GLOSSARY / DEFINITION

Hybrid address

CURRENT AS CHECKED

2 FIGURES
  • Swift CBPR+ postal-address usage

    Swift has deferred the requirement to use hybrid or fully structured postal addresses, previously due to start 14 November 2026, after community readiness concerns. No replacement date has been set. Swift has said it will consult industry and communicate revised timing by December 2026 at the latest.

    Checked 6 November 2026: the live campaign/FAQ still display the original date, but the dated 27 August announcement updated 21 September records the deferral. The 12 June 2027 partial release covers other stated message changes; it is not the address-retirement date. The ’s separate by February 2027 decision horizon does not set Swift’s date.

    CHECKED 2026-11-06RECHECK BY 2027-01-05

    Sources & standards — 3 sources
    1. Official requirement

      Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · Deferral of SR2026 payments changes, including the structured-address requirement, and the promised update by December 2026

      Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

      Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

      Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

    2. Official requirement

      Unstructured address data is being removed ↗ — Swift · The original requirement now under deferral: hybrid/structured formats and message exceptions

      Original CBPR+ postal-address scope, including the minimum town-and-country requirement, hybrid or fully structured formats, and explicit message exceptions. The 14 November 2026 start date this page names is superseded; see swift-sr2026-controlled-extension-2026. · Checked 2026-11-06

      This is a CBPR+ rule, not a universal ISO 20022 rule. EPC schemes publish their own address dates and scope. The BIC-only option for agents is stated on the companion FAQ (swift-unstructured-address-faq), not on this campaign page. Superseded on the date question only: Swift deferred this requirement on 27 August 2026 with no replacement date set (swift-sr2026-controlled-extension-2026). The scope and format description above is unaffected.

      Follow-up 6 November 2026: current campaign and FAQ still display the original 14 November 2026 date. The dated 27 August announcement updated 21 September separately defers address migration. Keep the format/message-scope guidance distinct from that superseded date. The 12 June 2027 partial-release date and EPC’s by February 2027 decision horizon are not replacement CBPR+ address deadlines.

    3. Official requirement

      Swift accepts community request to extend structured address migration for ISO 20022 payment messages ↗ — Swift · 27 August 2026 announcement updated 21 September: address timing remains separate; 12 June 2027 partial release scope is not the address-retirement date.

      Swift's own announcement of 27 August 2026, updated on 21 September 2026, for the controlled extension of Standards Release 2026. Swift deferred the payments changes that had been planned for November 2026. The structured-address requirement remains on a separately managed timetable. The 21 September update sets 12 June 2027 for the deferred SR2026 package covering all MT messages except Category 1, ISO 20022 securities and funds messages, Tracker messages, and exceptions-and-investigations messages. This source therefore supersedes older November 2026 dates for SR2026 E&I message changes. · Checked 2026-11-12

      Publisher page opened again on 5 November 2026. The 27 August announcement and 21 September update remain visible. Deferred SR2026 message changes include E&I and go live on 12 June 2027. It does not set 12 June 2027 as the new structured-address deadline. The explicit camt.110 receive wording is on the separate translation FAQ; compare the older Case Management page before asserting a date. No closed Knowledge Centre detail was inferred.

      Re-checked 12 November 2026: no November 2026 SR2026 activation; deferred non-payments package still listed for 12 June 2027; payments changes still deferred with December 2026 update horizon.

  • 2025 EPC payment scheme rulebooks — address-format migration

    The Management Board decided on 9 September 2026 to delay the previously planned 15 November 2026 end date for fully unstructured addresses. The 2025 version 1.2 rulebooks published 30 September 2026 reflect that delay. The five affected payment schemes are SCT, SCT Inst, SDD Core, SDD B2B and OCT Inst.

    On 29 October 2026, the board postponed setting a replacement end date. The EPC announced this on 30 October. The board will reconvene by February 2027 to decide a new end date. February 2027 is not a new retirement deadline. Structured and hybrid formats remain supported, and the EPC recommends that migration work continue.

    A second pass on 12 November 2026 found no newer replacement end date.

    CHECKED 2026-11-12RECHECK BY 2027-02-28

    Sources & standards — 4 sources
    1. Scheme-specific rule2025 version 1.2 (EPC125-05)

      2025 SEPA Credit Transfer rulebook version 1.2 (EPC125-05) ↗ — European Payments Council · Opened 2025 v1.2 cover: unstructured addresses supported beyond 15 November 2026, with a new end date to be set.

      Governs the SEPA Credit Transfer scheme: participant obligations, datasets, time cycles, and r-transaction rules for euro credit transfers. · Effective 2026-09-30 · Checked 2026-10-03

      Version 1.2 formally replaced version 1.1 at its publication on 30 September 2026 (the European Payments Council's wording, seen as a search excerpt; the page was not opened). Its change is limited to the address-message elements: the previously planned end date for unstructured addresses is delayed, unstructured addresses remain supported beyond 15 November 2026, and the EPC will set a new end date later. The EPC states that version 1.2 makes no other business or operational rule changes compared with version 1.1.

