open cases

    Cited for one idea: the status-update rhythm the guideline asks of the bank holding an open exceptions or investigations case (E&I #8). It is market practice agreed by a group, not a rule a scheme owner imposes, and it applies only where no different prior agreement exists. · Checked 2026-10-11

    Verification boundary. The PDF was not opened. The rhythm was recovered from two WebSearch results restricted to swift.com on 2026-10-11 and is cited at search-excerpt strength. A later search result described it as Version 1.0 from November 2012, a date taken from search excerpts only and possibly superseded. The guideline is written for the MT-era message set; the search did not confirm a camt.110 or camt.111 equivalent.

  12. Market practice

    ISO 20022 Catalogue of messages ↗ — ISO 20022 Registration Authority · camt.030 Notification of Case Assignment (NotificationOfCaseAssignmentV06 listed in the ISO 20022 catalogue): notifies the case assigner that a case has been assigned to the next party in the payment chain, or that the assignee will do the cancellation, modification or correction itself (SWIFT Exceptions and Investigations MDR, search excerpt, page not opened; catalogue pages not opened)

    Defines the current versions of all ISO 20022 message definitions, including the pain, pacs, and camt messages taught on this site. · Checked 2026-07-12

    Each message set is described by a Message Definition Report; earlier versions remain available in the ISO 20022 messages archive.

  13. Market practice

    ISO 20022 Catalogue of messages ↗ — ISO 20022 Registration Authority · camt.037 Debit Authorisation Request (DebitAuthorisationRequestV09 listed in an ISO maintenance document): sent to the creditor of the original payment instruction, by its account servicing institution, after a cancellation request on a credit transfer already processed; answered by camt.036. RQDA = Requesting Debit Authority From Customer and ADAC = Awaiting Debit Authority From Customer, per ISO change request CR0679 (search excerpts, pages not opened; CR0679 is a request and adoption was not confirmed)

    Defines the current versions of all ISO 20022 message definitions, including the pain, pacs, and camt messages taught on this site. · Checked 2026-07-12

    Each message set is described by a Message Definition Report; earlier versions remain available in the ISO 20022 messages archive.

  14. Market practice

    ISO 20022 Catalogue of messages ↗ — ISO 20022 Registration Authority · camt.035 Proprietary Format Investigation (ProprietaryFormatInvestigationV05 listed in the ISO 20022 catalogue): envelope for a non-standard message, to be used only where bilaterally agreed and when no standard message fits; ProprietaryData holds well-formed XML (search excerpt of third-party and catalogue listings, pages not opened)

    Defines the current versions of all ISO 20022 message definitions, including the pain, pacs, and camt messages taught on this site. · Checked 2026-07-12

    Each message set is described by a Message Definition Report; earlier versions remain available in the ISO 20022 messages archive.

  15. Market practice

    ISO 20022 Catalogue of messages ↗ — ISO 20022 Registration Authority · camt.038 Case Status Report Request: asks the case assignee for the status of one case; to be sent only when an expected update is overdue (iotafinance listing and SWIFT E&I MDR, search excerpts, pages not opened)

    Defines the current versions of all ISO 20022 message definitions, including the pain, pacs, and camt messages taught on this site. · Checked 2026-07-12

    Each message set is described by a Message Definition Report; earlier versions remain available in the ISO 20022 messages archive.

  16. Market practice

    ISO 20022 Catalogue of messages ↗ — ISO 20022 Registration Authority · camt.039 Case Status Report: reply to a case status request, one case per message; an assignee that already has an answer may send camt.029 instead (iotafinance listing and SWIFT E&I MDR, search excerpts, pages not opened)

    Defines the current versions of all ISO 20022 message definitions, including the pain, pacs, and camt messages taught on this site. · Checked 2026-07-12

    Each message set is described by a Message Definition Report; earlier versions remain available in the ISO 20022 messages archive.

  17. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: The classic case set is shown as four requests and one answer; reachability and retirement milestones for MT investigation use are scheme-specific and dated.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

  18. Scheme-specific rule

    ISO 20022 change request: claim non-receipt, modification and resolution of investigation (milestone 15791) ↗ — ISO 20022 Registration Authority · Change request, milestone 15791: NOOR and RNPR meanings for camt.029.001.07, camt.027.001.05 and camt.087.001.04; NOOR also in the return reason codes (search excerpt, page not opened; adoption and current versions not confirmed)

    Used for the meanings of two reason codes, NOOR and RNPR, in the ISO 20022 change request that adds a claim-non-receipt block to the camt.029 resolution message, and for the message versions that request names. · Checked 2026-10-12

    Known from a web-search excerpt on the access date, page not opened. The excerpt says the request targets camt.029.001.07, camt.027.001.05 and camt.087.001.04, and that NOOR already exists in the return reason code list. Whether the request was approved, and which codes the current versions carry, were not confirmed. This is an ISO catalogue source. The CBPR+ usage text sits in MyStandards, which is member-only, and was not read.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.