GLOSSARY / DEFINITION

SIC interbank implementation guidelines

CURRENT AS CHECKED

1 FIGURE
  • SIX interbank guidelines for ISO 20022: SIC platform release names and entry-into-force dates

    (Swiss Infrastructure and Exchange) publishes the Implementation Guidelines for ISO 20022 Interbank Messages by platform release. Its download listing gives 15 November 2024 as the entry into force for Releases 4.11 and 5.1, 21 November 2025 for Releases 4.12 and 5.2, and 13 November 2026 for Release 5.3. The 2025 base document is version 2.5; the Release 5.3 base document is version 2.7, valid from 13 November 2026.

    Release 5.3 was scheduled to on Friday 13 November 2026, and on 20 November 2026 SIX still lists that date with no postponement notice. Its release notes v1.3 state that the proposed discontinuation of unstructured addresses is not implemented with 5.3; retained earlier proposal prose is not an operative ban. Business-version tables in those notes switch SIC and euroSIC from 4.12 to 5.3 from clearing day 16 November 2026 after the release implementation.

    SIX’s Swiss Payments page says the 13 November 2026 SIC release proceeds with adjusted scope, and that address validation is waived so unstructured addresses may still arrive.

    CHECKED 2026-11-20RECHECK BY 2027-02-20

    Sources & standards — 3 sources
    1. Scheme-specific rule

      SIX Payment Standardization Download Center ↗ — SIX · Re-checked 20 November 2026: Release 5.3 entry into force listed as 13 November 2026.

      SIX's download listing for the Swiss payment standards. Cited only for the SIC platform release names and their entry-into-force dates for the interbank guidelines, and for the processing-rules and QR-bill guideline versions it lists. · Checked 2026-11-12

      Search excerpt, page not opened: found by WebSearch on 2026-10-11 (allowed domains six-group.com). The search tool reported Release 5.3 (2026) with entry into force 13 November 2026, Releases 4.12 and 5.2 with 21 November 2025, and 4.11/5.1 with 15 November 2024; module documents for SIC and euroSIC RTGS updated 21 September 2026. Confirm the dates on the page before relying on them.

      V44 actual QR-bill listing read6November2026: v2.4 introduction13November2026 andv2.3 validity untilNovember2027. The new introduction does not by itself end predecessor validity. Earlier historical platform entries retain their prior bounded evidence.

      Re-checked 12 November 2026: SIC Platform Release 5.3 entry into force still listed as 13 November 2026; QR-bill v2.4 entry into force listed as 14 November 2026, introduced with the SIC release of 13 November 2026; v2.3 remains valid until November 2027.

      Second-pass 12 November 2026: Release 5.3 still listed future valid / entry into force 13 November 2026.

    2. Scheme-specific rule2.5

      Implementation Guidelines for ISO 20022 Interbank Messages — base document ↗ — SIX Interbank Clearing Ltd · 2025 base document version 2.5 (registered); Release 5.3 base document version 2.7 valid from 13 November 2026 seen in web-indexed PDF.

      The rules agreed by the Swiss interbank governance bodies and binding on all SIC and euroSIC participants, issued under the platform releases named in its own title page. It is a base document valid for all services plus module documents per message, with pacs.008 as the base for customer payments.

      Cited for the instruction identifier being carried from the original initiation message, the end-to-end identifier being created by the originator, and the requirement that a split payment carry a new unique end-to-end transaction reference. · Checked 2026-11-06

      Published openly and NOT opened: the publisher's host could not be fetched (a reachability gap, not a statement about the publisher). The same boundary already recorded on this site's QR-bill entry, whose copy was read through an open-source mirror that carries only the QR-bill documents. Verified from independent web-search excerpts in English and German on the access date. No requirement column and no code value is quoted from it anywhere on this site.

      V44 actual2025v2.5 selected§2.2 and§4.6 read: CH-specific namespaces are real, and schema restrictions differ from business validation. Separate service modules control their own uses. Do not treat the withdrawn2026 address proposal as operative from an older edition.

    3. Scheme-specific ruleIn force1.3,21September2026; release5.3

      Release Notes Release2026, SIC RTGS/SIC IP/euroSIC ↗ — SIX Interbank Clearing · Release notes v1.3 re-checked 20 November 2026: go-live Friday 13 November 2026, a date now passed; address change not implemented with 5.3.

      SIC Platform Release Notes 5.3 (v1.3, 21 September 2026). Go-live Friday 13 November 2026 for SIC RTGS, SIC IP and euroSIC; that date has passed, and on 20 November 2026 SIX's download listing still gives 13 November 2026 as the entry into force, with no postponement notice found. Selected notes: unstructured-address discontinuation is not implemented with 5.3; business-version changes apply from the stated clearing days. Does not establish Swift or SEPA requirements. · Effective 2026-11-13 · Checked 2026-11-20

      Official SIX download-centre PDF opened via web search 12 November 2026. Status adopted-not-yet-effective until the 13 November 2026 go-live; re-read and set in-force after that date.

      Second-pass 12 November 2026: go-live still Friday 13 November 2026; Swiss Payments page says release proceeds with adjusted scope and address validation waived.

      Re-read 20 November 2026, after the go-live date: the release notes PDF, the SIX ISO 20022 standards page and the Download Center still list Release 5.3 with entry into force 13 November 2026, and the Swiss Payments page still says the release proceeds as planned with adjusted scope and address validation waived. Status set to in-force from that date.

BROWSE THE COMPLETE GLOSSARY →