      Follow-up 7 November 2026 for shared authored sponsor flow only: actual current publication page read plus selected v1.2 PDF printed pages 23–29 (sections 3.1–3.6, 4.2 and 4.3.1). Intermediaries do not modify scheme PSP obligations; bilateral/CSM arrangements and cutoff boundaries are distinct. This is not a complete 150-page read or visual/field-profile certification.

    2. Scheme-specific rule2025 version 1.2 (EPC004-16)

      2025 SEPA Instant Credit Transfer rulebook version 1.2 (EPC004-16) ↗ — European Payments Council · Opened 2025 v1.2 cover: unstructured addresses supported beyond 15 November 2026, with a new end date to be set.

      Governs the SCT Inst scheme: execution time targets, timeout handling, round-the-clock availability, and r-transaction rules for instant euro credit transfers. · Effective 2026-09-30 · Checked 2026-11-12

      Version 1.2 formally replaced version 1.1 at its publication on 30 September 2026 (the European Payments Council's wording, seen as a search excerpt; the page was not opened). The change is limited to address-message elements and delays the previously planned end date for unstructured addresses. The EPC states that no other business or operational rules changed compared with version 1.1.

      Selected primary follow-up7November2026: actual EPC004-16 2025v1.2 PDF, issued/effective30September2026, operative4.2.1–3A–D/fn14,4.3.1 and4.3.2.1–4 read. Successful checks require reservation; formal debit follows Originator PSP receipt of positive confirmation; beneficiary availability follows certainty of delivery to its CSM. Restoration lifts the reservation while settlement certainty continues until confirmation; late-positive notice is required and further action is outside the Scheme.

      Recall and RFRO have distinct grounds and authorisation rules. Not all142pages, AnnexIII, licensed implementation guidelines, private CSM profiles or reproduction permission. Prior search-only release-history note remains historical.

      Re-checked 12 November 2026: 2025 SCT Inst rulebook version 1.2 remains the edition in effect; published/effective 30 September 2026; unstructured-address end date removed with no replacement yet.

    3. Official requirement

      EPC delays address format migration timeline ↗ — European Payments Council · September 2026 decision to delay the unstructured-address end-date

      The EPC's own announcement that its Payment Scheme Management Board (PSMB) decided to delay the planned 15 November 2026 end-date for unstructured postal addresses. The decision covers all five EPC payment scheme rulebooks: SEPA Credit Transfer (SCT), SCT Instant (SCT Inst), SEPA Direct Debit Core and Business-to-Business (SDD Core and SDD B2B), and One-Leg Out Instant Credit Transfer (OCT Inst). The PSMB took the decision at its meeting on 9 September 2026.

      At publication, no replacement date was set and the announcement anticipated an October 2026 meeting and documentation update. Those were historical forecasts. The later 30 October 2026 announcement records the 29 October decision to postpone setting an end date and reconvene by February 2027; cite v31-epc-address-decision-20261029 for that current status. The notice states the delay does not change the EPC's own commitment to structured addresses, and that participants should keep their migration plans in place.

      Cited here for the fact of the delay, the prior 15 November 2026 date, and the 9 September 2026 PSMB meeting date. Also cited for the absence of a replacement date, and for the October 2026 meeting and documentation timeline. · Checked 2026-11-06

      Directly re-verified against the EPC's official announcement and official news listing on 21 September 2026. The announcement states that the PSMB decision was taken at its 9 September 2026 meeting, while the EPC news listing dates the article 10 September 2026. The official EPC material identifies the five payment scheme rulebooks as SCT, SCT Inst, SDD Core, SDD B2B and OCT Inst. Verification of Payee is a separate EPC scheme and is not one of the five rulebooks carrying this postal-address deadline.

      Follow-up 6 November 2026: initial announcement opened in full alongside the later 30 October announcement. The former October meeting forecast must not be repeated as still future. Original source identity and September chronology are preserved.

    4. Official requirement

      EPC defers setting new end date for unstructured address format until February 2027 ↗ — European Payments Council · Complete announcement published 30 October 2026: PSMB 29 October decision; reconvene by February 2027 to decide an end date, not retirement in February.

      PSMB decision 29 October 2026 postpones setting a replacement end date for unstructured addresses under all five EPC payment scheme rulebooks: SCT, SCT Inst, SDD Core, SDD B2B, OCT Inst. The board will reconvene by February 2027 to decide a new end date. February is the decision horizon, not a retirement date. · Checked 2026-11-12

      Full official article opened 6 November 2026. EPC home/news listings confirm publication 30 October 2026. The article preserves support for structured/hybrid addresses and recommends continuing migration. It does not set Swift, TIPS, T2, CHAPS, Fedwire or a proprietary-bank cutover date.

      Second-pass 12 November 2026: no newer end date; February 2027 reconvene horizon unchanged.

BROWSE THE COMPLETE GLOSSARY →